CALIFORNIA ENERGY COMMISSION - ENERGY FACILITY STATUS Projects Since 1997, Updated: 5/7/2008 |
| |
COLOR KEY: |
| |
Operational / On Line |
| |
Approved |
| |
In Review |
| |
On-line date is expected to be delayed beyond the date shown.
|
| |
Expected and disclosed |
| |
Planned but undisclosed |
| |
On hold or suspended. According to developers, the new on-line date will be determined when the markets are favorable and financing is available. |
| |
Project approved but cancelled by applicant or approved and license expired before construction began; or proceeding terminated by Commission. |
|
| |
Projects On Line Arranged by Date On Line |
Docket Number |
Status |
Capacity (MW) |
Construction Completed (percent) |
Location |
Date Approved |
Construction Start Date |
Original On-Line Date |
Actual On-Line Date* |
| 1a |
Sunrise - Texaco & Edison Mission E. |
98-AFC-4 |
Operational |
320 |
100 |
Kern Co. |
12/6/00 |
12/7/00 |
7/01 |
6/27/01 |
| 2 |
Sutter - Calpine |
97-AFC-2 |
Operational |
540 |
100 |
Sutter Co. |
4/14/99 |
7/1/99 |
7/01 |
7/2/01 |
| 3 |
Los Medanos (Pittsburg) - Calpine |
98-AFC-1 |
Operational |
555 |
100 |
Contra Costa |
8/17/99 |
9/17/99 |
7/01 |
7/9/01 |
| 4 |
Wildflower Larkspur - Intergen |
01-EP-1 |
Operational |
90 |
100 |
San Diego Co. |
4/4/01 |
4/5/01 |
7/01 |
7/16/01 |
| 5 |
Wildflower Indigo 1,2&3 - Intergen |
01-EP-2 |
Operational |
135 |
100 |
Riverside Co. |
4/4/01 |
4/5/01 |
7/01-9/01 |
7/26-9/10/01 |
| 6 |
Drews - Alliance |
01-EP-5 |
Operational |
40 |
100 |
San Bernardino |
4/25/01 |
4/26/01 |
9/01 |
8/15/01 |
| 7 |
Hanford - GWF |
01-EP-7 |
Operational |
95 |
100 |
Kings Co. |
5/10/01 |
5/11/01 |
9/01 |
9/1/01 |
| 8 |
Century - Alliance |
01-EP-4 |
Operational |
40 |
100 |
San Bernardino |
4/25/01 |
4/26/01 |
9/01 |
9/15/01 |
| 9 |
Escondido - Calpeak |
01-EP-10 |
Operational |
49.5 |
100 |
San Diego Co. |
6/6/01 |
6/7/01 |
9/01 |
9/30/01 |
| 10 |
Border - Calpeak |
01-EP-14 |
Operational |
49.5 |
100 |
San Diego Co. |
7/11/01 |
7/12/01 |
9/01 |
10/26/01 |
| |
Subtotal On Line 2001 |
1,914 |
|
|
|
|
|
|
| 11 |
Gilroy I, Units 1,2&3 - Calpine |
01-EP-8 |
Operational |
135 |
100 |
Santa Clara Co. |
5/21/01 |
5/22/01 |
9/01 |
Units 1&2: 1/29/02 Unit 3: 2/20/02 |
| 12 |
King City - Calpine |
01-EP-6 |
Operational |
50 |
100 |
Monterey Co. |
5/2/01 |
5/3/01 |
9/01 |
1/14/02 |
| 13 |
Delta - Calpine |
98-AFC-3 |
Operational |
887 |
100 |
Contra Costa |
2/9/00 |
4/1/00 |
7/02 |
5/10/02 |
| 14 |
Henrietta Peaker - GWF |
01-AFC-18 |
Operational |
96 |
100 |
Kings Co. |
3/7/02 |
3/8/02 |
6/02 |
7/1/02 |
| 15 |
