Once a power plant application has been approved by the California Energy Commission, the project must comply with provisions of its license. Hence, the project enters into the "compliance" phase, and a letter "C" is added to the project's docket number to differentiate it from the regular licensing proceeding.

Occassionally, a major amendment to the original license requires that a separate website section be created. Those cases normally have the word "Amendment" added, are often given a new docket number, and are treated similar to an original license proceeding.

For links to ALL projects since 1996 - including ones currently under review, see alphabetical listing.
For projects under Compliance Proceedings, click on project names below.

POWER PLANT COMPLIANCE PROJECTS
Projects Since 1996, Updated: 10/30/2013
  COLOR KEY:
  Operational / On Line
  On hold or construction suspended. According to developers,
the new on-line date will be determined when the markets are favorable and financing is available.
  Under construction or pre-construction.
 
  Project Name - Owner Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1 Abengoa Mojave Solar Project - Mojave Solar LLC 2009-AFC-5C Under Construction 250 80 San Bernardino 9/8/2010 N/A N/A N/A
2 Almond Peaker Power Plant Project - Turlock Irrigation District 2009-AFC-2C Operational 174 100 Stanislaus 12/15/2010 3/1/2011 3/27/2012 7/13/2012
3 Avenal Energy - Avenal Power Center, LLC 2008-AFC-1C pre-Construction 600 Delayed Kings 12/16/2009 TBD 12/2011 TBD
4 Blythe I - Blythe Energy, LLC 99-AFC-8C Operational 520 100 Riverside Co. 3/21/01 4/27/01 4/03 7/15/03
5 Blythe I Transmission Line - Blythe Energy, LLC 99-AFC-8C Operational 230 kV
Transmission
Line
100 Riverside Co. 10/11/06 2/23/09 6/07 4/2010
6 Blythe II Combined Cycle - Blythe Energy, LLC 02-AFC-1C On Hold 520 0 Riverside Co. 12/14/05 --   On Hold
7 Blythe Solar - NextEra Blythe Energy Center LLC 2009-AFC-6C Under Construction 1000 Hold Riverside 9/15/2010 Summer 2014 N/A 2015
8 Border - Calpeak 01-EP-14C Operational 49.5 100 San Diego Co. 7/11/01 7/12/01 9/01 10/26/01
9 Bottle Rock Geothermal - U.S. Renewables Group 79-AFC-4C
Amendment
Operational 17 100 Lake Co. 12/13/06 12/19/06 6/07 10/1/07
10 Canyon Power Plant - City of Anaheim 2007-AFC-9C Operational 200 100 Orange 3/17/2010 4/15/2010 7/2011 12/2011
11 Carlsbad - NRG 2007-AFC-6 pre-Construction 558 0 San Diego Co. 05/31/2012 TBD   TBD
12 Century - Alliance 01-EP-4C Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 9/15/01
13 City of Victorville Hybrid (513 MW gas, 50 MW solar) 07-AFC-1C Preconstruction 563 0 San Bernardino Co. 7/16/08 11/08 8/10 TBD
14 Colusa Generation Station - E&L Westcoast 06-AFC-9C Operational 660 100 Colusa Co. 4/23/08 7/28/08 5/10 12/22/2010
15 Delta - Calpine 98-AFC-3C Operational 887 100 Contra Costa 2/9/00 4/1/00 7/02 5/10/02
16 Drews - Alliance 01-EP-5C Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 8/15/01
17 El Centro Unit 3 Repower - Imperial Irrigation District{7}
Expansion project
06-SPPE-2C Operational 128 100 Imperial Co. 1/4/07 9/2010 42012 10/5/2012
18 Elk Hills - Sempra & Oxy 99-AFC-1C Operational 500 100 Kern Co. 12/6/00 6/8/01 12/02 7/24/03
19 El Segundo Repower - Dynegy/NRG {2} 00-AFC-14C Operational 630 100 Los Angeles Co. 7/1/2010 5/6/2011 8/2010 8/1/2013
20 Escondido - Calpeak 01-EP-10C Operational 49.5 100 San Diego Co. 6/6/01 6/7/01 9/01 9/30/01
21 Gateway - PG&E
(formerly Contra Costa - Mirant)
00-AFC-1 Operational 530 100 Contra Costa 5/30/01 8/30/01
Resumed
2/2007
