Power Plant Projects Since 1996, Updated:
  COLOR KEY:
  Operational / On Line
  Approved
  In Review
  On-line date is expected to be delayed beyond the date shown.
  Expected and disclosed
  Planned but undisclosed
  On hold or suspended. According to developers,
the new on-line date will be determined when the markets are favorable and financing is available.
  Project approved but cancelled by applicant or approved and license expired before construction began; or proceeding terminated by Commission.
 
  Projects On Line
Arranged by
Date On Line
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1a Sunrise - Texaco & Edison Mission E. 98-AFC-4 Operational 320 100 Kern Co. 12/6/00 12/7/00 7/01 6/27/01
2 Sutter - Calpine 97-AFC-2 Operational 540 100 Sutter Co. 4/14/99 7/1/99 7/01 7/2/01
3 Los Medanos (Pittsburg) - Calpine 98-AFC-1 Operational 555 100 Contra Costa 8/17/99 9/17/99 7/01 7/9/01
4 Wildflower Larkspur - Intergen 01-EP-1 Operational 90 100 San Diego Co. 4/4/01 4/5/01 7/01 7/16/01
5 Wildflower Indigo 1,2&3 - Intergen 01-EP-2 Operational 135 100 Riverside Co. 4/4/01 4/5/01 7/01-9/01 7/26-9/10/01
6 Drews - Alliance 01-EP-5 Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 8/15/01
7 Hanford - GWF 01-EP-7 Operational 95 100 Kings Co. 5/10/01 5/11/01 9/01 9/1/01
8 Century - Alliance 01-EP-4 Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 9/15/01
9 Escondido - Calpeak 01-EP-10 Operational 49.5 100 San Diego Co. 6/6/01 6/7/01 9/01 9/30/01
10 Border - Calpeak 01-EP-14 Operational 49.5 100 San Diego Co. 7/11/01 7/12/01 9/01 10/26/01
  Subtotal On Line 2001 1,914            
11 Gilroy I, Units 1,2&3 - Calpine 01-EP-8 Operational 135 100 Santa Clara Co. 5/21/01 5/22/01 9/01 Units 1&2: 1/29/02
Unit 3: 2/20/02
12 King City - Calpine 01-EP-6 Operational 50 100 Monterey Co. 5/2/01 5/3/01 9/01 1/14/02
13 Delta - Calpine 98-AFC-3 Operational 887 100 Contra Costa 2/9/00 4/1/00 7/02 5/10/02
14 Henrietta Peaker - GWF 01-AFC-18 Operational 96 100 Kings Co. 3/7/02 3/8/02 6/02 7/1/02
15 Moss Landing Unit 1 & 2 - Duke 99-AFC-4 Operational 1,060 100 Monterey Co. 10/25/00 11/28/00 6/02 7/11/02
16a Huntington Beach Unit 3 & 4 - AES 00-AFC-13 Operational 450 100 Orange Co. 5/10/01 5/31/01 11/01 Unit 3: 7/31/02
Unit 4: 8/7/03
17 Valero Cogen. Unit 1 01-AFC-5 Operational 51 100 Solano Co. 10/31/01 11/5/01 6/02 10/18/02
  Subtotal On Line 2002 2,729            
18 La Paloma - PG&E Natl. Units 1, 2, 3 & 4 98-AFC-2 Operational 1,124 100 Kern Co. 10/6/99 1/1/00 3/02 Units 1&2: 1/10/03
Units 3&4: 3/7/03
19 Los Esteros 1 - Calpine Units 1, 2, 3 & 4 01-AFC-12 Operational 180 100 Santa Clara Co. 7/2/02
Recertified
3/16/05
Under docket
03-AFC-2
7/8/02 5/03 3/7/03
20 High Desert - Constellation 97-AFC-1 Operational 830 100 San Bernardino 5/3/00 5/1/01 7/03 4/22/03
21 Tracy Peaker - GWF 01-AFC-16 Operational 169 100 San Joaquin Co. 7/17/02 7/22/02 4/03 6/1/03
1b Sunrise Comb. Cycle - Texaco & Mission (amendment to application: 98-AFC-4) 98-AFC-4C Operational 265 100 Kern Co. 11/19/01 12/21/01 6/03 6/1/03