Moss Landing Unit 1 & 2 - Duke |
99-AFC-4 |
Operational |
1,060 |
100 |
Monterey Co. |
10/25/00 |
11/28/00 |
6/02 |
7/11/02 |
| 16 |
Huntington Beach Unit 3 & 4 - AES |
00-AFC-13 |
Operational |
450 |
100 |
Orange Co. |
5/10/01 |
5/31/01 |
11/01 |
Unit 3: 7/31/02 Unit 4: 8/7/03 |
| 17a |
Valero Cogen. Unit 1 |
01-AFC-5 |
Operational |
51 |
100 |
Solano Co. |
10/31/01 |
11/5/01 |
6/02 |
10/18/02 |
| |
Subtotal On Line 2002 |
2,729 |
|
|
|
|
|
|
| 18 |
La Paloma - PG&E Natl. Units 1, 2, 3 & 4 |
98-AFC-2 |
Operational |
1,124 |
100 |
Kern Co. |
10/6/99 |
1/1/00 |
3/02 |
Units 1&2: 1/10/03 Units 3&4: 3/7/03 |
| 19 |
Los Esteros 1 - Calpine Units 1, 2, 3 & 4 |
01-AFC-12 |
Operational |
180 |
100 |
Santa Clara Co. |
7/2/02 Recertified 3/16/05 Under docket 03-AFC-2 |
7/8/02 |
5/03 |
3/7/03 |
| 20 |
High Desert - Constellation |
97-AFC-1 |
Operational |
830 |
100 |
San Bernardino |
5/3/00 |
5/1/01 |
7/03 |
4/22/03 |
| 21 |
Tracy Peaker - GWF |
01-AFC-16 |
Operational |
169 |
100 |
San Joaquin Co. |
7/17/02 |
7/22/02 |
4/03 |
6/1/03 |
| 1b |
Sunrise Comb. Cycle - Texaco & Mission (amendment to application: 98-AFC-4) |
98-AFC-4C |
Operational |
265 |
100 |
Kern Co. |
11/19/01 |
12/21/01 |
6/03 |
6/1/03 |
| 22 |
Woodland II Combined Cycle - Modesto Irrigation District |
01-SPPE-1 |
Operational |
80 |
100 |
Stanislaus Co |
9/19/01 |
2/21/02 |
5/03 |
6/6/03 |
| 23 |
Blythe I - Blythe Energy, LLC |
99-AFC-8 |
Operational |
520 |
100 |
Riverside Co. |
3/21/01 |
4/27/01 |
4/03 |
7/15/03 |
| 24 |
Elk Hills - Sempra & Oxy |
99-AFC-1 |
Operational |
500 |
100 |
Kern Co. |
12/6/00 |
6/8/01 |
12/02 |
7/24/03 |
| |
Subtotal On Line 2003 |
3,668 |
|
|
|
|
|
|
| |
Subtotal On Line 2004 |
0 |
|
|
|
|
|
|
| 25 |
Von Raesfeld Power Plant Project (Formerly Pico Power) Combined Cycle - Silicon Valley Power |
02-AFC-3 |
Operational |
147 |
100 |
Santa Clara Co. |
9/9/03 |
9/10/03 |
12/04 |
3/24/2005 |
| 26 |
Pastoria Phase 1, Unit 1, 2 & 3 - Calpine |
99-AFC-7 |
Operational |
750 |
99 |
Kern Co. |
12/20/00 |
10/3/01 |
1/03 |
Unit 1: 5/4/05 Units 2&3: 7/5/05 |
| 27 |
Metcalf - Calpine |
99-AFC-3 |
Operational |
600 |
100 |
Santa Clara Co. |
9/24/01 |
1/15/02 |
7/03 |
5/27/05 |
| 28 |
Kings River Conservation Dist. Peaker |
03-SPPE-2 |
Operational |
97 |
100 |
Fresno Co. |
5/19/04 |
11/04 |
5/05 |
9/19/05 |
| 29 |
Magnolia - SoCal Power Authority |
01-AFC-6 |
Operational |
328 |
100 |
Los Angeles Co. |
3/5/03 |
7/21/03 |
5/05 |
9/22/05 |
| 30 |
Malburg - City of Vernon Combined Cycle |
01-AFC-25 |
Operational |
134 |
100 |
Los Angeles Co. |
5/20/03 |
9/11/03 |
11/05 |
10/17/05 |
| 31a |