8/03 1/4/09
22 Genesis Solar Energy Project - NextEra Energy 2009-AFC-8C Under Construction 250 76 Riverside 9/29/2010 1/17/2011 N/A N/A
23 Gilroy I, Units 1,2&3 - Calpine 01-EP-8C Operational 135 100 Santa Clara Co. 5/21/01 5/22/01 9/01 Units 1&2: 1/29/02
Unit 3: 2/20/02
24a Hanford - GWF 01-EP-7C Operational 95 100 Kings Co. 5/10/01 5/11/01 9/01 9/1/01
24b Hanford Combined-Cycle Power Plant (Hanford Energy Peaker Project Expansion) - GWF Energy LLC 2001-EP-7C pre-Construction 25 0 Kings 3/24/2010 TBD 10/2012 TBD
25a Henrietta Peaker - GWF 01-AFC-18C Operational 96 100 Kings Co. 3/7/02 3/8/02 6/02 7/1/02
25b Henrietta Peaker Project Combined Cycle Expansion - GWF Energy LLC 2001-AFC-18C pre-Construction 25 0 Kings 3/24/2010 TBD 10/2012 TBD
26 High Desert - Constellation 97-AFC-1C Operational 830 100 San Bernardino 5/3/00 5/1/01 7/03 4/22/03
27 Humboldt Bay Repowering Project - PG&E 06-AFC-7C Operational 163 100 Humboldt Co. 9/24/08 10/11/08 9/09 10/1/2010
28 Huntington Beach Unit 3 & 4 - AES 00-AFC-13C Operational 450 100 Orange Co. 5/10/01 5/31/01 11/01 Unit 3: 7/31/02
Unit 4: 8/7/03
29 Inland Empire Comb Cycle - GE & Calpine {5} 01-AFC-17C Opperational 800 100 Riverside Co. 12/17/03 8/29/05 12/05 Unit 1: 1/28/09
400 MW
unit 2: 5/3/2010
400 MW
30 Ivanpah Solar - Brightsource 2007-AFC-5C Under Construction 370 95 San Bernardino 9/22/2010 10/2010 10/2012 - 2014 10/2012 - 2014 Phased
31 King City - Calpine 01-EP-6C Operational 50 100 Monterey Co. 5/2/01 5/3/01 9/01 1/14/02
32 Kings River Conservation Dist. Peaker 03-SPPE-2C Operational 97 100 Fresno Co. 5/19/04 11/04 5/05 9/19/05
33 La Paloma - PG&E Natl. Units 1, 2, 3 & 4 98-AFC-2C Operational 1,124 100 Kern Co. 10/6/99 1/1/00 3/02 Units 1&2: 1/10/03
Units 3&4: 3/7/03
34 Lodi Energy Center - NCPA 2008-AFC-10C Operational 255 100 San Joaquin 4/21/2010 7/14/2010 6/2012 11/2012
35 Los Esteros 1 - Calpine Units 1, 2, 3 & 4 01-AFC-12C Operational 180 100 Santa Clara Co. 7/2/02
Recertified
3/16/05
Under docket
03-AFC-2
7/8/02 5/03 3/7/03
36 Los Esteros 2 Combined Cycle - Calpine 03-AFC-2C Operational 140 100 Santa Clara Co. 10/11/06 5/26/2011 N/A 8/9/2013
37 Los Medanos (Pittsburg) - Calpine 98-AFC-1C Operational 555 100 Contra Costa 8/17/99 9/17/99 7/01 7/9/01
38 Magnolia - SoCal Power Authority 01-AFC-6C Operational 328 100 Los Angeles Co. 3/5/03 7/21/03 5/05 9/22/05
39 Malburg - City of Vernon Combined Cycle 01-AFC-25C Operational 134 100 Los Angeles Co. 5/20/03 9/11/03 11/05 10/17/05
40 Mariposa Peaker Project - Diamond Energy 2009-AFC-3C Operational 200 100 Alameda 5/18/2011 6/8/2011 7/2012 10/2012
41 Marsh Landing Generating Station 2008-AFC-3C Operational 760 100 Contra Costa 8/25/2010 1/15/2010 6/2013 5/1/2013
42 Metcalf - Calpine 99-AFC-3C Operational 600 100 Santa Clara Co. 9/24/01 1/15/02 7/03 5/27/05
43 Moss Landing Unit 1 & 2 - Duke 99-AFC-4C Operational 1,060 100 Monterey Co. 10/25/00 11/28/00 6/02 7/11/02
44 Mountainview Units 3 & 4 - SCE 00-AFC-2C Operational 1,056 100 San Bernardino 3/21/01 9/1/01,
resumed 3/15/04
6/03 Unit 3: 12/9/05
Unit 4: 1/19/06
45 Niland Peaker - Imperial Irrigation District 06-SPPE-1 Operational 93 100 Imperial Co. 10/11/06 6/25/07 5/08 5/29/08
46 Oakley Generating Station (formerly Contra Costa) 2009-AFC-4C Under Construction 624 10 Contra Costa 5/18/2011 6/8/2011 2013 2016
47 Orange Grove Energy - J Power USA 08-AFC-4 Operational 96 100 San Diego Co. 4/8/09 7/16/2009 12/10 4/10
48 Otay Mesa - Calpine 99-AFC-5 Operational 590 100 San Diego Co. 4/18/01 Began
9/10/01
Restart 6/21/04
Resumed
5/1/07