22 Woodland II Combined Cycle - Modesto Irrigation District 01-SPPE-1 Operational 80 100 Stanislaus Co 9/19/01 2/21/02 5/03 6/6/03
23 Blythe I - Blythe Energy, LLC 99-AFC-8 Operational 520 100 Riverside Co. 3/21/01 4/27/01 4/03 7/15/03
24 Elk Hills - Sempra & Oxy 99-AFC-1 Operational 500 100 Kern Co. 12/6/00 6/8/01 12/02 7/24/03
  Subtotal On Line 2003 3,668            
  Subtotal On Line 2004 0            
25 Donald Von Raesfeld Power Plant Project (Formerly Pico Power) Combined Cycle - Silicon Valley Power 02-AFC-3 Operational 147 100 Santa Clara Co. 9/9/03 9/10/03 12/04 3/24/2005
26 Pastoria Phase 1, Unit 1, 2 & 3 - Calpine 99-AFC-7 Operational 750 99 Kern Co. 12/20/00 10/3/01 1/03 Unit 1: 5/4/05
Units 2&3: 7/5/05
27 Metcalf - Calpine 99-AFC-3 Operational 600 100 Santa Clara Co. 9/24/01 1/15/02 7/03 5/27/05
28 Kings River Conservation Dist. Peaker 03-SPPE-2 Operational 97 100 Fresno Co. 5/19/04 11/04 5/05 9/19/05
29 Magnolia - SoCal Power Authority 01-AFC-6 Operational 328 100 Los Angeles Co. 3/5/03 7/21/03 5/05 9/22/05
30 Malburg - City of Vernon Combined Cycle 01-AFC-25 Operational 134 100 Los Angeles Co. 5/20/03 9/11/03 11/05 10/17/05
31a Mountainview Units 3 & 4 - SCE 00-AFC-2 Operational 1,056 100 San Bernardino 3/21/01 9/1/01
Resumed: 3/15/04
6/03 Unit 3: 12/9/05
Unit 4: 1/19/06
  Subtotal On Line 2005 3,112            
32 SMUD Cosumnes Combined Cycle Phase 1 - SMUD 01-AFC-19 Operational 500 100 Sacramento Co. 9/9/03 9/17/03 6/05 2/24/06
33 Walnut Energy Center - Turlock Irrigation District 02-AFC-4 Operational 250 100 Stanislaus Co 2/18/04 3/15/04 4/06 2/28/06
34 Palomar Escondido - Sempra 01-AFC-24 Operational 546 100 San Diego Co. 8/6/03 6/1/04 3/06 4/1/06
35 Riverside Energy Resource Center Units 1 & 2 - City of Riverside 04-SPPE-1 Operational 96 100 Riverside Co. 12/15/04 2/23/05 6/05 Unit 1: 6/1/06
Unit 2: 7/26/2006
36 Ripon Simple Cycle - MID 03-SPPE-1 Operational 95 100 San Joaquin Co. 2/4/04 10/4/04,
Restart
4/1/05
4/05 6/21/06
  Subtotal On Line 2006 1,487            
37 Bottle Rock Geothermal - U.S. Renewables Group 79-AFC-4C
Amendment
Operational 55 100 Lake Co. 12/13/06 12/19/06 6/07 10/1/07
38 Roseville Combined Cycle - Roseville 03-AFC-1 Operational 160 100 Placer Co. 4/13/05 8/18/05 12/07 11/5/07
  Subtotal On Line 2007 215            
39 Niland Peaker - Imperial Irrigation District 06-SPPE-1 Operational 93 100 Imperial Co. 10/11/06 6/25/07 5/08 5/29/08/
  Subtotal On Line 2008 93            
40 Gateway - PG&E
(formerly Contra Costa - Mirant)
00-AFC-1 Operational 530 100 Contra Costa 5/30/01 8/30/01
Resumed: 2/2007
8/03 1/4/09
41a Inland Empire Comb Cycle - GE & Calpine {5} (UNIT 1) 01-AFC-17 Operational 400 100 Riverside Co. 12/17/03 8/29/05 12/05 Unit 1: 1/28/09
400 MW
42 Starwood Midway - Starwood Power-Midway LLC 06-AFC-10 Operational 120 100 Fresno Co. 1/16/08 9/23/08 6/09 5/1/09
43 EIF Panoche - Energy Investors Fund 06-AFC-5 Operational 400 100 Fresno Co. 12/19/07 2/15/08 11/09 7/1/09