Mountainview Units 3 & 4 - SCE |
00-AFC-2 |
Operational |
1,056 |
100 |
San Bernardino |
3/21/01 |
9/1/01, resumed 3/15/04 |
6/03 |
Unit 3: 12/9/05 Unit 4: 1/19/06 |
| |
Subtotal On Line 2005 |
3,110 |
|
|
|
|
|
|
| 32 |
SMUD Cosumnes Combined Cycle Phase 1 - SMUD |
01-AFC-19 |
Operational |
500 |
100 |
Sacramento Co. |
9/9/03 |
9/17/03 |
6/05 |
2/24/06 |
| 33 |
Walnut Energy Center - Turlock Irrigation District |
02-AFC-4 |
Operational |
250 |
100 |
Stanislaus Co |
2/18/04 |
3/15/04 |
4/06 |
2/28/06 |
| 34 |
Palomar Escondido - Sempra |
01-AFC-24 |
Operational |
546 |
100 |
San Diego Co. |
8/6/03 |
6/1/04 |
3/06 |
4/1/06 |
| 35 |
Riverside Energy Resource Center Units 1 & 2 - City of Riverside |
04-SPPE-1 |
Operational |
96 |
100 |
Riverside Co. |
12/15/04 |
2/23/05 |
6/05 |
Unit 1: 6/1/06 Unit 2: 7/26/2006 |
| 36 |
Ripon Simple Cycle - MID |
03-SPPE-1 |
Operational |
95 |
100 |
San Joaquin Co. |
2/4/04 |
10/4/04, Restart 4/1/05 |
4/05 |
6/21/06 |
| |
Subtotal On Line 2006 |
1,487 |
|
|
|
|
|
|
| 37 |
Bottle Rock Geothermal - U.S. Renewables Group |
79-AFC-4C Amendment |
Operational |
17 |
98 |
Lake Co. |
12/13/06 |
12/19/06 |
6/07 |
10/1/07 |
| 38 |
Roseville Combined Cycle - Roseville |
03-AFC-1 |
Operational |
160 |
100 |
Placer Co. |
4/13/05 |
8/18/05 |
12/07 |
11/5/07 |
| |
Subtotal On Line 2007 |
177 |
|
|
|
|
|
|
| |
ON-LINE TOTAL |
13,087 |
|
|
|
|
|
|
|
| |
Approved / Under Construction (Arranged By On-Line Date) |
Docket Number |
Status |
Capacity (MW) |
Construction Completed (percent) |
Location |
Date Approved |
Construction Start Date |
Original On-Line Date |
Current On-Line Date* |
| 1 |
Niland Peaker - Imperial Irrigation District |
06-SPPE-1 |
Under Construction |
93 |
70 |
Imperial Co. |
10/11/06 |
6/25/07 |
5/08 |
6/08 |
| 2 |
Inland Empire Comb Cycle -GE &Calpine {5} |
01-AFC-17 |
Under Construction |
800 |
82 |
Riverside Co. |
12/17/03 |
8/29/05 |
12/05 |
8/08 |
| 3 |
Otay Mesa - Calpine |
99-AFC-5 |
Under Construction |
590 |
30 |
San Diego Co. |
4/18/01 |
Began 9/10/01 Restart 6/21/04 Resumed 5/1/07 |
7/03 |
5/09 |
| 4 |
Gateway - PG&E (formerly Contra Costa - Mirant) |
00-AFC-1 |
Under Construction |
530 |
44 |
Contra Costa |
5/30/01 |
8/30/01 Resumed 2/2007 |
8/03 |
6/09 |
| 5 |
EIF Panoche - Energy Investors Fund |
06-AFC-5 |
Under Construction |
400 |
0 |
Fresno Co. |
12/19/07 |
2/15/08 |
11/09 |
11/09 |
| 6 |
Colusa Generation Station - E&L Westcoast |
06-AFC-9 |
Preconstruction |
660 |
Green Field |
Colusa Co. |
4/23/08 |
-- |
-- |
-- |
| |
Approved and Under Construction Subtotal |
3,073 |
|
|
|
|
|
|
| |
