Documents Pages for 2007 Integrated Energy Policy Report Proceeding
For 2006 Documents, please see a separate page.
Docket # 06-IEP-1
Most files are available as Adobe Acrobat Portable Document Format (PDF) files.To download, navigate and print these files you will need Acrobat Reader 7.0. It is available from Adobe Systems website.
If the file is large, you may need to 'force download' the file to your hard drive by "right-clicking" the link (option click on Macintosh).
2007 Workshops & Meetings (click here)
2007 Integrated Energy Policy Report,
Final Commission Report. Publication # CEC-100-2007-008-CMF.
(PDF, 252 pgs, 26.9 MB - note size!). Posted: February 1, 2008.
Executive Summary to 2007 Integrated Energy Policy Report, Commission Adopted Report. (PDF file, 34 pgs., 1.7 MB)
2007 Integrated Energy Policy Report,
Committee Final Report. Publication # CEC-100-2007-008-CTF.
(PDF, 301 pgs, 3.5 MB). Posted: November 7, 2007
2007 Integrated Energy Policy Report,
Errata to Final Committee Report. Publication # CEC-100-2007-008-CTF-ERRATA.
(PDF, 8 pgs, 248 kb). Posted: December 5, 2007
2007 Integrated Energy Policy Report,
Draft Committee Report. Publication # CEC-100-2007-008-CTD.
(PDF, 292 pgs, 3.5 MB). Posted: October 2, 2007
Public Comments on 2007 IEPR Report Draft Committee Report
SUPPORTING DOCUMENTS TO FINAL REPORT
Final Reports & Other Documents (Not Related to a Specific Meeting)
Progress Report on Resource Adequacy Among Publicly Owned Load-Serving Entities in California, Staff FINAL Report. Publication # CEC-200-2007-016-SF. (PDF, 119 pgs, 965 kb). Posted: May 21, 2008
Geologic Carbon Sequestration Strategies for California: The Assembly Bill 1925 Report to the California Legislature , Final Joint Agency Report, Publication # CEC-500-2007-100-CMF. Posted: April 4, 2008. (PDF file, 156 pgs., 2.0 MB)
2007 Environmental Performance Report, Final Staff Report publication # CEC-700-2007-016-SF. (PDF, 139 pgs, 6.7 mb - note size). Posted: January 28, 2008
A Mean-Variance Portfolio Optimization of California's Generation Mix to 2020: Achieving California's 33 Percent Renewable Portfolio Standard Goal, Final Consultant Report, publication # CEC-300-2007-009-F. (Acrobat PDF file, 99 pgs, 864). Posted: January 22, 2008.
Achieving All Cost-Effective Energy Efficiency for California, Final Staff Report. Publication # CEC-200-2007-019-SF. (PDF, 240 pgs, 1.4 megabytes). Posted: December 12, 2007
2007 Final Natural Gas Market Assessment, Final Staff Report. Publication # CEC-200-2007-009-SF. (PDF, 201 pgs, 1.4 megabytes). Posted: December 11, 2007
Comparative Costs of California Central Station Electricity Generation Technologies, Final Staff Report. Publication # CEC-200-2007-011-SF. (PDF, 200 pgs, 1.06 MB). Posted: December 6, 2007
Geologic Carbon Sequestation Strategies for California: The Assembly Bill 1925 Report to the California Legislature, Final Staff Report. Publication # CEC-500-2007-100-SF. (PDF, 156 pgs, 2.0 MB). Posted: November 21, 2007
Strategic Transmission Investment Plan, FINAL Commission Report, publication # CEC-700-2007-018-CMF. (PDF, 184 pgs, 1.4 mb). Posted: November 15, 2007
Strategic Transmission Investment Plan, FINAL Joint Committees Report, publication # CEC-700-2007-018-CTF. (PDF, 184 pgs, 1.2 mb). Posted: October 24, 2007
California Energy Demand 2008 - 2018: Staff Revised Forecast, FINAL Staff Forecast, 2nd Edition, publication # CEC-200-2007-015-SF2. (Acrobat PDF file, 259 pgs, 3.4 MB). Posted: 11/16/07, updated 11/27/07.
Zipped file Containing an Excel Version of the Tables Contained in the Report, publication # CEC-200-2007-015-SF2. (Zip File, 468 kb). Posted: 11/16/07, updated 11/27/07.
Errata Replacing Table "1.5a Net Energy for Load by Control Area." - Replaces PDF page 57 or Document Page 42, publication # CEC-200-2007-015-SF. (Acrobat PDF file, 1 pgs, 204 kb). Posted: 10/26/07.
The State of Demand Response in California - FINAL CONSULTANT. Publication # CEC-200-2007-003-F. (PDF, 88 pgs, 932 kb). Posted: October 18, 2007
Nuclear Power in California: Status Report 2007, FINAL Consultant Report. Publication # CEC-100-2007-005-F. (PDF, 332 pgs, 4.4 megabytes). Posted: October 17, 2007
Transportation Energy Forecasts For The 2007 Integrated Energy Policy Report, Final Staff Report. Publication # CEC-600-2007-009-SF, posted: September 24, 2007. (PDF file, 84 pages, 740 kilobytes)
The Role of Land Use in Meeting California's Energy and Climate Change Goals, Final Staff Report. Publication # CEC-600-2007-008-SF, posted: August 31, 2007. (PDF file, 92 pages, 3.1 megabytes)
Portfolio Analysis And Its Potential Application To Utility Long-Term Planning, Final Staff Report. Publication # CEC-200-2007-012-SF, posted: August 29, 2007. (PDF file, 184 pgs., 1.4 mb)
Assessing System Benefits of Renewable Trunkline Transmission Projects - Draft Consultant Report. Publication # CEC-100-2006-003-D. (PDF File, 19 pgs, 252 kilobytes). Posted: January 11, 2007.
Commission-Adopted Forms and Instructions for Data Collection Under 2007 IEPR Proceeding.