44 Otay Mesa - Calpine 99-AFC-5 Operational 590 100 San Diego Co. 4/18/01 Began: 9/10/01
Restart: 6/21/04
Resumed: 5/1/07
7/03 10/3/09
  Subtotal On Line 2009 2,040            
41b Inland Empire Comb Cycle - GE & Calpine {5} (UNIT 2) 01-AFC-17 Operational 400 100 Riverside Co. 12/17/03 8/29/05 12/05 Unit 2: 5/3/2010
45 Orange Grove Energy - J Power USA 08-AFC-4 Operational 96 100 San Diego Co. 4/8/09 7/16/2009 12/10 4/10
Blythe I Transmission Line - Blythe Energy, LLC 99-AFC-8C Operational 115 kV
Transmission
Line
100 Riverside Co. 10/11/06 2/23/09 6/07 4/2010
46 Humboldt Bay Generating Station - PG&E 06-AFC-7 Operational 163 100 Humboldt Co. 9/24/08 10/11/08 9/09 10/1/2010
47 Colusa Generation Station - E&L Westcoast 06-AFC-9 Operational 660 100 Colusa Co. 4/23/08 7/28/08 5/10 12/22/2010
  Subtotal On Line 2010 1319            
48 Riverside Energy Resource Center Expansion, Units 3&4 - City of Riverside 08-SPPE-1 Operational 96 100 Riverside Co. 2/25/09 1/4/10 12/09 11/2011
49 Canyon Power Plant - City of Anaheim 2007-AFC-9C Operational 200 100 Orange 3/17/2010 4/15/2010 7/2011 12/2011
  Subtotal On Line 2011 296            
50 Almond Peaker Power Plant Project - Turlock Irrigation District 2009-AFC-2C Operational 174 100 Stanislaus 12/15/2010 3/1/2011 3/27/2012 7/13/2012
51 Mariposa Peaker Project - Diamond Energy 2009-AFC-3C Operational 200 100 Alameda 5/18/2011 6/8/2011 7/2012 10/2012
52 El Centro Unit 3 Repower - IID 2006-SPPE-2C Operational 128 100 Imperial 1/4/2007 9/2010 4/2012 10/5/2012
53 Tracy Combined Cycle - GWF 2008-AFC-7C Operational 145 100 San Joaquin 3/24/2010 1/10/2011 8/2012 11/1/2012
54 Lodi Energy Center - NCPA 2008-AFC-10C Operational 255 100 San Joaquin 4/21/2010 7/14/2010 6/2012 11/2012
  Subtotal On Line 2012 902            
55 Walnut Creek Peaker - Edison Mission E. 2005-AFC-2C Operational 500 100 Los Angeles 2/27/2008 6/2011 N/A 5/1/2013
56 Marsh Landing Generating Station 2008-AFC-3C Operational 760 100 Contra Costa 8/25/2010 1/15/2010 6/2013 5/1/2013
57 Sentinel Peaker - CPV 2007-AFC-3C Operational 850 100 Riverside 12/1/2010 6/2011 8/2013 8/1/2013
58a El Segundo Power Redevelopment (Dry Cooling Amendment) Units: 5, 6, 7, 8 2000-AFC-14C Operational 560 100 Los Angeles 7/1/2010 5/6/2011 8/2010 8/1/2013
59 Russell City - Calpine & GE 2001-AFC-7C Operational 600 100 Alameda 10/03/2007 9/1/2010 2013 8/8/2013
60 Los Esteros Combined Cycle - Calpine 2003-AFC-2C Operational 140 100 Santa Clara 10/11/2006 5/26/2011 N/A 8/9/2013
61a Genesis Solar Energy Project - NextEra Energy 2009-AFC-8C Operational 125 100 Riverside 9/29/2010 1/17/2011 N/A Unit 2
11/30/2013
62 Ivanpah Solar - Brightsource 2007-AFC-5C Operational 370 100 San Bernardino 9/22/2010 10/2010 10/2012 - 2014 12/30/2013
  Subtotal On Line 2013 3,905            
61b Genesis Solar Energy Project - NextEra Energy 2009-AFC-8C Operational 125 100 Riverside 9/29/2010 1/17/2011 N/A Unit 1
3/7/2014
  Subtotal On Line 2014 125            
  ON-LINE TOTAL - In Operation
With Testing Plants
21,805
21,805
           



