NEW on the Energy Commission's Website

Items placed on line in the past month (except for regularly scheduled updates).

Date
On Line
URL/Web Address Description
5/9/2008 www.energy.ca.gov/
sitingcases/beacon/
Beacon Solar Energy Project - Senator Notification
5/9/2008 www.energy.ca.gov/
sitingcases/beacon/
Beacon Solar Energy Project - Chairman Notification
5/9/2008 www.energy.ca.gov/
sitingcases/beacon/
Beacon Solar Energy Project - Assembly Member Notification
5/9/2008 www.energy.ca.gov/
sitingcases/beacon/
Beacon Solar Energy Project - Hearing Officer Assignment
5/9/2008 www.energy.ca.gov/
sitingcases/sentinel/
Sentinel Energy Project - Letter From Mark Turner RE: Revised Water Supply Plan
5/9/2008 www.energy.ca.gov/
sitingcases/ivanpah/
Ivanpah Solar Electric Generating System - Data Requests 117-151.
5/9/2008 www.energy.ca.gov/
2008_energypolicy/
documents/index.html
Comments for the April 28, 2008, Committee Scoping Hearing - scope of the 2008 IEPR Update and the 2009 IEPR
5/21/2008 www.energy.ca.gov/
business_meetings/index.html
Energy Commission Business Meeting - Agenda for the May 21, 2008 Business Meetings.
5/9/2008 www.energy.ca.gov/
sitingcases/chulavista/
Chula Vista Energy Upgrade Project - MMC Energy, Incs Preliminary Comments on the PSA.
5/9/2008 www.energy.ca.gov/
sitingcases/victorville2/
Victorville 2 Hybrid Power Project - Desert Tortoise Translocation Plan.
5/9/2008 www.energy.ca.gov/
sitingcases/avenal/
Avenal Energy Project Power Plant - Issues Identification Report.
5/8/2008 www.energy.ca.gov/
business_meetings/
Commission Business Meetings - Minutes of April 23 Commission Business Meeting.
5/8/2008 www.energy.ca.gov/
sitingcases/riverside_expansion/
documents/
Riverside Energy Resource Center Power Plant - Issues Identification Report.
5/8/2008 www.energy.ca.gov/
sitingcases/carrizo/
documents/
Carrizo Energy Solar Farm - Transcript of April 12, 2008 Information Workshop.
5/8/2008 www.energy.ca.gov/proceedings/
2008-HERS-1/documents/
index.html
Home Energy Rating System - Phase II Regulations Development, New Public Comments from the May 2, 2008, Workshop
5/7/2008 www.energy.ca.gov/
releases/index.html
2008 Media Advisory - Site visit and info hearing for proposed Riverside Energy Resource Center expansion scheduled for May 12th
5/7/2008 www.energy.ca.gov/
releases/index.html
2008 News Release Review Process Begins for Solar Thermal Project in Kern County
5/7/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#applicant
Beacon Solar Energy Project - Applicant's Response to April 22 Comments by Kern County Planning Department.
5/7/2008 www.energy.ca.gov/
releases/index.html
2008 Media Advisory - Staff Assessment workshop on Chula Vista Energy Upgrade Project Monday, May 12th
5/7/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html
Beacon Solar Energy Project - California Regional Water Quality Control Board Comments
5/7/2008 www.energy.ca.gov/transportation/
fuel_delivery_temperature_study/notices/
index.html
Fuels & Transportation - Fuel Delivery Temperature Study - Notice and Agenda of June 5, 2008 Staff Workshop on Assembly Bill 868 Fuel Delivery Temperature Study
5/7/2008 www.energy.ca.gov/sitingcases/
sentinel/documents/
index.html
Sentinel Energy Project - Letter From South Coast Air Quality Management District Regarding Preliminary Determination of Compliance
5/7/2008 www.energy.ca.gov/proceedings/
2008-HERS-1/documents/
index.html
Home Energy Rating System - Phase II Regulations Development, Public Comments from the May 2, 2008, Workshop
5/6/2008 www.energy.ca.gov/sitingcases/
starwood/compliance/
index.html
Amendment No. 1 for the Starwood Power-Midway Peaking Project Project compliance proceeding (socket # 06-AFC-10C)
5/6/2008 www.energy.ca.gov/sitingcases/
victorville2/notices/
2008-05-09_bio_mitigation_
workshop_2nd_continuation.html
Victorville 2 Hybrid Power Project - Notice of Second Continuation of the Biological Resources Mitigation Workshop #1 by Teleconference
5/6/2008 www.energy.ca.gov/sitingcases/
riverside_expansion/
documents/index.html
Riverside Energy Resource Center - Data Request Set #1 (1 To 71)
5/6/2008 www.energy.ca.gov/
corridor/documents/
Federal Energy Corridors - California Energy Commission Comments on Draft Programmatic Environmental Impact Statement, Designation of Energy Corridors on Federal Land in 11 Western States.
5/6/2008 www.energy.ca.gov/
releases/index.html
2008 News Releases - California Awarded $65 Million to Fight Global Warming, Carbon Sequestration and Storage to be Studied at Bakersfield Pilot Site.
5/6/2008 www.energy.ca.gov/sitingcases/
canyon/documents/
Canyon Power Plant Licensing Case - Data Requests 1- 55.
5/6/2008 www.energy.ca.gov/
releases/2008_releases/
2008-05-06_climate_change.html
News Releases - California Launches Newly-Designed Climate Change Web Portal.
5/6/2008 www.energy.ca.gov/contracts/index.html#nopa Fuels and Transportation Division - Marine and Off-Road Componants of the Transportation Fuel Sector
5/6/2008 www.energy.ca.gov/sitingcases/
carlsbad/documents/
index.html
Carlsbad Energy Center
California Energy Commission Staff's Data Request Set 2A
5/6/2008 www.energy.ca.gov/2008_energypolicy/
documents/index.html#042808
2008 Integrated Energy Policy - Transcript for April 28, 2008 IEPR Committee Scoping Hearing.
5/5/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#intervenor
Beacon Power Plant
Kern County Planning Department Preliminary Agency Comments
5/5/2008 www.energy.ca.gov/sitingcases/
cityofvernon/documents/
index.html
CIty of Vernon Combined Cycle
Staff's Status Report No. 6
5/5/2008 www.energy.ca.gov/proceedings/
2008-HERS-1/documents/
index.html
Home Energy Rating System - Phase II Regulations Development, Presentation from the May 2, 2008, Workshop
5/2/2008 www.energy.ca.gov/
appliances/2008rulemaking/
documents/index.html
Two reports for the may 15, 2008, 2008 Appliance Rulemaking (07-AAER-3) Efficiency Committee Workshop:
  • Preliminary Staff Report for the 2008 Appliance Efficiency Rulemaking - Phase 1, Parts A and B, (Docket 07-AAER-3) - Staff Final Report, publication # CEC-400-2008-015, posted May 2, 2008. (PDF file, 26 pages, 2.1 megabytes)