Approved / Not Under Construction (Arranged By On-Line Date) |
Docket Number |
Status |
Capacity (MW) |
Construction Completed (percent) |
Location |
Date Approved |
Construction Start Date |
Original On-Line Date |
Current On-Line Date* |
1 |
Russell City - Calpine & GE |
01-AFC-7 |
Construction On Hold |
600 |
0 |
Alameda Co. |
9/11/02 |
? |
12/04 |
? |
|
Russell City Amendment - Calpine & GE |
01-AFC-7C |
Amendment to relocate site |
See 01-AFC-7 |
0 |
Alameda Co. |
10/3/07 |
-- |
-- |
-- |
| 2 |
Starwood Midway Firebaugh/Panoche - Starwood Power-Midway LLC |
06-AFC-10 |
Construction On Hold |
120 |
0 |
Fresno Co. |
1/16/08 |
? |
6/09 |
On Hold |
| 3 |
El Centro Unit 3 Repower - Imperial Irrigation District{7} Expansion project |
06-SPPE-2 |
Preconstruction On Hold |
85 |
0 |
Imperial Co. |
1/3/07 |
? |
5/09 |
On Hold |
| 4 |
Walnut Creek Energy Park - Edison Mission Energy |
05-AFC-2 |
Preconstruction On Hold |
500 |
0 |
Los Angeles Co. |
2/27/08 |
? |
? |
On Hold |
| 5 |
El Segundo Repower - Dynegy/NRG {2} |
00-AFC-14 |
On Hold |
630 |
0 |
Los Angeles Co. |
2/2/05 |
Construction pending dry cooling amendment |
? |
On Hold |
| 6 |
East Altamont - Calpine |
01-AFC-4 |
On Hold |
1,100 |
0 |
Alameda Co. |
8/20/03 |
On Hold |
7/05 |
On Hold |
| 7 |
Salton Sea Geothermal {4} |
02-AFC-2 |
On Hold |
215 |
0 |
Imperial Co. |
12/17/03 |
? |
1/06 |
On Hold |
| 8 |
San Joaquin Valley Energy Center - Calpine |
01-AFC-22 |
On Hold |
1,087 |
0 |
Fresno Co. |
1/14/04 |
On Hold |
1/06 |
On Hold |
| 9 |
Morro Bay - L.S. Power {1} |
00-AFC-12 |
On Hold |
1,200 |
0 |
San Luis Obispo |
8/2/04 |
On Hold |
On Hold |
On Hold |
| 10 |
Tesla Combined Cycle - FPL |
01-AFC-21 |
On Hold |
1,120 |
0 |
Alameda Co. |
6/16/04 |
On Hold |
On Hold |
On Hold |
| 11 |
Blythe II Combined Cycle - Blythe Energy, LLC |
02-AFC-1 |
On Hold |
520 |
0 |
Riverside Co. |
12/14/05 |
tba |
|
On Hold |
| 12 |
Los Esteros 2 Combined Cycle - Calpine |
03-AFC-2 |
Preconstruction On Hold |
140 |
0 |
Santa Clara Co. |
10/11/06 |
? |
|
On Hold |
| 13 |
SF Reliability Project - City of SF |
04-AFC-1 |
On Hold |
145 |
0 |
San Francisco |
10/3/06 |
9/08 |
12/08 |
On Hold 4/10 |
| 14 |
Blythe I Transmission Line - Blythe Energy, LLC |
99-AFC-8C |
Preconstruction On Hold |
230 kV Transmission Line |
0 |
Riverside Co. |
10/11/06 |
? |
|
On Hold |
| 15 |
Pastoria Phase 2 Expansion Project - simple cycle addition - Calpine |
05-AFC-1 |
Preconstruction On Hold |
160 |
0 |
Kern Co. |
11/8/06 |
? |
|
On Hold |
| |
Subtotal Approved and "Available" for Construction |
7,622 |
|
|
|
|
|
|
| A |
Three Mountain - Covanta |
99-AFC-2 |