  Approved and/or Under Construction
(Arranged By Date Approved)
Docket Number Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction
Start Date
Original
On-Line Date
Current
On-Line Date*
1 Abengoa Mojave Solar Project - Mojave Solar LLC 2009-AFC-5C Under Construction 250 90 San Bernardino 9/8/2010 N/A N/A N/A
2 Blythe Solar - NextEra Blythe Energy Center LLC 2009-AFC-6C Under Construction 1000 Hold Riverside 9/15/2010 Summer 2014 N/A 2015
3 Oakley Generating Station (formerly Contra Costa) 2009-AFC-4C Under Construction 624 10 Contra Costa 5/18/2011 6/8/2011 2013 2016
  Approved and/or Under Construction Subtotal

1,874

           
  Approved and/or Pre-Construction
(Arranged By Date Approved)
Docket Number Status Capacity (MW) Pre-Construction Completed
(percent)
Location Date Approved Construction
Start Date
Original
On-Line Date
Current
On-Line Date*
1 Victorville Hybrid Gas-Solar - City of Victorville 2007-AFC-1C pre-Construction 563 0 San Bernardino 7/16/2008 Extended to
July 16, 2018
8/2010 TBD
2 Avenal Energy - Avenal Power Center, LLC 2008-AFC-1C pre-Construction 600 Delayed Kings 12/16/2009 TBD 12/2011 TBD
3 Hanford Combined-Cycle Power Plant (Hanford Energy Peaker Project Expansion) - GWF Energy LLC 2001-EP-7C pre-Construction 25 0 Kings 3/24/2010 TBD 10/2012 TBD
4 Henrietta Peaker Project Combined Cycle Expansion - GWF Energy LLC 2001-AFC-18C pre-Construction 25 0 Kings 3/24/2010 TBD 10/2012 TBD
5 Rice Solar Energy Project - Rice Solar Energy LLC / SolarReserve LLC 2009-AFC-10C pre-Construction 150 99/On Hold Riverside 12/16/2010 3/2013 N/A N/A
6 Palen - Nalep Solar Project I, LLC 2009-AFC-7C pre-Construction 500 Delayed Riverside 12/16/2010 TBD N/A N/A
7 Hybrid Gas-Solar - City of Palmdale (520 MW gas, 50 MW solar) 2008-AFC-9 pre-Construction 570 Pending Los Angeles Co. 8/10/2011 TBD   2013
8 Watson Cogeneration Steam and Electric Reliability Project 2009-AFC-1 pre-Construction 85 0 Los Angeles Co. 4/11/2012 TBD   TBD
9 Carlsbad - NRG 2007-AFC-6 pre-Construction 558 0 San Diego Co. 05/31/2012 TBD   TBD
10 Pio Pico Energy Center - Pio Pico Energy Center LLC 2011-AFC-1 pre-Construction 300 0 San Diego Co. 9/12/2012 4/2014   TBD
  Approved and/or Under Pre-Construction Subtotal

3,376

           
  Approved and/or Under Construction Total
(Pre-Const and Const)