Scenario Analysis of California's Electricity System
Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-SD. (PDF, 256 pgs, 1.4 megabytes). Posted: June 8, 2007
Appendices for Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-SD-AP. (PDF, 139 pgs, 3.1 megabytes). Posted: June 14, 2007
ADDENDUM 1 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD1. (PDF, 20 pgs, 604 kilobytes). Posted: July 5, 2007
ADDENDUM 2 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD2. (PDF, 34 pgs, 1.1 megabytes). Posted: August 4, 2007
APPENDICES to ADDENDUM 2, Draft Staff Report. Publication # CEC-200-2007-010-AD2-AP. (PDF, 258 pgs, 3.4 megabytes). Posted: August 6, 2007.
Draft Score Card, California vs. Rest of WECC. (Excel file, 2.7 megabytes). Posted: August 6, 2007.
Draft Score Card, Transmission Area All Cases. (Excel file, 2.2 megabytes). Posted: August 6, 2007.
ADDENDUM 3 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD3. (PDF, 132 pgs, 2.6 megabytes). Posted: September 7, 2007
Workshops & Meetings (Listed with newest date at top. Links to section below.)
2007 Meetings
- December 5, 2007,
November 21, 2007- Commission Hearing to consider adoption of 2007 Integrated Energy Policy Report. - November 7, 2007 - Commission Hearing on 2007 Strategic Transmission Investment Plan (FINAL Joint Committees Report, publication # CEC-700-2007-018-CTF) .
- October 15-16, 2007 - Committee Hearing on Committee Draft of the 2007 Integrated Energy Policy Report.
- October 1, 2007 - Committee Workshop on Geologic Carbon Sequestration Strategies.
- September 17, 2007 - AUGUST 27, WORKSHOP CANCELED (All Material to be covered on September 17, 2007)
Committee Workshop on Assembly Bill 2021 Implementation - Related to Targets for Statewide Energy Efficiency Savings. - September 13, 2007, pm - Joint Committee Workshop on the Progress of Publicly Owned Load-Serving Entities towards Resource Adequacy.
- September 13, 2007, am - Joint Committees Hearing and Availability of the Joint Committees Draft 2007 Strategic Transmission Investment Plan.
- August 27, 2007 - Rescheduled to September 13
Committee Workshop on the Progress of Publicly Owned Load-Serving Entities towards Resource Adequacy. - August 16, 2007 - Committee Workshop on California's Electricity and Gas System Analyses.
- August 9, 2007 - WORKSHOP POSTPONED (to be rescheduled)
Workshop on Assembly Bill 2021 Implementation - Related to Targets for Statewide Energy Efficiency Savings. - July 12, 2007 - Joint Committee Workshop on Transportation Energy Demand and Import Infrastructure Requirements.
- July 11, 2007 - Joint Committee Workshop on the Use of Portfolio Analysis in Electric Utility Resource Planning.
- July 10, 2007 - Committee Workshop on 2008-2018 Peak Demand and Energy Forecasts.
- July 9, 2007 - Second Committee Workshop on Scenario Analyses of California's Electricity System.
- July 2, 2007 p.m. - WORKSHOP POSTPONED (to be rescheduled)
(06-IEP-1J) Committee Workshop on Staff's Report on Resource Adequacy of Publicly Owned Load-Serving Entities. - July 2, 2007 a.m. - (06-IEP-1H) Committee Workshop on Staff's Preliminary Retail Electricity Price Forecast.
- June 29, 2007 - Siting Committee Workshop on Proposed Regulations Governing an Electric Transmission Corridor Designation Process.
- June 27, 2007 - Energy Commission Special Business Meeting, Possible Adoption of the State Plan for Alternative Fuels (AB 1007 Proceeding).
- June 26, 2007 - IEPR Committee Workshop on Land Use and Energy in California.
- June 25 & 28, 2007 - IEPR Committee Workshop on Nuclear Power Issues.
- June 19, 2007 - Joint Committee Workshop on Policies to Improve Residential Lighting Efficiency in California.
- June 18 & July 9, 2007 - Committee Workshops on Scenario Analyses of California's Electricity System.
- June 13, 2007 - Committee Workshop on Assembly Bill 2021 Implementation.
- June 12, 2007 - Committee Workshop on the Cost of Electricity Generation.
- June 7, 2007 - Committee Workshop on Staff's Preliminary Natural Gas Assessment Report.
- June 5, 2007 - Committee Workshop on Demand Response and the Energy Commission's Load Management Authority.
- June 4, 2007 - Staff Workshop on the Use of Portfolio Analysis in Electric Utility Resource Planning.
- May 31, 2007 - Joint ARB and CEC Workshop on the Alternative Transportation Fuels Plan. (AB 1007 Proceeding).
- May 29, 2007 - Committee Workshop to Address Clean Coal Technology and Carbon Dioxide Capture and Storage.
- May 24, 2007 - Committee Workshop on 2008 Peak Demand Forecast and Summer 2007 Supply and Demand Outlook.
- May 21, 2007 - IEPR Committee Workshop on "Feed-In" Tariffs.
- May 15, 2007 - Staff Workshop on Resource Adequacy Policies and Protocols for Publicly Owned Load-Serving Entities.
- May 14, 2007 - Joint Committee Workshop on In-state and Interstate Transmission and Potential In-State Corridors.
- May 10, 2007 - Joint Committee Workshop on to address California Distribution Infrastructure Challenges.
- May 8, 2007 - Staff Workshop on Transportation Energy Demand and Import Infrastructure Requirements.
- May 7, 2007 - Joint Committee Workshop on a Distributed Generation Roadmap.
- April 20, 2007 - Committee Workshop on Assembly Bill 2021 Implementation.
- April 19, 2007 - Joint Committee Workshop on California's Demand Response and Load Management.
- April 17, 2007 - Joint Committee Workshop on Removal of Transmission Barriers for Renewables and Examination of Transmission Corridor Initiatives.
- March 26, 2007 - Staff Workshop on the Inputs, Assumptions and Issues for the Natural Gas Assessment Report.
- March 13, 2007 - Committee Workshop on Incentives for Wind Repowering and Best Practices for Coordinating RPS with Carbon Market Design.