7/03 10/3/09
49 Palen - Nalep Solar Project I, LLC 2009-AFC-7C pre-Construction 500 Delayed Riverside 12/16/2010 9/2010 N/A N/A
50 Hybrid Gas-Solar - City of Palmdale (520 MW gas, 50 MW solar) 2008-AFC-9 pre-Construction 570 Pending Los Angeles Co. 8/10/2011 TBD   2013
51 Palomar Escondido - Sempra 01-AFC-24C Operational 546 100 San Diego Co. 8/6/03 6/1/04 3/06 4/1/06
52 Panoche - Energy Investors Fund 06-AFC-5 Operational 400 100/td> Fresno Co. 12/19/07 2/15/08 11/09 7/1/09
53 Pastoria Phase 1, Unit 1, 2 & 3 - Calpine 99-AFC-7C Operational 750 99 Kern Co. 12/20/00 10/3/01 1/03 Unit 1: 5/4/05
Units 2&3: 7/5/05
54 Pio Pico Energy Center - Pio Pico Energy Center LLC 2011-AFC-1 pre-Construction 300 0 San Diego Co. 9/12/2012 3/2013   5/2014
55 Rice Solar Energy Project - Rice Solar Energy LLC / SolarReserve LLC 2009-AFC-10C pre-Construction 150 90 Riverside 12/16/2010 3/2013 N/A N/A
56 Ripon Simple Cycle - MID 03-SPPE-1C Operational 95 100 San Joaquin Co. 2/4/04 10/4/04,
Restart
4/1/05
4/05 6/21/06
57 Riverside Energy Resource Center Units 1 & 2 - City of Riverside 04-SPPE-1C Operational 96 100 Riverside Co. 12/15/04 2/23/05 6/05 Unit 1: 6/1/06
Unit 2: 7/26/2006
58 Roseville Combined Cycle - Roseville 03-AFC-1C Operational 160 100 Placer Co. 4/13/05 8/18/05 12/07 11/5/07
59 Russell City - Calpine & GE 01-AFC-7C Operational 600 100 Alameda Co. 10/3/07 9/1/2010 2013 8/8/2013
60 Salton Sea Geothermal {4} 02-AFC-2C On Hold 215 0 Imperial Co. 12/17/03 -- 1/06 On Hold
61 Sentinel Peaker - CPV 2007-AFC-3C Operational 850 100 Riverside 12/1/2010 6/2011 8/2013 5/1/2013
62 SMUD Cosumnes Combined Cycle Phase 1 - SMUD 01-AFC-19C Operational 500 100 Sacramento Co. 9/9/03 9/17/03 6/05 2/24/06
63 Starwood Midway Firebaugh/Panoche - Starwood Power-Midway LLC 06-AFC-10C Operational 120 100 Fresno Co. 1/16/08 9/23/08-- 6/09 5/5/09
64a Sunrise - Texaco & Edison Mission E. 98-AFC-4C Operational 320 100 Kern Co. 12/6/00 12/7/00 7/01 6/27/01
64b Sunrise Combined Cycle - Texaco & Mission (amendment to application: 98-AFC-4) 98-AFC-4CC Operational 265 100 Kern Co. 11/19/01 12/21/01 6/03 6/1/03
65 Sutter - Calpine 97-AFC-2C Operational 540 100 Sutter Co. 4/14/99 7/1/99 7/01 7/2/01
66 Tracy Combined Cycle - GWF 2008-AFC-7C Operational 145 100 San Joaquin 3/24/2010 1/10/2011 8/2012 11/1/2012
67 Tracy Peaker - GWF 01-AFC-16C Operational 169 100 San Joaquin Co. 7/17/02 7/22/02 4/03 6/1/03
68 Victorville Hybrid Gas-Solar - City of Victorville 2007-AFC-1C pre-Construction 563 0 San Bernardino 7/16/2008 Extended to
July 16, 2018
8/2010 TBD
69 Walnut Creek Energy Park - Edison Mission Energy 05-AFC-2C Operational 500 100 Los Angeles Co. 2/27/08 6/2011 N/A 5/1/2013
70 Walnut Energy Center - Turlock Irrigation District 02-AFC-4C Operational 250 100 Stanislaus Co 2/18/04 3/15/04 4/06 2/28/06
71 Watson Cogeneration Steam and Electric Reliability Project 2009-AFC-1 pre-Construction 85 0 Los Angeles Co. 4/11/2012 TBD   TBD
72 Wildflower Larkspur - Intergen 01-EP-1C Operational 90 100 San Diego Co. 4/4/01 4/5/01 7/01 7/16/01
73 Wildflower Indigo 1,2&3 - Intergen 01-EP-2C Operational 135 100 Riverside Co. 4/4/01 4/5/01 7/01-9/01 7/26-9/10/01
74 Woodland II Combined Cycle - Modesto Irrigation District 01-SPPE-1C Operational 80 100 Stanislaus Co 9/19/01 2/21/02 5/03 6/6/03
75 Valero Cogen. Unit 1 01-AFC-5C Operational 51 100 Solano Co. 10/31/01 11/5/01 6/02 10/18/02
76 Von Raesfeld Power Plant Project (Formerly Pico Power) Combined Cycle - Silicon Valley Power 02-AFC-3C Operational 147 100 Santa Clara Co. 9/9/03 9/10/03 12/04 3/24/2005