5,870

           
  Approved & On Hold - Not Under Construction
(Arranged By On-Line Date)
Docket Number Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction
Start Date
Original
On-Line Date
Current
On-Line Date*
1 Black Rock 1, 2, and 3 Geothermal Power Project
(Formerly Salton Sea Geothermal) {4}
2002-AFC-2C On Hold 159 0 Imperial Co. 12/17/03 Extension approved, Const. start 12/18/2014, On Hold: pending a power purchase agreement N/A On Hold
2 Blythe II Combined Cycle - Blythe Energy, LLC 02-AFC-1 On Hold 520 0 Riverside Co. 12/14/05 On Hold   On Hold
  Subtotal Approved and "Available" for Construction 679            
A Tesla Combined Cycle - FPL 2001-AFC-21C Not Built and License Expired 1,120 0 Alameda Co. 6/16/2004 Cancelled N/A Not built and License Expired
B San Joaquin Valley Energy Center - Calpine 2001-AFC-22C Not built and License Expired 1,087 0 Fresno Co. 1/14/2004 Cancelled 1/2006 Not built and License Expired
C Three Mountain - Covanta 1999-AFC-2C Not built and License Expired 500 0 Shasta Co. 5/16/2001 Cancelled 12/2003 Not built and License Expired
D Western Midway-Sunset - Mission 1999-AFC-9C Not built and License Expired 500 0 Kern Co. 3/21/2001 Cancelled 7/2003 Not built and License Expired
E United Golden Gate Phase 1 - El Paso 2000-AFC-5C Not built and License Expired 51 0 San Mateo Co. 3/7/2001 Cancelled 7/2001 Not built and License Expired
F Pegasus Energy - Delta Power 2001-EP-9C Cancelled 181 0 San Bernardino 6/6/2001 Cancelled Cancelled Cancelled
G Chula Vista 2 - Ramco 2001-EP-3C Cancelled 62 0 San Diego Co. 6/13/2001 Cancelled Cancelled Cancelled
H Hanford Energy Park - GWF {3} 2000-SPPE-1C Cancelled 99 0 Kings Co. 4/11/2001 Cancelled Cancelled Cancelled
I Valero Cogen. (Unit 2)
(see Unit 1 - # 17a in "On Line" section)
2001-AFC-5C Not built and License Expired 51 37 Solano Co. 10/31/2001 2/1/2007 12/2002 Not built and License Expired
J San Francisco Reliability Project - City of SF 2004-AFC-1C License Terminated 145 0 San Francisco 10/3/2006   12/2008 License Terminated
K East Altamont - Calpine 2001-AFC-4C License Terminated 1,100 0 Alameda Co. 8/20/03 8/2011 7/05 License Terminated
L Imperial Valley Solar (Formerly SES Solar Two) - Imperial Valley Solar LLC 2008-AFC-5C License Terminated 709 0 Imperial 9/29/2010 N/A N/A License Terminated
M Pastoria Phase 2 Expansion Project - simple cycle addition - Calpine 2005-AFC-1C Not built and License Expired 160 0 Kern Co. 11/8/06     Not built and License Expired
N Morro Bay - L.S. Power {1} 2000-AFC-12C License Withdrawn 1,200 0 San Luis Obispo 8/2/2004
Note:Commission decision not finalized pending NPDS permit.
On Hold On Hold License Withdrawn
O Beacon Solar Energy Project - Beacon Solar LLC 2008-AFC-2C License Terminated 250 Pending Kern 8/25/2010 TBD N/A License Terminated
P Calico Solar - Calico Solar LLC (formerly SES Solar One LLC/Stirling Energy 2008-AFC-13C License Terminated 663.5 Hold/80 San Bernardino 10/28/2010 TBD N/A License Terminated
  Subtotal Approved but Will Not Be Built 7,878.5            
  Subtotal Approved AND Not Under Construction 8,558            
  APPROVED TOTAL 35,682.5            



  Projects Not Approved Docket Number Process Capacity (MW) Project Type Location Date Filed Decision Date    
Eastshore Energy Center - Eastshore Energy, LLC / Tierra Energy 06-AFC-6 12-mo. AFC 116 Brown Field Alameda Co. 9/22/06 PROJECT
DENIED
10/8/08
   
MMC Chula Vista Expansion - MMC Energy Inc. 07-AFC-4 12-mo. AFC 100 Brown Field
Replacement
San Diego Co. 8/10/07 PROJECT
DENIED
6/17/09
   
AES High Grove Power Plant 06-AFC-2 12-mo. AFC 300 Brown Field San Bernardino Co. 5/25/06 PROJECT
WITHDRAWN
2/4/10
   
Rio Mesa Solar Electric Generating Facility
BrightSource Energy
2011-AFC-4 12-month AFC 500 Green Field Riverside Co. 10/14/2011 Project Withdrawn
7/9/2013
   
CPV Vaca-Station - CPV Vacaville LLC 2008-AFC-11 12-month AFC 660 Green Field Solano Co. 11/18/08 Project Withdrawn
8/27/2013
   