Approval Expired 5/16/06 |
500 |
0 |
Shasta Co. |
5/16/01 |
n/a |
12/03 |
Approval Expired 5/16/06 |
| B |
Western Midway-Sunset - Mission |
99-AFC-9 |
Approval Expired |
500 |
0 |
Kern Co. |
3/21/01 |
n/a |
7/03 |
Approval Expired 3/21/06 |
| C |
United Golden Gate Phase 1 - El Paso |
00-AFC-5 |
Approval Expired |
51 |
0 |
San Mateo Co. |
3/7/01 |
n/a |
7/01 |
Approval Expired |
| D |
Pegasus Energy - Delta Power |
01-EP-9 |
Cancelled |
181 |
0 |
San Bernardino |
6/6/01 |
Cancelled |
Cancelled |
Cancelled |
| E |
Chula Vista 2 - Ramco |
01-EP-3 |
Cancelled |
62 |
0 |
San Diego Co. |
6/13/01 |
Cancelled |
Cancelled |
Cancelled |
| F |
Hanford Energy Park - GWF {3} |
00-SPPE-1 |
Cancelled |
99 |
0 |
Kings Co. |
4/11/01 |
Cancelled |
Cancelled |
Cancelled |
| G |
Valero Cogen. Unit 2 (see Unit 1 - # 17a in "On Line" section) |
01-AFC-5 |
Not built and License Expired |
51 |
37 |
Solano Co. |
10/31/01 |
11/5/01 |
12/02 |
Not built and License Expired |
| |
Subtotal Approved but Will Not Be Built |
1,444 |
|
|
|
|
|
|
| |
Subtotal Approved AND Not Under Construction |
9,066 |
|
|
|
|
|
|
| |
APPROVED TOTAL |
25,226 |
|
|
|
|
|
|
|
| |
Projects in Review (Arranged By Estimated Decision Date) |
Docket Number |
Process |
Capacity (MW) |
Project Type |
Location |
Date Filed |
Estimated Decision Date |
|
Estimated On-line Date** |
| 1 |
El Segundo Power Redevelopment Projects (Dry Cooling Amendment) - NRG |
00-AFC-14C |
Amendment |
[560] MW included under 200-AFC-14 approved 2/2/05 |
Brown Field |
Los Angeles Co. |
6/22/07 |
6/08 |
|
6/10 |
| 2 |
City of Victorville Hybrid (513 MW gas, 50 MW solar) |
07-AFC-1 |
12-mo. AFC |
563 |
Green Field |
San Bernardino Co. |
2/28/07 |
6/08 |
|
8/10 |
|
Orange Grove Energy - J Power USA |
07-SPPE-2 |
SPPE |
[100] |
Green Field |
San Diego Co. |
7/19/07 |
Project Denied 5/7/08 |
|
|
| 3 |
Eastshore - Tierra Energy |
06-AFC-6 |
12-mo. AFC |
116 |
Brown Field |
Alameda Co. |
9/22/06 |
7/08 |
|
7/09 |
| 4 |
San Gabriel Generating Station - Reliant |
07-AFC-2 |
12-mo. AFC |
656 |
Brown Field |
San Bernardino Co. |
4/13/07 |
7/08 |
|
7/10 |
| 5 |
Sun Valley Energy Project (simple cycle/peaker) - Edison Mission Energy |
05-AFC-3 |
12-mo. AFC |
500 |
Green Field |
Riverside Co. |
12/1/05 |
8/08 |
|
Unknown |
| 6 |
Highgrove Grand Terrace Peaker - AES |
06-AFC-2 |
6/12-mo. AFC |
300 |
Expansion |
San Bernardino |
5/25/06 |
8/08 |
|
Unknown |
| 7 |
Humboldt Bay Repowering Project - PG&E |
06-AFC-7 |
12-month AFC |
163 |
Repower |
Humboldt Co. |
9/29/06 |
9/08 |
|
8/09 |
| 8 |
Southeast Region Energy Project - City of Vernon |
06-AFC-4 |
