Bullard Energy Center (BEC)
Power Plant Licensing Case
ANNOUNCEMENTS

March 6, 2008
Order Terminating Proceedings


August 27, 2007
Order Suspending Proceeding


August 6, 2007
Request to suspend AFC


Also see our
Energy Calendar

Docket Number: 06-AFC-8
(Application For Certification)

Committee Overseeing This Case:

Jeffrey Byron, Commissioner
Presiding Member

Karen Douglas, Commissioner
Associate Member

Hearing Officer: Kenneth Celli


Key Dates

  • February 22, 2008 - Bullard Energy Center, LLC filed request to terminate AFC.
  • August 6, 2007 - Bullard Energy Center, LLC filed request to suspend AFC.
  • January 3, 2007 - Commission accepts Application for Certification (AFC) as complete.
  • November 6, 2006 - Application for Certification (AFC) filed with California Energy Commission.

General Description of Project

On November 6, 2006, Bullard Energy Center, LLC, submitted an Application for Certification (AFC) to construct and operate a simple-cycle electrical generating facility, the Bullard Energy Center (BEC), in Fresno, California.

The proposed BEC project would be a simple-cycle electrical generating facility located in Fresno. The BEC project will have a nominal electrical output of 200 megawatts (MW) with construction planned to start in 2008 and commercial operation planned by summer 2009. The project is proposed as a 12-month AFC. The applicant has a 20-year contract with Pacific Gas & Electric (PG&E) as a result of the 2004 PG&E Request for Offers for new generation resources.

The BEC is designed as a peaking facility to meet electric generation load during periods of high demand, which generally occur during daytime hours, and more frequently during the summer than other portions of the year. The project is expected to have an annual capacity factor of no higher than 57 percent, depending on weather and customer demand, load growth, hydroelectric supplies, generation retirements and replacements, the level of generating unit and transmission outages, and other factors. The generating facility will include two General Electric (GE) LMS100 natural gas-fired combustion turbine generators (CTGs), inlet air filters with evaporative coolers, turbine compressor section inter-cooler, mechanical draft cooling tower, circulating water pumps, water treatment equipment, natural gas compressors, generator step-up and auxiliary transformers, and water storage tank.

The proposed BEC plant site, a 12.3-acre parcel (Assessors Parcel Number 505-080-22S), is located approximately 1.25 miles southeast of the intersection of Herndon Avenue and North Golden State Boulevard, at 5829 North Golden State Boulevard, in the City of Fresno. This parcel is zoned M-1 (light industrial use) and is located in an industrial area. A truck depot, and construction equipment fabrication and storage yard are currently located on this site. The plant site will be leased and/or purchased at the option of BEC. There will also be a temporary construction laydown and parking site on a 9.2-acre parcel located immediately to the north of the plant site.

A new 230 kV looping substation will be constructed on-site, tying into the east side of the existing PG&E Herndon-Kearney 230 kV line, which runs from south to north across the southwest corner of the site. This new sub-station will be on approximately 3.0 acres located on the southwest portion of the 12.3-acre site between the Herndon sub-station to the north, and the Kearney substation to the south. Approximately two miles of the existing 230 kV transmission line will require re-conductoring.

The project will connect to a PG&E natural gas pipeline approximately 9,500 feet west of the site. The primary pipeline route will convey gas via a new pipeline up to 12 inches in diameter along West Bullard Avenue to North Golden State Boulevard, and then south to the site. Two alternate routes involve the same PG&E gas connection location, running north along North Garfield Avenue to Herndon Avenue, then south along North Golden State Boulevard and North Weber Street to the site.

A Fresno city water main located near the southeast corner of the site along North Golden State Boulevard will be extended approximately 300 feet, to the northeast corner of the site.

Wastewater from the site will be conveyed via an approximate 14-inch diameter, 1,500-foot sewer line proceeding northwest along North Golden State Boulevard, tying into the existing 54-inch City of Fresno trunk line, just north of the intersection of North Golden State Boulevard and West Bullard Avenue.

Air emissions from the proposed facility would be controlled using best available control technology applied to each engine's exhaust. Each of the two GE LMS100 natural gas-fired CTGs will be equipped with water injection to the combustors for reducing production of NOx, a selective catalytic reduction system with 19 percent ammonia injection to further reduce NOx emissions and an oxidation catalyst to reduce carbon monoxide emissions. Final permitting by the Energy Commission would reflect conformance with rules and regulations of the San Joaquin Valley Air Pollution Control District and include the issuance of a Determination of Compliance from the District.


Energy Commission Facility Certification Process

The Energy Commission is responsible for reviewing and ultimately approving or denying all applications to construct and operate thermal electric power plants, 50 MW and greater, in California. The Energy Commission's facility certification process carefully examines public health and safety, environmental impacts and engineering aspects of proposed power plants, and all related facilities such as electric transmission lines and natural gas and water pipelines. The Energy Commission is the lead agency under the California Environmental Quality Act (CEQA), but produces several environmental and decision documents rather than an Environmental Impact Report.


For More Information, Please Contact:

Mary Dyas
Project Manager
California Energy Commission
1516 Ninth Street, MS-15
Sacramento, CA 95814
Phone: 916-651-8891
mdyas@energy.state.ca.us

For Questions About Participation In Siting Cases Contact:

Public Adviser
California Energy Commission
1516 Ninth Street, MS-12
Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PAO@energy.state.ca.us

News Media Please Contact:

Claudia Chandler
Assistant Executive Director
Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.state.ca.us

Page Updated:
Go to Content | Go to Page Navigation | Go to Page Updated Information | Go to Footer