- March 5, 2007 - Joint Committee Workshop on Senate Bill 1059 Implementation.
- February 28, 2007 - Commission Business Meeting. Possible adoption of Forms and Instructions for Publicly-Owned Utilities Submitting Retail Electricity Price Data - Draft Commission Report
- February 14, 2007 - Commission Business Meeting. Possible adoption of Forms and Instructions for Submitting Retail Electricity Price Data - Draft Commission Report
- January 31, 2007 - Commission Business Meeting. Possible adoption of Forms and Instructions for Submitting Electric Transmission-Related Data
- January 29, 2007 - Committee Workshop on Integrated Scenario Analyses.
- January 16, 2007 - Staff Workshop on Retail Electricity Price Data Request.
- January 16, 2007 - Workshop on Electric Transmission Data Requests.
- January 3, 2007 - Commission Business Meeting. Possible adoption of Electricity Resource Plans Forms and Instructions.
December 5, 2007, November 21, 2007 - Note date change!
Commission Business Meeting
- Documents for Proposed Adoption
Executive Summary - reagarding AB 32 Greenhouse Gas Emmissions. (PDF, 17 pgs, 433 KB). Posted: December 5, 2007.
Final Errata (PDF, 8 pgs, 293 KB). Posted: December 5, 2007.
2007 Integrated Energy Policy Report,
Final Committee Report. Publication # CEC-100-2007-008-CTF.
(PDF, 301 pgs, 3.9 MB). Posted: November 7, 2007.
November 7, 2007
Commission Hearing on 2007 Strategic Transmission Investment Plan
- Hearing Notice
- Hearing Agenda
- Documents for the Hearing
Strategic Transmission Investment Plan, FINAL Joint Committees Report, publication # CEC-700-2007-018-CTF. (PDF, 184 pgs, 1.2 mb). Posted: October 24, 2007
October 15-16, 2007
Committee Hearings on Committee Draft of the 2007 Integrated Energy Policy Report
- Committee Hearing Notice
- Committee Hearing Agenda - (Revised: 10/11/2007)
- October 15, 2007 Committee Hearing Transcript
- October 16, 2007 Committee Hearing Transcript
- Documents for the Workshop
- Presentations
- Public Comments on Committee Report
2007 Integrated Energy Policy Report, Draft Committee Report. Publication # CEC-100-2007-008-CTD. (PDF, 292 pgs, 3.5 MB). Posted: October 2, 2007
Presentations, (Acrobat PDF files). Updated: October 16, 2007.
Public Comments on Committee Report, (Acrobat PDF files). Updated: October 19, 2007.
October 1, 2007
Committee Workshop on Geologic Carbon Sequestration Strategies
- Workshop Notice
- Workshop Agenda
- Workshop Transcript
- WebEx Recording of Workshop - (streaming video and audio)
Morning Session
Afternoon Session
Please note: No software is needed; The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Please contact WebEx technical support at 1-866 229-3239. - Documents for the Workshop
- Presentations
Geologic Carbon Sequestation Strategies for California: The Assembly Bill 1925 Report to the California Legislature, Draft Staff Report. Publication # CEC-500-2007-100-SD. (PDF, 161 pgs, 1.6 MB). Posted: September 21, 2007
Presentations, (Acrobat PDF files). Updated: October 1, 2007.
September 17, 2007
Committee Workshop on Assembly Bill 2021 Implementation
Related to Targets for Statewide Energy Efficiency Savings and Additional Energy Efficiency Cases for the Scenario Project.
- Workshop Notice
- Workshop Agenda
- Workshop Transcript
- Documents for the Workshop
- Presentations
- Comments
Statewide Energy Efficiency Potential Estimates And Targets For California Utilities, Draft Staff Report. Publication # CEC-200-2007-019-SD. (PDF, 84 pgs, 756 kb). Posted: September 7, 2007
Appendix A: Energy Efficiency and Demand Reduction Potential and Savings Targets, Draft Staff Report. Publication # pending. (Microsoft Word, 92 pgs, 1.1 MB). Posted: September 7, 2007
Appendix B: Supporting Figures and Tables, Draft Staff Report. Publication # pending. (PDF, 8 pgs, 92 kb). Posted: September 7, 2007
Appendix C: Aggregated Data for Investor-Owned Utilities, Publicly Owned Utilities, and Combined Utilities: Electric Energy Consumption, Electric Peak Demand, and Natural Gas Consumption, Draft Staff Report. Publication # pending. (PDF, 8 pgs, 404 kb). Posted: September 7, 2007
ADDENDUM 3 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD3. (PDF, 132 pgs, 2.6 megabytes). Posted: September 7, 2007
Draft Score Card, California vs. Rest-of-WECC, Energy Efficiency Cases, (MS Excel file, 2.1 megabytes). Posted: September 12, 2007
Draft Score Card, California vs. Rest-of-WECC, Carbon Adder Cases, (MS Excel file, 3.1 megabytes). Posted: September 12, 2007
Draft Score Card, Transmission Area, Carbon Adder Cases, (MS Excel file, 2.2 megabytes). Posted: September 12, 2007
Presentations, (Acrobat PDF files). Updated: September 14, 2007.
Comments, (Acrobat PDF files). Updated: September 11, 2007.
September 13, 2007, 2:00 pm
Joint Committee Workshop on the Progress of Publicly Owned Load-Serving Entities towards Resource Adequacy.
- Workshop Notice
- Workshop Agenda
- Workshop Transcript
- Documents for the Workshop
- Presentations
Progress Report on Resource Adequacy Among Publicly Owned Load-Serving Entities in California, Staff Report. Publication # CEC-200-2007-016. (PDF, 119 pgs, 965 kb). Posted: August 23, 2007
Presentations, (Acrobat PDF files). Updated: September 12, 2007.
September 13, 2007, 9:30 am
Joint Committees Hearing and Availability of the Joint Committees Draft 2007 Strategic Transmission Investment Plan.
