IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Bottle Rock Geothermal Plant Repowering - Documents Page

Docket Number: 79-AFC-4C

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.


 
 

Commission's Documents

California Energy Commission Staff's Status Request Set One, Numbers 1 - 5. Posted June 28, 2013 (PDF file, 8 pages, 225 kb).

Memorandum Regarding Bottle Rock Geothermal Project Amendment Schedule Modification Request. Posted June 21, 2013 (PDF file, 5 pages, 98 kb).

Transcript of June 5, 2013, Continuance of Committee Conference. Posted June 10, 2013 (PDF file, 9 pages, 33 kb).

Transcript of May 31, 2013, Public Site Visit and Committee Conference. Posted June 10, 2013 (PDF file, 75 pages, 135 kb).

Issues Identification Report. Re-Posted May 29, 2013 (PDF file, 14 pages, 229 kb).

Commission Chair's Memorandum re Hearing Adviser Assignment. Posted May 1, 2013 (PDF file, 1 pages, 57 kb).

Staff Analysis of Petition to Change the Ownership, Allow the Restart of Operation After Suspension, and Allow 11 Facility Design Changes . Posted November 11, 2006 (PDF file, 80 pages, 373 kb).

Staff analysis of petition to extended environmental monitoring program during suspended operations. Posted: April 14, 2005. (PDF file, 12 pages, 264kb).

Petition for Extending Environmental Monitoring Program. Posted January 26, 2005. (PDF file, 26 pages, 108 kb).

California Energy Commission Original Final Decision (79-AFC-4) - Dated: November 5, 1980. Posted - October 20, 2009. (PDF file, 360 pages, 8.4 megabytes)


Applicant's Documents

Applicant's Letter to California Energy Commission's Karen Douglas and Robert Weisenmiller Regarding Decommissioning Estimate. Posted April 16, 2013. (PDF file, 14 pages, 709 kb)

Applicant's Petition to Amend. Posted March 12, 2013. (PDF file, 31 pages, 852 kb)

Letter Requesting Withdrawal of Petition to Amend Existing BRP License. Dated July 25, 2011. Posted: July 26, 2011. (PDF file, 1 page, 342 kb)

Bottle Rock Power Steam Project Response to Comments on the Final Environmental Impact Report/Environmental Assessment. Posted: December 16, 2010. (PDF file, 415 pages, 41.6 mb, Please note file size.)

Draft Environmental Impact Report / Environmental Assessment

Traffic Addendum for the Petition to Amend the California Energy Commission Final Decision. Dated February, 2010. Posted: March 8, 2010. (PDF file, 40 pages, 2.48 mb)

Water Resources Addendum for the Petition to Amend the California Energy Commission Final Decision. Dated February, 2010. Posted: March 8, 2010. (PDF file, 40 pages, 2.37 mb)

Petition to Amend the Final Decision. Dated September 30, 2009. Revised Version Posted: October 12, 2009. (PDF file, 767 pages, 73.6 mb, Please note file size)


Intervenors' and Others' Documents

None at this time.