12-mo. AFC |
943 |
Brown Field |
Los Angeles Co. |
6/30/06 |
9/08 |
|
Unknown |
| 9 |
Sentinel Peaker - Competitive Power Ventures (CPV) |
07-AFC-3 |
12-mo. AFC |
850 |
Green Field |
Riverside Co. |
6/26/07 |
11/08 |
|
5/10 |
| 10 |
MMC Chula Vista Expansion - MMC Energy Inc. |
07-AFC-4 |
12-mo. AFC |
100 |
Brown Field |
San Diego Co. |
8/10/07 |
11/08 |
|
12/09 |
| 11 |
Carlsbad - NRG |
07-AFC-6 |
12-mo. AFC |
558 |
Brown Field |
San Diego Co. |
9/14/07 |
11/08 |
|
7/10 |
| 12 |
Community Power Plant - Kings River Conservation District |
07-AFC-7 |
12-mo. AFC |
565 |
Green Field |
Fresno Co. |
9/27/07 |
12/08 |
|
6/11 |
| 13 |
Riverside Energy Resource Center Expansion, Units 3&4 - City of Riverside |
2008-SPPE-1 |
SPPE |
96 |
Expansion |
Riverside Co. |
3/19/08 |
12/08 |
|
12/09 |
| 14 |
Ivanpah Solar Tower, Solar Partners/Brightsource |
07-AFC-5 |
12-mo. AFC |
400 |
Green Field |
San Bernardino Co. |
8/31/07 |
12/08 |
|
12/10 to 12/12 phased on line |
| 15 |
Carrizo Energy Solar Farm - Carrizo Energy, LLC |
07-AFC-8 |
12-mo. AFC |
177 |
Green Field |
San Luis Obispo Co. |
10/25/07 |
1/09 |
|
5/10 to 3/12 phased on line |
| 16 |
Canyon Power Plant - Southern California Power Authority |
07-AFC-9 |
12-mo. AFC |
200 |
Green Field |
Orange Co. |
12/28/07 |
2/09 |
|
6/10 |
| 17 |
Avenal Energy - Avenal Power Center LLC |
08-AFC-1 |
12-mo AFC |
600 |
Green Field |
Kings Co. |
2/21/08 |
4/09 |
|
Unknown |
| 18 |
Beacon Solar Energy Project - Beacon Solar LLC |
2008-AFC2 |
12-Mon. AFC |
250 |
unknown |
Kern County |
3/14/08 |
5/09 |
|
10/11 |
| a |
Chevron Richmond Power Plant Replacement Project - Chevron |
07-SPPE-1 |
SPPE |
63 |
Brown Field |
Contra Costa Co. |
6/22/07 |
Suspended |
|
Suspended |
| b |
Larkspur Energy Facility Amendment - Larkspur 3 LLC |
01-EP-1C |
Amendment |
[47] |
Expansion |
San Diego Co. |
4/9/07 |
Suspended |
|
Suspended |
| |
UNDER REVIEW TOTAL |
7,077 |
|
|
|
|
|
|
|
| |
Projects Announced (Arranged By Estimated Filing Date) |
|
Process |
Capacity (MW) |
Project Type |
Location |
Estimated Filing Date |
|
|
|
| 1 |
Hybrid Gas-Solar - City of Palmdale (500 MW gas, 50 MW solar) |
|
12-mo. AFC |
570 |
Green Field |
San Bernardino Co. |
6/08 |
|
|
|
| 2 |
Stirling Solar Thermal Two |
|
12-mo. AFC |
900 |
Green Field |
Imperial Co. |
6/08 |
|
|
|
| 3 |
Stirling Solar Thermal One |
|
12-mo. AFC |
850 |
Green Field |
San Bernardino Co. |
7/08 |
|
|
|
| 4 |
Clean Hydrogen Power Project - BP/ARCO & Edison Mission Energy |
|
12-month AFC |
500 |
Brown Field |
Los Angles Co. |
Unknown |
|
|
|
| |
ANNOUNCED TOTAL |
2,820 |
|
|
|
|
|
|
|
|