- Hearing Notice
- Final Agenda
- Hearing Transcript
- Documents for the Workshop
- Presentations
- Comments
Strategic Transmission Investment Plan, FINAL Joint Committees Report. Publication # CEC-700-2007-018-CTF. (PDF, 184 pgs, 1.2 mb). Posted: October 24, 2007
Strategic Transmission Investment Plan, Draft Joint Committees Report. Publication # CEC-700-2007-018-CTD. (PDF, 170 pgs, 1.2 mb). Posted: August 31, 2007
Presentations, (Acrobat PDF files). Updated: September 12, 2007.
Comments, (Acrobat PDF files). Updated: September 28, 2007.
August 27, 2007 Rescheduled to September 13
Committee Workshop on the Progress of Publicly Owned Load-Serving Entities towards Resource Adequacy.
- Workshop Notice
- Documents for the Workshop
Progress Report on Resource Adequacy Among Publicly Owned Load-Serving Entities in California, Staff Report. Publication # CEC-200-2007-016. (PDF, 119 pgs, 965 kb). Posted: August 23, 2007
August 16, 2007
Committee Workshop on California's Electricity and Gas System Analyses. (06-IEP-1D , 06-IEP-1M)
- Workshop Notice
- Workshop Agenda
- Workshop Transcript
- Documents for the Workshop
- Presentations
Revised Natural Gas Market Assessment, In Support of the 2007 Integrated Energy Policy Report, Draft Staff Report. Publication # CEC-200-2007-009-REV. (PDF, 156 pgs, 1.3 mb). Posted: August 15, 2007
The Outlook For Global Trade In Liquefied Natural Gas Projections To The Year 2020, Consultant Report. Publication # CEC-200-2007-017. (PDF, 51 pgs, 755 kb). Posted: August 15, 2007
ADDENDUM 2 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD2. (PDF, 34 pgs, 1.1 megabytes). Posted: August 4, 2007
APPENDICES to ADDENDUM 2, Draft Staff Report. Publication # CEC-200-2007-010-AD2-AP. (PDF, 258 pgs, 3.4 megabytes). Posted: August 6, 2007.
Draft Score Card, California vs. Rest of WECC. (Excel file, 2.7 megabytes). Posted: August 6, 2007.
Draft Score Card, Transmission Area All Cases. (Excel file, 2.2 megabytes). Posted: August 6, 2007.
ADDENDUM 3 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD3. (PDF, 132 pgs, 2.6 megabytes). Posted: September 7, 2007
Presentations, (Acrobat PDF files). Updated: August 15, 2007.
WORKSHOP POSTPONED (to be rescheduled)
August 9, 2007
Workshop on Assembly Bill 2021 Implementation - Related to Targets for Statewide Energy Efficiency Savings.
July 12, 2007
Joint Committee Workshop on Transportation Energy Demand and Import Infrastructure Requirements.
- Workshop Notice - Posted: June 15, 2007.
- Workshop Transcript - Posted: August 23, 2007. (PDF File, 286 pgs, 1.49 mb)
- Information for Workshop
- Documents for the Workshop
- Presentations
- Comments
Agenda - (PDF File, 1 pgs, 20 kb).
WebEx Recording of Workshop - (streaming video and audio)
Morning Session
Afternoon Session
Please note: No software is needed; The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Please contact WebEx technical support at 1-866 229-3239.
Transportation Energy Forecasts for the 2007 Integrated Energy Policy Report, Draft Staff Report, publication # CEC-600-2007-009-SD. (Acrobat PDF file, 79 pgs, 888 kb). Posted: 7/6/07.
Presentations, (Acrobat PDF files). Updated: August 13, 2007.
Comments, (Acrobat PDF files). Updated: July 13, 2007.
July 11, 2007 (06-IEP-1M)
Joint Committee Workshop on the Use of Portfolio Analysis in Electric Utility Resource Planning.
- Workshop Notice - Posted: June 28, 2007.
- Workshop Transcript - Posted: August 10, 2007.
- Presentations
- Documents for the Workshop
- Comments
WebEx Instructions - (PDF File, 1 pgs, 16 kb).
Agenda - (PDF File, 1 pgs, 22.2 kb).
WebEx Recording of Workshop - (streaming video and audio)
WebEx Recording
Please note: No software is needed; The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Please contact WebEx technical support at 1=866 229-3239.
Presentations, (Acrobat PDF files). Updated: July 23, 2007.
Portfolio Analysis and Its Potential Application to Utility Long-Term Planning, Draft Staff Paper, publication # CEC-200-2007-012-SD. (Acrobat PDF file, 169 pgs, 1.5 MB). Posted: 7/3/07.
Final version of this document is available above
A Mean-Variance Portfolio Optimization of California's Generation Mix to 2020: Achieving California's 33 Percent Renewable Portfolio Standard Goal, FINAL CONSULTANT REPORT, publication # CEC-300-2007-009-F. (Acrobat PDF file, 99 pgs, 864). Posted: 1/22/08.
A Mean-Variance Portfolio Optimization of California's Generation Mix to 2020: Achieving California's 33 Percent Renewable Portfolio Standard Goal, DRAFT CONSULTANT REPORT, publication # CEC-300-2007-009-D. (Acrobat PDF file, 66 pgs, 1.5 MB). Posted: 7/6/07.
Comments, (Acrobat PDF files). Updated: July 19, 2007.
July 10, 2007 (06-IEP-1I)
Committee Workshop on 2008-2018 Peak Demand and Energy Forecasts.
- Workshop Notice - Posted: June 28, 2007.
- Workshop Transcript - Posted: August 6, 2007. (PDF File, 115 pgs, 575 kb)
- Documents for the Workshop
Workshop Agenda - (PDF File, 1 pgs, 94 kb).
California Energy Demand 2008 - 2018: Staff Revised Forecast, FINAL Staff Forecast, publication # CEC-200-2007-015-SF. (Acrobat PDF file, 221 pgs, 3.0 MB). Posted: 10/19/07.
California Energy Demand 2008 - 2018: Staff Draft Forecast, Draft Staff Forecast, publication # CEC-200-2007-015-SD. (Acrobat PDF file, 193 pgs, 1.1 MB). Posted: 7/7/07.