  • 2008 Appliance Efficiency Regulations Part B - Draft Amendments to the Appliance Efficiency Regulations, publication # CEC-400-2008-014-SD, posted May 2, 2008. (PDF file, 236 pages, 2.0 megabytes)
5/2/2008 www.energy.ca.gov/sitingcases/
eastshore/documents/
index.html
Eastshore Energy Power Plant
Commissioner Byrons Response to Tierra Energy Regarding the Energy Commission Delay in Issuing the Presiding Members Proposed Decision
5/2/2008 www.energy.ca.gov/sitingcases/
humboldt/notices/
index.html
Humboldt Bay Repowering Project
Notice of Prehearing Conference and Evidentiary Hearing
5/02/2008 www.energy.ca.gov/sitingcases/
victorville2/notices/
index.html
Victorville 2 Hybrid Power Project
Notice of Continuation of Biological Resources Mitigation Workshop
5/2/2008 www.energy.ca.gov/sitingcases/
sentinel/documents/
index.html
CPV Sentinel Energy Project
Commission response to Application for Confidentiality of Cultural / Archaeological Records.
5/1/2008 www.energy.ca.gov/sitingcases/
avenal/notices/
index.html
Avenal Energy Project
Notice of Public Informational Hearing and Site Visit
5/1/2008 www.energy.ca.gov/
contracts/#nopa
Geothermal Program Solicitation
Notice of Proposed Awards, Geothermal Resources Development Account (GRDA)

4/30/2008 www.energy.ca.gov/sitingcases/
beacon/documents/index.html#intervenor
Beacon Solar Energy Project
The Following items have been placed online:

  • Communication for Lyndon Quon Regarding Biological Surveys.
  • Application for State incidental Take Permit.
4/30/2008 www.energy.ca.gov/
appliances/2008rulemaking/
notices/index.html
2008 Appliance Rulemaking (07-AAER-3) -
Notice of Efficiency Committee Workshop
4/30/2008 www.energy.ca.gov/
sitingcases/canyon/
documents/index.html
Canyon Power Plant
  • Commission's Documents - Committee Scheduling Order
  • Applicant's Documents - Anaheim Presentation at the First Public Hearing.
4/30/2008 www.energy.ca.gov/
load_management/documents/
index.html
Load Management Standards Proceeding - Presentations from the April 29, 2008 - Efficiency Committee Load Management Standards Smart Grid Workshop
4/30/2008 www.energy.ca.gov/sitingcases/
sentinel/documents/
index.html#intervenor
CPV Sentinel Energy Project
Riverside County Planning Department Agency Contact List
4/30/2008 www.energy.ca.gov/sitingcases/
beacon/index.html
Beacon Solar Energy Project
The Following items have been placed online:

  • Notice of Receipt of Application for Certification Supplement (Volume 3 - Data Adequacy Supplement)
  • Request for Agency Participation in the Review of the Beacon Solar Energy Project
  • Letter to Librarian Requesting Document Handling Proceedures
4/30/2008 www.energy.ca.gov/
contracts/pier.html
Grant Solicitation - Research Projects on Climate Change of Relevance to California
Questions and Answers from April 11 Workshop.
4/30/2008 www.energy.ca.gov/sitingcases/
eastshore/documents/
index.html#applicant
Eastshore Energy Center
Applicant's Letter Regarding the Energy Commission Delay in Issuing the Presiding Members Proposed Decision
4/30/2008 www.energy.ca.gov/sitingcases/
chulavista/notices/
2008-05-12_notice.html
Chula Vista Energy Upgrade Project - Notice of May 12 workshop on the Preliminary Staff Assessment.
4/30/2008 www.energy.ca.gov/
transportation/
fuel_delivery_temperature_study/
documents/
Fuel Delivery Temperature Study - WebEx Recording of April 23 Meeting.
4/29/2008 www.energy.ca.gov/
releases/2008_releases/
2008-04-29_chula_vista.html
Energy Commission News Releases - Initial assessment of Chula Vista power plant expansion project released.
4/29/2008 www.energy.ca.gov/
careers/jobs.html
Energy Commission Careers - New Job Opportunities: Energy Analyst, Office Manager I.
4/29/2008 www.energy.ca.gov/pier/
notices/index.html
PIER - Notice of Staff Workshop on the California Energy Commission's Public Interest Energy Research (PIER) Natural Gas Vehicle Research Roadmap
4/28/2008 www.energy.ca.gov/
business_meetings/
Commission Business Meetings
Transcript of April 23 business meeting.
4/28/2008 www.energy.ca.gov/ghg_emissions/
meetings/index.html
Greenhouse Gas Emissions - Extension of Joint California Energy Commission and the California Public Utilities Commission workshop on Greenhouse Gas Allocation Issues for the Electricity Sector, and to Review Economic Modeling Results.
4/28/2008 www.energy.ca.gov/
business_meetings/2008_agendas/
agenda_2008-05-07_addendum.html
May 7, 2008 Business Meeting
Additional Item to be heard.
4/28/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#intervenor
Beacon Solar Energy Project
Letter from the Department of Toxic Substances Control Regarding the Beacon project
4/28/2008 www.energy.ca.gov/
sitingcases/carlsbad/
documents/index.html#intervenor
Carlsbad Energy Center
City of Carlsbad Project Status Report 1.
4/28/2008 www.energy.ca.gov/sitingcases/
roseville/compliance/
index.html
Roseville Energy Park
Order Approving Amendments of Air Quality Conditions
4/28/2008 www.energy.ca.gov/proceedings/
2008-ALT-1/notices/
index.html
Alternative and Renewable Fuel and Vehicle Technology Program (08-ALT-1) - Notice of First Advisory Committee Meeting for the Alternative and Renewable Fuel and Vehicle Technology Program
4/28/2008 www.energy.ca.gov/
sitingcases/orangegrove/
documents/index.html#others
Orange Grove Power Plant Project
