El Dorado County Water Systems Energy Generation Project - Fact Sheet

Publication Number:    CEC-500-2012-FS-014

Abstract:
The project will build upon existing infrastructure in El Dorado County, focusing on efficiency, conservation, peak demand reduction, and water storage improvements via upgraded best management practices. It will seek ways to incorporate newer technologies by analyzing technology, engineering, operational methods, and potential equipment upgrades in selected existing treated and raw water systems within the El Dorado Irrigation District and the Georgetown Divide Public Utility District service areas. The project will evaluate the ability to integrate energy and water management operations, load management, and renewable energy options in supporting the electric grid.

Commission Division:    Technology Systems Division - R&D, PIER (500)

Office/Program:    PIER: Public Interest Energy Research

PIER Program Area:    Renewable Energy Technologies

Date Published:    March 2012

Date On Line:    03/20/2012

Acrobat PDF File Size: 2 pages, 172 kilobytes

cover of report

Return to Search Page