July 9, 2007 - See under June 18th below
Committee Workshops on Scenario Analyses of California's Electricity Systems
See documents, presentations, and comments under June 18th below
WORKSHOP CANCELLED
(to be rescheduled) July 2, 2007, p.m. (06-IEP-1J)
Committee Workshop on Staff's Report on Resource Adequacy of Publicly Owned Load-Serving Entities.
Workshop Notice - Posted: June 22, 2007.
July 2, 2007, a.m. (06-IEP-1H)
Committee Workshop on Staff's Preliminary Retail Electricity Price Forecast.
- Workshop Notice - Posted: May 24, 2007.
- Final Agenda and Discussion Questions - (PDF File, 2 pgs, 56 kb).
- Workshop Transcript - Posted: Jully 19, 2007. (PDF File, 130 pgs, 196 kb)
- Documents for the Workshop
STAFF FORECAST: Average Retail Electricity Prices 2005 to 2018, Draft Staff Report, publication # CEC-200-2007-013-SD.
(Acrobat PDF file, 67 pgs, 408 kb). Posted: 6/29/07.
June 29, 2007
Siting Committee Workshop on
Proposed Regulations Governing an Electric Transmission Corridor Designation Process.
- Workshop Notice - Posted: June 8, 2007.
- Reports
Draft Staff Regulations, Staff-Proposed Regulations for an Electric Transmission Corridor Designation Process Under SB1059
(Acrobat PDF file, 25 pgs, 140 kb). Posted: June 8, 2007.
June 27, 2007
Energy Commission Special Business Meeting, Possible Adoption of the State Plan for Alternative Fuels.
- Agenda and Documents for Business Meeting (AB 1007 Proceeding Page). Time Changed to 9 a.m.
June 26, 2007
IEPR Committee Workshop on Land Use and Energy in California
- Workshop Notice - Posted: June 13, 2007.
- Workshop Agenda - Updated: June 25, 2007. (PDF File, 2 pgs, 30.8 kb)
- Workshop Transcript - Posted: July 24, 2007. (PDF File, 309 pgs, 1.6 mb)
- Reports
- Presentations
- Workshop Notice - Posted: May 10, 2007. (PDF File, 10 pgs, 64 kb).
- Workshop Agenda - Posted: June 15, 2007.
- Workshop Transcript (June 25) - Posted: July 23, 2007.
- Workshop Transcript (June 28) - Posted: July 24, 2007. (PDF File, 360 pgs, 1.89 mb)
- Reports
- Public Comments on the MRW Report
- Presentations
- Panelist Submittals
- Panelist Bios
- Workshop Notice - Posted: May 24, 2007.
- Final Agenda - Posted: June 19, 2007. (PDF File, 1 pg, 84 kb)
- Workshop Transcript - Posted: July 17, 2007. (PDF File, 288 pgs, 1.12 mb)
- Presentations and Comments
- Workshop Notice - Posted: May 23, 2007.
- Agenda for July 9 - Posted: July 6, 2007.
- Workshop Questions for July 9 - Posted: June 29, 2007.
- Workshop Transcript for June 18 - Posted: July 9, 2007. (PDF File, 157 pg, 385 kb)
- Workshop Transcript for July 9 - Posted: August 7, 2007. (PDF File, 117 pg, 592 kb)
- Public Comments
- Reports
- June 18th Presentations and Agenda
- Public Comments
- Workshop Notice - Posted: May 29, 2007.
- Final Workshop Agenda - Updated: June 12, 2007.
- Workshop Transcript - Posted: July 2, 2007 (Acrobat PDF, 285 pgs, 436 kb).
- Workshop Questions - Updated: June 12, 2007.
- Presentations
- Workshop Notice - Posted: May 25, 2007.
- Workshop Agenda - Updated: June 6, 2007.
- Workshop Transcript - Online: July 9, 2007.
- WebEx Recording of Workshop - (streaming video and audio)
WebEx Recording
Please note: No software is needed; The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Please contact WebEx technical support at 1-866 229-3239. - Reports
- Presentations
- Public Comments
- Workshop Notice - Posted: May 23, 2007.
- Workshop Agenda - Updated: June 4, 2007.
- Workshop Transcript - Posted: June 20, 2007 (Acrobat PDF, 269 pgs, 387 mb).
- Reports
- Presentations
- Public Comments
- Workshop Notice - Posted: May 25, 2007.
- Workshop Agenda *Revised - Posted: June 5, 2007.
- Workshop Transcript - Posted: June 29, 2007 (Acrobat PDF, 187 pgs, 285 kb).
- Reports
- Presentations
- Public Comments
- Workshop Notice - Posted: May 23, 2007.
- Topics & Questions - Posted: June 1, 2007. (Acrobat PDF, 3 pages, 43.1 kb)
- Workshop Transcript - Posted: June 13, 2007 (Acrobat PDF, 228 pgs, 1.2 mb).
- Presentations
- Public Comments
- Workshop Notice - Posted: May 15, 2007.
- Workshop Agenda - Updated: May 24, 2007.
- Workshop Transcript - Posted: June 8, 2007 (Acrobat PDF, 242 pgs, 1.3 mb).
- Presentations
- Workshop Notice - Posted: May 14, 2007.
- Workshop Agenda - Posted: May 23 2007 (PDF File, 2 pgs, 12 kb).
- Workshop Transcript - Posted: June 5, 2007 (PDF File, 96 pgs, 142 kb).
- Reports
- Presentations
- Workshop Notice - Posted: May 2, 2007.
- Workshop Agenda - Posted: May 18, 2007. (PDF File, 2 pg, 34.1 kb)
- Transcript of Workshop (194 pgs, 608 kb)
- Presentations
- Public Comments
- Workshop Notice - Posted: May 4, 2007.
- Workshop Agenda - Posted: May 14, 2007. (PDF File, 2 pg, 82.5 kb)
- Workshop Transcript - Posted: May 29, 2007. (PDF File, 121 pg, 182 kb)
- Presentations
- Workshop Notice - Posted: May 2, 2007.
