Welcome to the California Energy Commission


IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Docket Number: 99-AFC-8C

Blythe Energy Project Transmission Line Modifications
Documents Page

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.


 
 

Commission's Documents

Commission Decision on Amendment Petition. Posted: October 13, 2006. (PDF file, 6 pgs, 48 kb)

Presiding Member's Proposed Decision on Blythe Transmission LIne Project. Posted: September 27, 2006.
(PDF file, 7 pgs, 54 kb)

Transcript for the September 22, 2006 Evidentiary Hearing And Hearing Order. Posted: September 26, 2006 (Acrobat PDF, 18 pgs, 72 kb).

Commission Staff's Evidentiary Hearing Statement Posted: September 19, 2006 (Acrobat PDF, 623 pgs, 60 kb).

Revised Staff Assessment / Draft Environmental Assessment Posted: September 7, 2006. (Acrobat PDF, 623 pgs, 6.1 megabytes)

Transcript of the July 31, 2006 Prehearing Conference. Posted: August 8, 2006.
(PDF file, 36 pgs, 144 kb)

Commission Staff's Prehearing Conference Statement. Posted: July 26, 2006.
(PDF file, 8 pgs, 64 kb)

Staff Assessment/Draft Environmental Assessment. Posted: May 25, 2006.
(PDF file, 569 pgs, 6.82 megabytes)

Status Report #7. Posted: February 02, 2006. (PDF file, 2 pgs, 16 kb)

Status Report #6. Posted: October 28, 2005. (PDF file, 6 pgs, 52 kb)

Status Report #5. Posted: September 14, 2005. (PDF file, 2 pgs, 24 kb)

Status Report #4. Posted: July 13, 2005. (Acrobat PDF, 2 pg, 36 kb)

Clarification Status Report #3. Posted: March 22, 2005. (Acrobat PDF, 1 pg, 60 kb)

Status Report #3. Posted: March 3, 2005. (Acrobat PDF, 2 pg, 32 kb)

Preliminary Staff Assessment Posted: January 25, 2005. (Acrobat PDF, 406 pgs, 3.2 megabytes)

Status Report #2. Posted: January 20, 2005. (Acrobat PDF, 2 pg, 92 kb)

Status Report #1. Posted: December 14, 2004. (Acrobat PDF, 4 pg, 32 kb)

Transcript of November 10, 2004, Informational Hearing and Site Visit. Posted: November 16, 2004. (Acrobat PDF, 76 pg, 136 kb)

Issues Identification Report. Posted: November 04, 2004. (Acrobat PDF, 9 pg, 28 kb)

Data Requests 1 - 99. Posted: November 02, 2004. (Acrobat PDF, 38 pg, 332 kb)


Applicant's Documents

Please note: The following files are too large to make available on our website. If you would like a copy of a CD-ROM with these files, please contact project manager Jack Caswell at 916-653-0062.

  • Blythe Energy Project Application For Certification Vol. 1 (Acrobat PDF, 384 pgs, 263 megabytes)
  • Blythe Energy Project Application For Certification Vol. 2 (Acrobat PDF, 321 pgs, 116 megabytes)

Intervenors' and Others' Documents

Finding of No Significant Impact - U.S. Department of Energy and the U.S. Department of the Interior. March, 2007. Posted: May 8, 2007. (Acrobat PDF, 26 pgs, 376 kb)

Finding of No Significant Impact and Floodplain Statement of Findings. Posted: April 11, 2007. (Acrobat PDF, 22 pg, 83.4 kb)

Approved Proposed Action (A right-of-way). Posted: April 11, 2007. (Acrobat PDF, 4 pg, 14.7 kb)


Figures and Maps

Figures for Prehearing Conference Statement of Caithness. Posted: July 31, 2006 (Acrobat PDF Files)

Figure 3.1-1 Regional Location Map (Acrobat PDF, 1 pg, 135 kb)

Figure 3.1-1 Regional Location Map (Acrobat PDF, 1 pg, 135 kb)

Figure 3.1-2 Buck Substation to Julian Hinds (Acrobat PDF, 1 pg, 3.0 megabytes - note size!)

Figure 3.1-3 Buck Substation to Devers Palo-Verde (Acrobat PDF, 1 pg, 2.8 megabytes - note size!)