SDG&E Letter of Support for Orange Grove Project.
4/28/2008 www.energy.ca.gov/sitingcases/
cityofvernon/documents/
index.html#applicant
CIty of Vernon Combined Cycle
NRDC Data Response Set 1A
4/28/2008 www.energy.ca.gov/sitingcases/
vernon/compliance/
index.html
Malburg Generating Station
Notice of Receipt of Petition for Change of Ownership and Operational Control
4/28/2008 www.energy.ca.gov/proceedings/
2008-HERS-1/documents/
index.html
Home Energy Rating System - Agenda for the May 2, 2008, Workshop
4/28/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html
Beacon Solar Energy Project
Data Adequacy Recommendation
4/28/2008 www.energy.ca.gov/careers/jobs.html Job Opportunities at the Energy Commission - Staff Information Systems Analyst (Specialist), Information Technology Services Branch, final filing date: May 16, 2008.
4/28/2008 www.energy.ca.gov/
load_management/documents/
index.html
Load Management Standards Proceeding - Load Management Standards Efficiency Committee Scoping Order
4/25/2008 www.energy.ca.gov/sitingcases/
orangegrove/documents/
index.html#applicant
Orange Grove Power Plant Project
Orange Grove Energy, L.P.'s Letter of Withdrawl from its Small Power Plant Exemption
4/25/2008 www.energy.ca.gov/sitingcases/
vernon/compliance/
index.html
Malburg Generating Station
Petition for Change of Ownership and Operational Control
4/25/2008 www.energy.ca.gov/proceedings/
2008-HERS-1/documents/
index.html
Documents and draft regulations for the Home Energy Rating System Program workshop on May 2, 2008.
4/25/2008 www.energy.ca.gov/ sitingcases/
colusa/documents/
index.html#commission
Colusa Power Plant Project - Final Commission Decision.
4/25/2008 www.energy.ca.gov/
business_meetings/2008_agendas/
agenda_2008-05-07.html
Business Meetings - Agenda for May 7, 2008.
4/25/2008 www.energy.ca.gov/
releases/2008_releases/
2008-04-25_victorville_workshop_ma.html
Media Advisory - April 28 - 29 Workshop to discuss licensing conditions related to the proposed 563-MW Victorville 2 Hybrid Power Project.
4/25/2008 www.energy.ca.gov/sitingcases/
canyon/notices/
index.html
Canyon Power Plant - Committee Scheduling Order
4/25/2008 www.energy.ca.gov/2008_energypolicy/
documents/index.html#042808
2008 Integrated Energy Policy - Agenda for the April 28, 2008 Committee Scoping Hearing - Scope of the 2008 IEPR Update and the 2009 IEPR
4/25/2008 www.energy.ca.gov/title24/
2008standards/rulemaking/
notices/index.html
2008 Building Energy Efficiency Standards -- Notice of Determination of Compliance with Section 21108 or 21152 of the Public Resources Code.
4/24/2008 www.energy.ca.gov/business_meetings/ Commission Business Meetings - Transcript of April 16, 2008 business meeting.
4/24/2008 www.energy.ca.gov/sitingcases/
eastshore/documents/
index.html#applicant
Eastshore Energy Power Plant Project - Applicant's Availability for Eastshore Hearings.
4/24/2008 www.energy.ca.gov/sitingcases/
orangegrove/documents/
Orange Grove Power Plant Project - Staff's Brief in Response to the Committee's Tentative Decision to Deny the Small Power Plant Exemption.
4/24/2008 www.energy.ca.gov/sitingcases/
ivanpah/notices/
index.html
Ivanpah Solar Electric Generating System - Order Extending Deadline for Data Requests
4/24/2008 www.energy.ca.gov/sitingcases/
riverside_expansion/notices/
index.html
Riverside Energy Resource Center Units 3 & 4
Notice of Public Informational Hearing and Site Visit
4/23/2008 www.energy.ca.gov/sitingcases/
humboldt/documents/
index.html
Humboldt Repowering Project
New Applicant and Intervenor/others Documents Online
4/23/2008 www.energy.ca.gov/
business_meetings/index.html
Energy Commission Business Meeting - Minutes from the April 16, 2008 Business Meetings.
4/23/2008 www.energy.ca.gov/
releases/2008_releases/
2008-04-23_2008_standards.html
News Releases - Energy Commission Approves New Energy Efficient Measures for California Homes and Businesses.
