Documents Pages for 2008 IEPR Update Proceeding

Docket # 08-IEP-1

Most files are available as Adobe Acrobat Portable Document Format (PDF) files.
To download, navigate and print these files you will need Acrobat Reader 8.0+.
It is available from Adobe Systems website.

If the file is large, you may need to 'force download' the file to your hard drive by "right-clicking" the link (option click on Macintosh).




Reports


2008 IEPR Update Commission Report

2008 Integrated Energy Policy Report Update
Adopted November 20, 2008.
Publication # CEC-100-2008-008-CMF.
(PDF file, 146 pgs., 5.5 MB)

Cost-Benefit Analysis of the Self-Generation Incentive Program - FINAL Consultant Report
publication # CEC-300-2008-010-F, posted November 18, 2008. (PDF file, 115 pgs, 1.4 megabytes)

An Assessment of California's Nuclear Power Plants, Commission Report, adopted November 20, 2008.
Publication # CEC-100-2008-009-CMF. (PDF file, 52 pgs., 920 kb), posted: November 25, 2008

AB 1632 Assessment of California's Operating Nuclear Plants - FINAL Consultant Report
publication # CEC-100-2008-005-F.Posted 10/24/08. (Acrobat PDF file, 330 pages, 3.7)

Appendices of FINAL Consultant Report
publication # CEC-100-2008-005-F-AP. Posted 10/24/08. (Acrobat PDF file, 164 pages, 1.0 megabytes)




Workshops & Meetings (Listed with newest date at top. Links to section below.)

  • November 20, 2008 - Commission Business Meeting to Consider Adoption of 2008 IEPR Update
  • October 20, 2008 - Committee Workshop and Report Availability Assembly Bill 1632 Nuclear Power Plant Assessment
  • October 9, 2008 - Committee Hearing on Committee Draft 2008 Integrated Energy Policy Report Update
  • October 1, 2008 - Staff Workshop: Renewable Energy "Feed-In" Tariffs
  • September 25, 2008 - Joint Committee Workshop on the AB 1632 Nuclear Power Plant Assessment
  • September 3, 2008 - Staff Workshop: Review the Analysis of the Self Generation Incentive Program's Cost-Benefit Evaluation
  • August 21, 2008 - Joint Committee Workshop on Achieving Higher Levels of Renewables in California's Electricity System
  • August 18, 2008 - Committee Workshop on Procurement Issues
  • August 12, 2008 - Committee Workshop on Electricity and Natural Gas Forecasting Process
  • August 7, 2008 - WORKSHOP POSTPONED! - Committee Workshop on the AB 1632 Nuclear Power Plant Assessment
  • July 31, 2008 - Staff Workshop: Emerging Technologies for the Integration of Renewables
  • July 23, 2008 - Staff Workshop: Transmission Issues for 33 Percent Renewables by 2020
  • July 21, 2008 - Staff Workshop: Impacts of Higher Levels of Renewables on the Electricity System - Summary of Recent Studies
  • July 14, 2008 - Committee Workshop to conduct a panel discussion on using Procurement Review Groups
  • June 30, 2008 - Staff Workshop: Renewable Energy "Feed-In" Tariffs
  • June 3, 2008 - Committee Scoping Hearing to receive input from all interested parties on the scope of the 2009 IEPR
  • April 28, 2008 - Committee Scoping Hearing on the scope of the 2008 IEPR Update and the 2009 IEPR
  • March 11, 2008 0 Committee Workshop on Energy Efficiency and Demand Forecasting



November 20, 2008
Commission Business Meeting to Consider Adoption of Committee Final 2008 Integrated Energy Policy Report Update and AB 1632 Report




October 20, 2008
Committee Workshop and Report Availability Assembly Bill 1632 Nuclear Power Plant Assessment




October 9, 2008
Committee Hearing on Committee Draft 2008 Integrated Energy Policy Report Update




October 1, 2008
Staff Workshop: Renewable Energy "Feed-In" Tariffs




September 25, 2008
Joint Committee Workshop on the AB 1632 Nuclear Power Plant Assessment




September 3, 2008 - Staff Workshop: Review the Analysis of the Self Generation Incentive Program's Cost-Benefit Evaluation




August 21, 2008 - Joint Committee Workshop on Achieving Higher Levels of Renewables in California's Electricity System




August 18, 2008 - Committee Workshop on Procurement Issues




August 12, 2008 - Committee Workshop on Electricity and Natural Gas Forecasting Process




July 31, 2008 - Staff Workshop: Emerging Technologies for the Integration of Renewables




July 23, 2008 - Notice of Staff Workshop: Transmission Issues for 33 Percent Renewables by 2020




July 21, 2008 - Notice of Staff Workshop: Impacts of Higher Levels of Renewables on the Electricity System - Summary of Recent Studies



July 14, 2008 - Committee Workshop to conduct a panel discussion on using Procurement Review Groups



June 30, 2008 - Staff Workshop: Renewable Energy "Feed-In" Tariffs



June 3, 2008
Committee Scoping Hearing to receive input from all interested parties on the scope of the 2009 IEPR.



April 28, 2008 - Committee Scoping Hearing on the scope of the 2008 IEPR Update and the 2009 IEPR



March 11, 2008Committee Workshop on Energy Efficiency and Demand Forecasting