Projects Planned (Arranged by Estimated Filing Date) |
|
Process |
Capacity (MW) |
Project Type |
Location |
Estimated Filing Date |
|
|
|
| Peaker Addition 2 | | 12-mo AFC | 100 | | Unknown | Unknown | | | |
| Peaker Addition 3 | | 12-mo AFC | 100 | | Unknown | Unknown | | | |
| Peaker Expansion 2 | | Amendment | 49 | | Unknown | Unknown | | | |
| Peaker Expansion 3 | | Amendment | 49 | | Unknown | Unknown | | | |
| Peaker Expansion 4 | | 12-mo AFC | 120 | | Unknown | Unknown | | | |
| Solar Thermal 3 | | 12-mo AFC | 160 | | Unknown | Unknown | | | |
| Solar Thermal 4 | | 12-mo AFC | 230 | | Unknown | Unknown | | | |
| Solar Thermal 5 | | 12-mo AFC | 230 | | Unknown | Unknown | | | |
| Solar Thermal 6 | | 12-mo AFC | 250 | | Unknown | Unknown | | | |
| Solar Thermal 7 | | 12-mo AFC | 250 | | Unknown | Unknown | | | |
| Solar Thermal 8 | | 12-mo AFC | 250 | | Unknown | Unknown | | | |
|
PLANNED TOTAL |
1,788 |
|
|
| |
| |
| |
|
| |
NOTES: |
|
DEFINITIONS: |
| |
Bold text in tableidentifies a change from the previous report. |
Green Field - undeveloped site |
| |
* Estimated on-line date if construction is not delayed. |
Brown Field - developed site |
| |
** Estimated on-line date if approved and constructed as proposed. |
Expansion - New unit at existing power plant site, no loss of existing generation |
| |
Projects in italics are emergency siting projects. |
Repower - Modification of existing equipment |
| |
Megawatts in [ ] are not included in totals. |
Replacement - Demolition of old plant and construction of new plant |
| |
{1} 1002 MW replaced with 1200 MW for a net increase of 198 MW |
On Hold indicates the applicant has suspended work. |
| |
{2} 339 MW replaced with 630 MW for a net increase of 291 MW |
Suspended indicates the committee has suspended the proceeding. |
| |
{3} Calpine has received Commission approval to amend the project to add "duct firing," thereby increasing the total generating capacity from 510 to 590 MW. |
| |
{4} Project approved but withdrawn and replaced by Hanford-GWF peaker (01-EP-7). |
| |
{5} Total MW includes 130 MW amendment approved 6/22/05. |
| |
{6} Calpine needs to obtain a new or amended Commission decision for a new location for the Russell City Project (01-AFC-7) approved September 11, 2002, but since "on hold." |
| |
{7} El Centro project (06-SPPE-2) is repower of 44 MW Unit 3 at Imperial Irrigation District El Centro Generating Station with 128 MW new facility, for a net increase of 84+ MW. |
| |
MW for projects withdrawn, cancelled or expired are not included in total available for possible construction. |