- Final Agenda - Posted: May 11, 2007. (PDF File, 11 pg, 48 kb)
- Workshop Transcript - Posted: May 18, 2007. (PDF File, 268 pg, 385 kb)
- Presentations
- Public Comments
- Workshop Notice - Posted: March 30, 2007.
- Workshop Agenda - Posted: May 8 2007. (PDF File, 2 pgs, 92 kb)
- Workshop Transcript - Posted: May 23, 2007. (PDF File, 295 pgs, 824 kb)
- Presentations
- Workshop Notice - Posted: April 16, 2007.
- Workshop Agenda - Posted: May 7, 2007. (PDF File, 1 pg, 75 kb)
- Workshop Transcript - Posted: May 22, 2007. (PDF File, 215 pg, 311 kb)
- Reports
- Presentations
- Workshop Notice - Posted: April 18, 2007.
- Workshop Agenda - Posted: May 8, 2007. (PDF File, 1 pg, 21 kb)
- Workshop Transcript - Posted: May 17, 2007. (PDF File, 165 pg, 250 kb)
- Reports
- Presentations
- Public Comments
- Workshop Notice - Posted: April 6, 2007.
- Attachment A - Questions for AB 2021 Implementation Workshop - Posted: April 12, 2007. (PDF File, 2 pgs, 52 kb)
- Final Agenda - Posted: April 19, 2007. (PDF File, 1 pgs, 15.3 kb)
- Workshop Transcript - Posted: May 2, 2007. (PDF File, 147 pgs, 475 kb)
- Presentations
- Workshop Notice - Posted: April 12, 2007.
- Workshop Preliminary Agenda - Posted: April 13, 2007. (PDF File, 1 pg, 58 kb)
- Workshop Transcript - Posted: May 2, 2007. (PDF File, 281 pgs, 800 kb)
- Reports
- Presentations
- Public Comments
- Workshop Notice - Posted: March 22, 2007.
- Workshop Agenda - Posted: April 16, 2007. (PDF File, 3 pgs, 30.4 kb)
- Workshop Transcript - Posted: May 4, 2007. (PDF File, 310 pgs, 441 kb)
- Presentations
- Public Comments
- Workshop Notice - Posted: March 15, 2007.
- Workshop Agenda - Posted: March 29, 2007. (PDF File, 1 pgs, 19 kb)
- Workshop Transcript - Posted: April 6, 2007. (PDF File, 161 pgs, 207 kb)
- Presentations
- Public Comments
- Notice - Posted: February 27, 2007.
- Agenda - (PDF File, 2 pgs, 32 kb). Posted: March 15, 2007.
- Transcript - (PDF File, 203 pgs, 272 kb). Posted: March 15, 2007.
- Presentations
- Public Comments
- Notice - Posted: February 14, 2007.
- Final Agenda - (PDF File, 1 pgs, 25 kb). Posted: March 2, 2007.
- Transcript of Workshop - (PDF File, 188 pgs, 588 kb). Posted: March 15, 2007.
- Presentations
- Public Comments
- Business Meeting Notice and Agenda - see Item # 9.
- Reports
- Business Meeting Notice and Agenda - see Item # 7. Posted: January 22, 2007.
- Reports
- Business Meeting Notice and Agenda - see Item # 3. Posted: January 22, 2007.
- Reports
- Workshop Notice - Posted: January 5, 2007.
- Agenda for the Workshop. Posted: January 25, 2007. (PDF file,1 pg, 21 kb).
- Transcript - Posted: February 21, 2007. (PDF file, 118 pg, 164 kb)
- Reports
- Workshop Notice - Posted: January 5, 2007.
- Reports
- Workshop Notice - Posted: January 5, 2007.
- Workshop Agenda - Posted: January 12, 2007.
- Transcript - Posted: February 21, 2007. (PDF file, 36 pg, 58.4 kb)
- Reports
- Presentations
- Reports
The Role of Land Use In Meeting California's Energy and Climate Change Goals - Draft Staff Paper. Publication # CEC-600-2007-008-SD. (PDF, 89 pgs, 670 kb). Posted: June 21, 2007.
Presentations, (Acrobat PDF files). Updated: June 29, 2007.
June 25 & 28, 2007
IEPR Committee Workshop on Nuclear Power Issues
Nuclear Power in California: Status Report 2007 - FINAL Consultant Report. Publication # CEC-100-2007-005-F. (PDF, 332 pgs, 4.4 megabytes). Posted: October 17, 2007
Nuclear Power in California: Status Report 2007 - Draft Consultant Report. Publication # CEC-100-2007-005-D. (PDF, 302 pgs, 3.2 megabytes). Posted: June 8, 2007
Comments, (Acrobat PDF files). Updated: July 23, 2007.
Presentations, (Acrobat PDF files). Updated: June 29, 2007.
Panelist Submittals, (Acrobat PDF files). Updated: July 6, 2007.
June 25 Panelist Bios, (Acrobat PDF files). Updated: August 8, 2007.
June 28 Panelist Bios, (Acrobat PDF files). Updated: August 8, 2007.
June 19, 2007
Joint Committee Workshop on Policies to Improve Residential Lighting Efficiency in California
Presentations
Updated: June 19, 2007.
Public Comments
Updated: June 19, 2007.
June 18, and July 9, 2007
Committee Workshops on Scenario Analyses of California's Electricity Systems
Comments, (Acrobat PDF files). Updated: July 9, 2007.
Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-SD. (PDF, 256 pgs, 1.4 megabytes). Posted: June 8, 2007
Appendices for Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-SD-AP. (PDF, 139 pgs, 3.1 megabytes). Posted: June 14, 2007
ADDENDUM 1 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD1. (PDF, 20 pgs, 604 kilobytes). Posted: July 5, 2007
ADDENDUM 2 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD2. (PDF, 34 pgs, 1.1 megabytes). Posted: August 4, 2007
APPENDICES to ADDENDUM 2, Draft Staff Report. Publication # CEC-200-2007-010-AD2-AP. (PDF, 258 pgs, 3.4 megabytes). Posted: August 6, 2007.