4/23/2008 www.energy.ca.gov/
sitingcases/eastshore/
documents/index.html
Eastshore Energy Power Plant
  • City of Hayward Dates of Availability.
  • Alameda County Dates of Availability.
4/23/2008 www.energy.ca.gov/
business_meetings/index.html
Energy Commission Business Meeting - Minutes from the April 16, 2008 Business Meetings.
4/23/2008 www.energy.ca.gov/
load_management/notices/
index.html
Load Management Standards Proceeding - Agenda for the April 29, 2008, Efficiency Committee Workshop
4/23/2008 www.energy.ca.gov/
careers/jobs.html
Energy Commission Careers
New Job Opportunity: Office Technician.
4/23/2008 www.energy.ca.gov/
releases/index.html
2008 News Release Energy Commission gives green light for the construction of power plant in Colusa County
4/23/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
Beacon Solar Energy Project
1. Report of Conversation with USFWS, regarding linear facilities; 2. Preliminary Agency Comments, Review of Beacon Solar Energy Application for Certification.
4/23/2008 www.energy.ca.gov/sitingcases/
eastshore/documents/
index.html#other
Eastshore Energy Power Plant
Group Intervernor's Unavailbility Schedule
4/22/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#intervenor
Beacon Solar Project. - Kern Kern County Air Pollution Control District Application Receipt Notice.
4/22/2008 www.energy.ca.gov/sitingcases/
highgrove/documents/
index.html
AES Highgrove Power Plant
Commission Status Report No. 6
4/22/2008 www.energy.ca.gov/
releases/2008_releases/
2008-04-22_orange_grove.html
Media Advisory - April 24 Hearing for the Orange Grove Power Project.
4/22/2008 www.energy.ca.gov/ sitingcases/
beacon/documents/
index.html#applicant
Beacon Solar Energy Project - Applicant's data Adequacy Supplement Volume 3.
4/22/2008 www.energy.ca.gov/ sitingcases/
/smud/compliance/
SMUD Cosumnes Power Plant - Staff analysis of petition to amend cooling tower description, operating parameters, and associated air quality conditions.
4/21/2008 www.energy.ca.gov/sitingcases/
canyon/documents/
index.html
Canyon Power Plant
Transcript of the April 16, 2008, Informational Hearing & Site Visit
4/21/2008 www.energy.ca.gov/sitingcases/
colusa/documents/
index.html
Colusa Generation Station
Transcript of the April 16, 2008, Informational Hearing & Site Visit
4/21/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#intervenor
Beacon Solar Project. Caltrans Request for Agency Participation.
4/21/2008 www.energy.ca.gov/contracts/index.html Research, Development and Demonstration Projects for Waste Heat Recovery from Industrial Processes in California - Request For Proposals 500-07-502
4/21/2008 www.energy.ca.gov/sitingcases/
canyon/documents/
index.html
Canyon Power Plant
Public Advisors Status Report
4/21/2008 www.energy.ca.gov/title24/
2008standards/rulemaking/
documents/index.html
2008 Building Energy Efficiency Standards -- A New Public Comments Added to the April 23, 2008 Hearing.
4/21/2008 www.energy.ca.gov/sitingcases/
eastshore/documents/
index.html
Eastshore Energy Power Plant
Commission Staff & Intervenor's Schedules of Availabilty
4/21/2008 www.energy.ca.gov/contracts/index.html#nopa Notice of Proposed Awards - PIER - Renewable Energy & Energy System Integration - Wind-Storage Solicitation: "Wind-Storage-Enhanced Transmission Research & Development
4/21/2008 www.energy.ca.gov/
sitingcases/carrizo/
documents/index.html
Carrizo Energy Solar Farm Licensing Case
  • Staff's Status Report #1.
  • Applicant's Response to Comments from 3-12-08 Data Response Workshop .
4/21/2008 www.energy.ca.gov/
appliances/2008rulemaking/
documents/index.html
2008 Appliance Rulemaking (07-AAER-3) -
Comments By Association of Home Appliance Manufacturers & Consumer Electronics Association Regarding battery Charger Test Procedure.
4/21/2008 www.energy.ca.gov/sitingcases/
canyon/documents/
index.html
Canyon Power Plant
Two Documents added to the Documents Section:

  • Commission:
    Presentaiton from the April 15, 2008, Informational Hearing & Site Visit
  • Intervenor:
    Comments from Orange County Sanitation District
4/21/2008 www.energy.ca.gov/sitingcases/
avenal/documents/
index.html
Avenal Energy Project
Two Documents added to the Documents Section:

  • Commission:
    Order 08-416-2 Commission Appointment of Committee
  • Intervenor:
    California Unions for Reiable Energy's Petition to Intervene
4/18/2008 www.energy.ca.gov/sitingcases/
colusa/documents/
index.html
Colusa Generating Station
Errata to the Presiding Members Proposed Decision
4/18/2008 www.energy.ca.gov/proceedings/
2008-HERS-1/documents/
index.html
Home Energy Rating System Program - Notice of Staff Workshop on Phase II Regulations Development.
4/18/2008 www.energy.ca.gov/
load_management/notices/
index.html
Load Management Standards Proceeding - Notice of Efficiency Committee Workshop
4/18/2008 www.energy.ca.gov/sitingcases/
victorville2/notices/
index.html
Victorville 2 Hybrid Power Project
Notice of Biological Resources Mitigation Workshop
4/17/2008 www.energy.ca.gov/pier/
newest/index.html
Publication # CEC-500-2008-026-CMF titled: JPublic Interest Energy Research (PIER) Program 2007 Annual Report - Final Commission Report is now on line. The report was adopted at the April 16, 2008, Energy Commission Business Meeting.
4/17/2008 www.energy.ca.gov/ghg_emissions/
meetings/index.html
Publication # CEC-100-2008-003 titled: Joint California Public Utilities Commission and California Energy Commission Staff Paper on Options for Allocation of GHG Allowances in the Electricity Sector for the the April 21 & 22 joint meeting of the Energy Commission and CPUC in San Francisco
4/17/2008 www.energy.ca.gov/contracts/
electricity.html
Electricity Supply and Analysis - RFP 400-07-405 Pre-Bid Conference Documents
4/16/2008 www.energy.ca.gov/
business_meetings/index.html
Energy Commission Business Meeting - Minutes from the April 2, 2008 Business Meetings.
4/16/2008 www.energy.ca.gov/releases/
2008_releases/2008-04-16_sentinel_ma.html
Media Advisory - April 17 workshop for the CPV Sentinel Energy Project.
4/16/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
Beacon Solar Energy Project - Report of Conversation with USFWS.
4/16/2008 www.energy.ca.gov/2008_energypolicy/
documents/index.html#031108
2008 Integrated Energy Policy - Comment on Joint Committees Hearing and Comments of the Committee Workshop on Energy Efficiency and Demand Forecasting
4/15/2008 www.energy.ca.gov/sitingcases/
chulavista/documents/
index.html#others
Chula Vista Energy Upgrade Project
Letter from the City of Chula Vista Regarding the California Energy Commission's Specific Questions
4/16/2008 www.energy.ca.gov/
releases/
index.html
2008 News Release

  • Review starts for Kings County Power Plant.
  • Energy Commission to review Riverside's application for power plant exemption.
4/16/2008 www.energy.ca.gov/
appliances/2008rulemaking/
documents/index.html
2008 Appliance Rulemaking (07-AAER-3) -
Pacific Gas & Electric's Comments in Response to American Lighting Association Portable Lighting Fixtures
4/16/2008 www.energy.ca.gov/reti/
ssc/index.html
Renewable Energy Transmission Initiative Two presentation added for the April 16, 2008 Stakeholder Steering Committee Meeting: Black & Veatch, Pacific Gas & Electric
4/16/2008 www.energy.ca.gov/title24/
2008standards/rulemaking/
documents/index.html
2008 Building Energy Efficiency Standards -- A New Public Comments Added to the April 23, 2008 Hearing.
4/16/2008 www.energy.ca.gov/sitingcases/
orangegrove/documents/
index.html#intervenorl
Orange Grove Power Plant Project
  • Staff's Brief in Response to the Committee's Additional Questions Regarding the Transition from a Small Power Plant Exemption into an Application for Certification,
  • Orange Grove Energy, L.P.'s Response to the Committee's April 4, 2008 Request for Response,
  • Anthony J. Arand Rebuttal Brief in Response to April 4, 2008 Email.
4/15/2008 www.energy.ca.gov/sitingcases/
eastshore/notices/
index.html
Notice of change in schedule for PMPD for the Eastshore Energy Power Plant
4/15/2008 www.energy.ca.gov/reti/
working-groups/phase1A/
comments/
Renewable Energy Transmission Initiative
New Comment on the RETI Phase 1A Draft Report
4/15/2008 www.energy.ca.gov/reti/
ssc/index.html
Renewable Energy Transmission Initiative TANC Transmission Program Presentation
4/15/2008 www.energy.ca.gov/sitingcases/
chulavista/documents/
index.html
Chula Vista Energy Upgrade Project
Staff's Status Report #2 & 3
4/14/2008 www.energy.ca.gov/2008_energypolicy/
notices/index.html
2008 Integrated Energy Policy - Notice of Committee Scoping Hearing
4/14/2008 www.energy.ca.gov/title24/
2008standards/rulemaking/
documents/index.html
Title 24 - Public Comments on Commission Hearing to Consider Adoption of 15-Day Language for the 2008 Building Energy Efficiency Standards
4/14/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#others
Beacon Solar Energy Project - Air Resources Board Comments on the Beacon Solar Energy Project.
4/14/2008 www.energy.ca.gov/sitingcases/
sentinel/documents/
index.html
CPV Sentinal Energy Project
    Applicant's Documents:

  • Applicant's Response to Data Requests #66 - 97.
  • Intervenor, Other Agencies, and Others' Documents:

  • Letter from Jim Battin of the California Legilature in Support of the Power Plant.
4/14/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#applicant
Beacon Solar Energy Project - Application for Incidental Take, Section 2081.
4/14/2008 www.energy.ca.gov/sitingcases/
canyon/documents/index.html
Canyon Power Plant - Issues Identification Report
4/14/2008 www.energy.ca.gov/sitingcases/
carlsbad/documents/
index.html
Carlsbad Energy Center
Staff's Status Report #1
4/14/2008 www.energy.ca.gov/sitingcases/
chulavista/documents/
index.html#applicant
Chula Vista Energy Upgrade Project
MMC Energy, Inc's Status Report Number 3.
4/14/2008 www.energy.ca.gov/sitingcases/
orangegrove/documents/
Orange Grove Power Plant Project
  • E-mail from Hearing Advisor Regarding Parties' Briefs. (Commission Documents)
  • Orange Grove Energy, L.P.'s Stipulation to an Extended Review Schedule. (Applicant Documents).
  • Orange Grove Energy, L.P.'s Response to the Committee's Request for Briefs. (Applicant Documents).
  • Envirepel Response to the Notice of the Committee Order and Tentative Decision for the Orange Grove Energy Project. (Intervenor's Documents).
4/14/2008 www.energy.ca.gov/sitingcases/
communitypower/documents/
index.html
Kings River Community Power Project
Staff's Status Report #2
4/14/2008 www.energy.ca.gov/
business_meetings/index.html
Energy Commission Business Meeting - Agenda for the April 23, 2008 Business Meetings.
4/11/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html
Beacon Solar Energy project
Data Adequacy Recommendation
4/11/2008 www.energy.ca.gov/
releases/index.html
2008 News Releases
  • Public conference on Presiding member's proposed decision on Colusa power plant set for April 14th
  • Site visit and info hearing for proposed Anaheim peaker plant scheduled for April 15th
4/11/2008 www.energy.ca.gov/
ghg_emissions/meetings/index.html
April 21 & 22, 2008 - Joint Energy Commission and Public Utilities Commission Workshop on Greenhouse Gas Allocation Issues in the Electricity Sector and Review of Economic Modeling Results
4/11/2008 www.energy.ca.gov/
contracts/index.html#nopa
Notice Of Proposed Award - RFP# 600-07-602, Household and Commercial Survey for the Transportation Fuel Demand Forecast.
4/11/2008 www.energy.ca.gov/sitingcases/
sentinel/documents/
index.html#applicant
CPV Sentinel Energy Project
Letter regarding the Modeling of the Mission Creek Sub Basin
4/11/2008 www.energy.ca.gov/ sitingcases/
pittsburg/compliance/
Los Medanos Energy Center (formerly Pittsburg District Energy Facility) - Notice Of Receipt of Petition to Amend the Energy Commission Decision.
4/11/2008 www.energy.ca.gov/
contracts/index.html
Energy Innovations Small Grant Program - Solicitation #08-01
4/11/2008 www.energy.ca.gov/sitingcases/
losesteros/compliance/
Los Esteros Critical Energy Facility Project (01-AFC-12C)
Notice Of Receipt - Petition To Amend The Energy Commission Decision.
4/11/2008 www.energy.ca.gov/
careers/jobs.html
Energy Commission Careers
New Job Opportunity Bulletin: Associate Management Auditor.
4/10/2008 www.energy.ca.gov/
releases/2008_releases/
2008-04-10_carrizo_workshop.html
Carrizo Solar Farm Project
Public information workshop scheduled for Saturday, April 12th.
4/10/2008 www.energy.ca.gov/sitingcases/
communitypower/documents/
index.html#intervenor
Kings River Community Power Project
Development of Fine Particulate Emission Factors and Speciation Profiles for Oil and Gas Fired Combustion Systems
4/10/2008 www.energy.ca.gov/sitingcases/
avenal/documents/
index.html
Avenal Energy Power Project
Revised Data Adequacy Recommendation
4/9/2008 www.energy.ca.gov/sitingcases/
victorville2/documents/
index.html
Victorville 2 hybrid Power Project
April 3, 2008, Evidentiary Hearing Transcript
4/9/2008 www.energy.ca.gov/careers/jobs.html Energy Commission Careers - Job opportunity - Legal Secretary.
4/9/2008 www.energy.ca.gov/siting_pre-1999_compliance/
index.html
High Desert Power Project (97-AFC-1C) - California Energy Commission Staff Analysis Petition of Proposed Modification of Air Quality Conditions Relating to Source Test Intervals and Other Administrative Changes
4/8/2008 www.energy.ca.gov/
proceedings/2008-ALT-1/
documents/index.html
Implementation of AB 118 - Transcript of Joint Workshop
4/8/2008 www.energy.ca.gov/title24/
2008standards/rulemaking/
documents/2008-04-23_hearing/
comments/
Title 24 - Public Comments on Commission Hearing to Consider Adoption of 15-Day Language for the 2008 Building Energy Efficiency Standards
4/8/2008 www.energy.ca.gov/reti/
working-groups/phase1A/
comments/
Renewable Energy Transmission Initiative
New Comments on the RETI Phase 1A Draft Report
4/8/2008 www.energy.ca.gov/
appliances/2008rulemaking/
documents/index.html
2008 Appliance Rulemaking (07-AAER-3) -
American Lighting Association Portable Lamp Proposal
4/8/2008 www.energy.ca.gov/sitingcases/
avenal/documents/
index.html#intervenor
Avenal Energy Project
Department of Conservation Response Letter to Energy Commission Staff's Request for Agency Participation
4/7/2008 www.energy.ca.gov/business_meetings/ Commission Business Meetings - Transcript of April 4 Business Meeting.
4/7/2008 www.energy.ca.gov/title24/
swh_calculator/index.html
Title 24 - Solar Water Heating Calculation for built up system.
Update for the California F-Chart
4/7/2008 www.energy.ca.gov/sitingcases/
beacon/documents/
index.html#intervenor
Beacon Solar Energy Project
Two Comments:

  • Letter from Bob Russell supporting the project.
  • A comment from the County of Kern Roads Department
4/7/2008 www.energy.ca.gov/
appliances/2008rulemaking/
documents/index.html
2008 Appliance Rulemaking (07-AAER-3) -
Pacific Gas & Electric Proposal Information Template:
General Purpose Lighting
4/7/2008 www.energy.ca.gov/reti/
working-groups/phase1A/
comments/
Renewable Energy Transmission Initiative
Comments on the RETI Phase 1A Draft Report
4/4/2008 www.energy.ca.gov/sitingcases/
victorville2/documents/
index.html
Victorville 2 Hybrid Power Project
April 1, 2008, Victorville 2 Hybrid Power Project - Prehearing Conference Transcript
4/4/2008 www.energy.ca.gov/sitingcases/
carrizo/documents/
index.html
Carrizo Energy Solar Farm
California Energy Commission Letter to Ausra Reguarding Needed Biological Surveys
4/4/2008 www.energy.ca.gov/reti/
working-groups/phase1A/
comments/
Renewable Energy Transmission Initiative
Comments on the RETI Phase 1A Draft Report
4/4/2008 www.energy.ca.gov/siting_pre-1999_compliance/
index.html
Los Medanos Energy Center (98-AFC-1C) - Petition for Admendment, Los Medano to Dow Pittsburg Transmission Line
4/4/2008 www.energy.ca.gov/
business_meetings/index.html
Energy Commission Business Meeting - Agenda for the April 16, 2008 Business Meetings.
4/4/2008 www.energy.ca.gov/
appliances/2008rulemaking/
documents/index.html
2008 Appliance Rulemaking (07-AAER-3) -
Pacific Gas & Electric CASE Studies

  • High-Intensity Discharge lighting Fixtures CASE Study
  • Television CASE Study
4/3/2008 www.energy.ca.gov/reti/
proceedings/2008-ALT-1/
documents/index.html
Alternative and Renewable Fuel and Vehicle Technology Program
WebEx Recording of April 2, 2008 Workshop.
4/3/2008 www.energy.ca.gov/reti/
working-groups/phase1A/
comments/
Renewable Energy Transmission Initiative
Comments on the RETI Phase 1A Draft Report
4/3/2008 www.energy.ca.gov/sitingcases/
sentinel/documents/
index.html
CPV Sentinel Energy Project
Intervernors' & Others':

  • Letter from Senator Battin Expressing Support for the Power Project
Commission:

  • Letter from Bill Pfanner to Mission Springs Water District
4/3/2008 www.energy.ca.gov/sitingcases/
victorville2/documents/
Victorville 2 Hybrid Power Project
Additional Testimony of Energy Commission Staff.
4/3/2008 www.energy.ca.gov/title24/
2005standards/
ordinances_exceeding_2005_building_standards.html
Title 24 - 2005 Building Energy Efficiency Standards Santa Rosa Local Ordinances Exceeding the 2005 Building Energy Efficiency Standards