  DENIED TOTAL 1,676            



  Projects in Review
(Arranged Alphabetically )
Docket Number Process Capacity (MW) Project Type Location Date Filed Estimated Decision Date   Estimated
On-line Date**
1 Alamitos Energy Center
AES Southland Development, LLC (AES-SD)
2013-AFC-01 12-month AFC 1936 Brownfield Los Angeles County 12/27/2013 ? 12/2014
2 Clean Hydrogen Energy California - Hydrogen Energy International LLC 2008-AFC-8A 12-month AFC 390 Brown Field Kern Co. 7/31/08
Revised AFC filed
5/28/09
Amended AFC Filed 5/2/12
TBD   9/2017
3 El Segundo Power Redevelopment (Dry Cooling Amendment) Units: 9, 10, 11, 12 2000-AFC-14C 12-month-AFC 435 Brownfield Los Angeles Amendment filed
4/28/2013
     
4 Huntington Beach Energy Project - AES Corporation 2012-AFC-02 12-month AFC 939 Brown Field Orange 6/27/2012 TBD   Unit 1 - 6/2018
5 Redondo Beach Repower - AES 2012-AFC-03 12-month AFC 496 Brown Field Los Angeles Co. 11/19/2012 TBD    
6 Willow Pass Generating Station - Mirant 2008-AFC-6 12-month AFC 550 Brown Field Contra Costa Co. 6/30/08 On Hold   TBD
a Hidden Hills Solar Electric Generating System - BrightSource Energy, Inc. 2011-AFC-2 12-month AFC 500 Green Field Inyo Co. 8/5/11 Under Suspension Until 2014   Under Suspension Until 2014
b Quail Brush Generating Project
Quail Brush Genco, LLC.
2011-AFC-3 12-month AFC 100 Green Field San Diego Co. 8/2011 Suspended During Review   Suspended During Review
c Ridgecrest - (solar thermal) 2009-AFC-9 12-month AFC [250] Green Field Kern Co. 9/1/09 Suspended During Review   Suspended During Review
d San Gabriel Generating Station - Reliant 2007-AFC-2 12-month AFC 656 Brown Field San Bernardino Co. 4/13/07 Suspended During Review   Suspended During Review
e Sun Valley Energy Project (simple cycle/peaker) - Edison Mission Energy 2005-AFC-3 12-month AFC 500 Green Field Riverside Co. 12/1/05 Under Suspension Until 2014   Under Suspension Until 2014
  UNDER REVIEW TOTAL
(Excludes Suspended)
4,746            



  Projects Announced
(Arranged By Project Name)
Process Plant type Capacity (MW) Project Type Location Estimated Filing Date      
1 Black Rock 5 & 6 Geothermal Power Project
CE Butte Energy, LLC.
12-month AFC Geothermal Steam Turbine 235 Green Field Imperial Co. TBD      
2 Jasmine III 12-month AFC Natural Gas Cogen 88 Brown Field Bakersfield June 2014      
3 Phoenix Combined Heat and Power 12-month AFC Natural Gas Cogen 163 Brownfield San Bernardino Co. TBD      
  ANNOUNCED TOTAL 398            



   
  NOTES:   DEFINITIONS:
  Bold text in table identifies a change from the previous report. Green Field - undeveloped site
  * Estimated on-line date if construction is not delayed. Brown Field - developed site
  ** Estimated on-line date if approved and constructed as proposed. Expansion - New unit at existing power plant site, no loss of existing generation
  Projects in italics are emergency siting projects. Repower - Modification of existing equipment
  Megawatts in [ ] are not included in totals. Replacement - Demolition of old plant and construction of new plant
  {1} 1002 MW replaced with 1200 MW for a net increase of 198 MW On Hold indicates the applicant has suspended work.
  {2} 339 MW replaced with 630 MW for a net increase of 291 MW Suspended indicates the committee has suspended the proceeding.
  {3} Calpine has received Commission approval to amend the project to add "duct firing," thereby increasing the total generating capacity from 510 to 590 MW.
  {4} Amendment Approved 2/2/2011.
  {5} Total MW includes 130 MW amendment approved 6/22/05.
  {6} Calpine needs to obtain a new or amended Commission decision for a new location for the Russell City Project (01-AFC-7) approved September 11, 2002, but since "on hold."
  {7} El Centro project (06-SPPE-2) is repower of 44 MW Unit 3 at Imperial Irrigation District El Centro Generating Station with 128 MW new facility, for a net increase of 84+ MW.
  MW for projects withdrawn, cancelled or expired are not included in total available for possible construction.