Draft Score Card, California vs. Rest of WECC. (Excel file, 2.7 megabytes). Posted: August 6, 2007.
Draft Score Card, Transmission Area All Cases. (Excel file, 2.2 megabytes). Posted: August 6, 2007.
ADDENDUM 3 to Scenario Analysis of California's Electricity System: Preliminary Results for the 2007 IEPR, Draft Staff Report. Publication # CEC-200-2007-010-AD3. (PDF, 132 pgs, 2.6 megabytes). Posted: September 7, 2007
Presentations
Updated: June 18, 2007.
Preliminary Agenda for June 18 - Posted: June 15, 2007.
Comments for June 18th Meeting, (Acrobat PDF files). Updated: June 21, 2007.
Comments for July 9th Meeting, (Acrobat PDF files). Updated: June 21, 2007.
June 13, 2007
Committee Workshop on Assembly Bill 2021 Implementation
Presentations, (PDF files). Updated: June 12, 2007.
June 12, 2007
Committee Workshop on the Cost of Electricity Generation
Comparative Costs of California Central Station Electricity Generation Technologies, Final Staff Report. Publication # CEC-200-2007-011-SF. (PDF, 200 pgs, 1.06 MB). Posted: December 6, 2007
Comparative Costs of California Central Station Electricity Generation Technologies - DRAFT STAFF REPORT. Publication # CEC-200-2007-011-SD. Posted: June 7, 2007. (Acrobat PDF, 69 pages, 540 kilobytes).
Presentation by Navigant Consulting on Levelized Cost of Generation Model - Renewable Energy, Clean Coal and Nuclear Inputs. Posted: June 19, 2007. (Acrobat PDF, 104 pages, 1.1 megabytes).
Other Presentations, (Acrobat PDF files). Posted: June 11, 2007.
Comments, (Acrobat PDF files). Posted: July 11, 2007.
June 7, 2007
Committee Workshop on Staff's Preliminary Natural Gas Assessment Report
Natural Gas Market Assessment - Preliminary Results - DRAFT STAFF REPORT. Publication # CEC-200-2007-009-SD. Posted: May 31, 2007. (Acrobat PDF, 103 pages, 3.1 megabytes).
Presentations, (Acrobat PDF files). Updated: June 8, 2007.
Comments, (Acrobat PDF files). Updated: June 21, 2007.
June 5, 2007
Committee Workshop on Demand Response and the Energy Commission's Load Management Authority
California's Next Generation of Load Management Standards, - FINAL CONSULTANT REPORT. Publication # CEC-200-2007-007-F. Posted: September 28, 2007. (Acrobat PDF, 54 pages, 552 kb).
California's Next Generation of Load Management Standards, - DRAFT CONSULTANT REPORT. Publication # CEC-200-2007-007-D. Posted: May 30, 2007. (Acrobat PDF, 50 pages, 288 kb).
Presentations, (Acrobat PDF files). Updated: June 5, 2007.
Comments, (Acrobat PDF files). Updated: June 20, 2007.
June 4, 2007
Staff Workshop on the Use of Portfolio Analysis in Electric Utility Resource Planning
Presentations, (Acrobat PDF files). Updated: June 4, 2007.
Public Comments, (Acrobat PDF files). Updated: July 3, 2007.
May 29, 2007
Committee Workshop to Address Clean Coal Technology and Carbon Dioxide Capture and Storage
Presentations, (Powerpoint PPS file, Acrobat PDF files). Posted: May 30, 2007.
May 24, 2007
Committee Workshop on 2008 Peak Demand Forecast and Summer 2007 Supply and Demand Outlook
Staff Forecast of 2008 Peak Demand, Final Staff Report. Publication # CEC-200-2007-006-SF. (Acrobat PDF, 36 pages, 318 kb). Draft posted: May 22, 2007; Final posted: June 18, 2007.
Summer 2007 Electricity Supply and Demand Outlook, Draft Staff Report. Publication # CEC-200-2007-005-SD. (Acrobat PDF, 30 pages, 197 kb). Posted: May 22, 2007.
Presentations, (Acrobat PDF files). Posted: May 24, 2007.
May 21, 2007
IEPR Committee Workshop on "Feed-In" Tariffs
Attachment A, Questions for Workshop. (PDF File, 2 pgs, 32 kb).
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: May 18, 2007.
Comments, (Acrobat PDF files). Posted: May 29, 2007.
May 15, 2007
Staff Workshop on Resource Adequacy Policies and Protocols for Publicly Owned Load-Serving Entities
Questions for Workshop. (PDF File,1 pgs 24 kb).
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: May 14, 2007.
May 14, 2007
Joint Committee Workshop on In-state and Interstate Transmission and Potential In-State Corridors
WebEx Recording of Workshop - (streaming video and audio)
Morning Session
Afternoon Session
Please note: No software is needed; The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Please contact WebEx technical support at 1-866 229-3239.
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Updated: May 15, 2007.
Public Comments, (PDF files). Updated: May 31, 2007.
May 10, 2007
Joint Committee Workshop on to address California Distribution Infrastructure Challenges
Presentations, (Acrobat PDF files). Updated: May 14, 2007.
May 8, 2007
Staff Workshop on Transportation Energy Demand and Import Infrastructure Requirements.
Overview of Proposed Transportation Energy Analysis for the 2007 Energy Report, Staff paper. Publication # CEC-600-2007-005. (Acrobat PDF, 33 pages, 632 kb). Posted: May 4, 2007
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: May 8, 2007.
May 7, 2007
Joint Committee Workshop On a Distributed Generation Roadmap
Distributed Generation and Cogeneration Policy Roadmap for California, Staff Report. Publication # CEC-500-2007-021. (Acrobat PDF, 43 pages, 528 kb). Posted: April 13, 2007
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: May 8, 2007.
Public Comments, (PDF files). Updated: May 11, 2007.
April 20, 2007
Committee Workshop on Assembly Bill 2021 Implementation.
April 19, 2007
Joint Committee Workshop on California's Demand Response and Load Management.
