Renewable Energy Transmission Initiative Phase 1B, DRAFT Final Report

Publication Number:    RETI-1000-2008-003-D

Abstract:
RETI is a collaborative stakeholder planning process initiated as a joint effort among the California Public Utilities Commission (CPUC), the California Energy Commission (Energy Commission), and the California Independent System Operator (CAISO), together with publicly owned and investor owned utilities. RETI’s work is undertaken by a 29-member Stakeholder Steering Committee (SSC) that involves a broad range of participants1, first to gather information and advice, and then to build active and consensus support for specific plans for renewable energy and related transmission development.

The ultimate goal of RETI’s work is to identify major upgrades to California’s electric transmission system needed to access competitive renewable energy zones (CREZs) sufficient to meet the state’s energy targets. Phase 1 of this effort is to identify those CREZs that can be developed in the most cost effective and environmentally benign manner, as described in this draft report.

The Phase 1A report, accepted by the SSC on May 21, 2008, described the methodology, assumptions and resource information to be used in Phase 1B of RETI project.

This Draft Phase 1B Report is a high-level screening analysis that applies the resource valuation methodology developed in Phase 1A. Potential renewable energy projects have been grouped into CREZs based on geographical proximity, development timeframe, shared transmission constraints, and additive economic benefits. As described in this draft report, CREZs have been ranked according to cost effectiveness, environmental concerns, development and schedule certainty, and other factors to provide a renewable resource base case for California. This analysis is undergoing review and refinement by the SSC, and will be further refined in Phase 2.

Phase 2 will refine the analysis of CREZ generation potential, including project siting constraints, and will develop a statewide conceptual transmission plan. Phase 3 will develop transmission plans of service to provide access to the grid for identified priority CREZs.

Author(s):  Black and Veatch

Commission Division:    Non-CEC Document On Line (1000)

Office/Program:    External Agency

PIER Program Area:   

Date Report Completed:    December 2008

Date On Line:    12/05/2008

Acrobat PDF File Size: 337 pages, 10,800 kilobytes**