The State of Demand Response in California, FINAL Consultant Report. Publication # CEC-200-2007-003-F. (Acrobat PDF, 88 pages, 932 kb). Posted: October 10, 2007
The State of Demand Response in California, DRAFT Consultant Report. Publication # CEC-200-2007-003-D. (Acrobat PDF, 90 pages, 880 kb). Posted: April 13, 2007
Presentations, (Acrobat PDF files). Posted: April 24, 2007.
Public Comments, (Acrobat PDF files). Posted: June 6, 2007.
April 17, 2007
Joint Committee Workshop on Removal of Transmission Barriers for Renewables and Examination of Transmission Corridor Initiatives.
WebEx Recording of Workshop - (streaming video and audio)
Morning Session
Afternoon Session
Please note: No software is needed; The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Please contact WebEx technical support at 1-866 229-3239.
Presentations, (Acrobat PDF files). Updated: April 16, 2007.
Public Comments, (MS Powerpoint slideshow and Acrobat PDF files). Updated: May 1, 2007.
March 26, 2007
Staff Workshop on the Inputs, Assumptions and Issues for the Natural Gas Assessment Report.
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: March 29, 2007.
Public Comments, (MS Powerpoint slideshow and Acrobat PDF files). Updated: April 2, 2007.
March 13, 2007
Committee Workshop on Incentives for Wind Repowering and Best Practices for Coordinating RPS with Carbon Market Design.
Attachment A - Questions for March 13, 2007 Workshop.
Attachment B - Incentives to Repower Aging Wind Turbines in Europe.
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: March 15, 2007.
Public Comments, (MS Powerpoint slideshow and Acrobat PDF files). Posted: March 23, 2007.
March 5, 2007
Joint Committee Workshop on Senate Bill 1059 Implementation.
Presentations, (MS Powerpoint slideshow and Acrobat PDF files). Posted: March 7, 2007.
Public Comments, (MS Powerpoint slideshow and Acrobat PDF files). Posted: March 7, 2007.
February 28, 2007
Commission Business Meeting to Consider Adoption of Forms and Instructions for Publicly-Owned Utilities Submitting Retail Electricity Price Data - Draft Commission Report
Forms and Instructions for Publicly-Owned Utilities Submitting Retail Electricity Price Data - Commission Draft Report.
Publication # CEC-200-2007-002-CMD. (PDF File, 32 pgs, 156 kb). Posted: February 22, 2007.
Draft Forms for Publicly-Owned Utilities (IOUs).
(MS Excel File, 72 kb). Posted: February 22, 2007.
February 14, 2007
Commission Business Meeting to Consider Adoption of Forms and Instructions for Submitting Retail Electricity Price Data - Draft Commission Report
Forms and Instructions for Submitting Retail Electricity Price Data - Commission Draft Report.
Publication # CEC-200-2006-003-CMD. (PDF File, 16 pgs, 106 kb). Posted: February 9, 2007.
Draft Forms for Investor-Owned Utilities (IOUs).
(MS Excel File, 120 kb). Posted: February 9, 2007.
Draft Forms for Electricity Service Providers (ESPs).
(MS Excel File, 32 kb). Posted: February 9, 2007.
January 31, 2007
Commission Business Meeting to Consider Adoption of Forms and Instructions for Submitting Electric Transmission-Related Data
Forms and Instructions For Submitting Electric Transmission-Related Data - Staff FINAL Report.
Publication # CEC-700-2007-002-SF. (PDF File, 16 pgs, 106 kb). Posted: January 23, 2007. Errata (below) included in PDF file on 2/2/07.
ERRATA for Forms and Instructions For Submitting Electric Transmission-Related Data - Staff FINAL Report.
Publication # CEC-700-2007-002-SF-ERRATA. (PDF File, 3 pgs, 24 kb). Posted: February 2, 2007.
January 29, 2007
Committee Workshop on Integrated Scenario Analyses
Scenario-Based Assessment of Resource Plans Predicated on Large Penetration of Preferred Resources - Staff Draft Report.
Publication # CEC-100-2007-002-SD. (PDF File, 35 pgs, 323 kilobytes). Posted: January 19, 2007.
January 16, 2007
Staff Workshop on Retail Electricity Price Data Request
Forms and Instructions for Submitting Retail Electricity Price Data - Staff Draft Report. Publication # CEC-200-2006-003-SD. (PDF File, 32 pgs, 504 kilobytes). Posted: January 8, 2007.
Form Template for Investor Owned Utilities. (Microsoft Excel File, 104 kilobytes). Posted: January 8, 2007.
Form Template for Publicly Owned Utilities. (Microsoft Excel File, 76 kilobytes). Posted: January 8, 2007.
Form Template for Electricity Service Provider. (Microsoft Excel File, 54 kilobytes). Posted: January 8, 2007.
January 16, 2007
Workshop on Electric Transmission Data Requests
Forms and Instructions For Submitting Electric Transmission-Related Data - Staff Draft Report.
Publication # CEC-700-2007-002-SD. (PDF File, 12 pgs, 56 kb). Posted: January 10, 2007.
January 3, 2007
Commission Business Meeting. Possible
adoption of Electricity Resource Plans Forms and Instructions and
2006 IEPR Update.
2006 Integrated Energy Policy Report Update, Committee Final Report. Publication # CEC-100-2006-001-CTF. (PDF file, 122 pgs, 1.3 mb). Posted: December 13, 2006.
Proposed Errata 2006 Integrated Energy Policy Report Update. (PDF file, 2 pgs, 45 kb). Posted: January 3, 2007.
Forms And Instructions For Submitting Electricity Resource Plans, Commission Report. Prepared in Support of the 2007 Integrated Energy Policy Report. Publication # CEC-100-2006-002-CMF. (PDF file, 65 pgs, 250 kb). Posted: January 5, 2007.
Electricity Resource Planning Forms S-1, S-2, S-3 and S-5, MS Excel File. (MS Excel file, 287 kb). Posted: January 5, 2006.
The forms and instructions report, and resource planning forms were approved at the January 3, 2007 Commission business meeting.
