Power Plant Compliance Projects

Once a power plant application has been approved by the California Energy Commission, the project must comply with provisions of its license. Hence, the project enters into the "compliance" phase, and a letter "C" is added to the project's docket number to differentiate it from the regular licensing proceeding.

Occassionally, a major amendment to the original license requires that a separate website section be created. Those cases normally have the word "Amendment" added, are often given a new docket number, and are treated similar to an original license proceeding.

For links to ALL projects since 1996 - including ones currently under review, see alphabetical listing.
For projects under Compliance Proceedings, click on project names below.

POWER PLANT COMPLIANCE PROJECTS
Projects Since 1996, Updated: 10/31/2008
  COLOR KEY:
  Operational / On Line
  On hold or construction suspended. According to developers,
the new on-line date will be determined when the markets are favorable and financing is available.
  Under construction or pre-construction.
 
  Project Name - Owner Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1 Blythe I - Blythe Energy, LLC 99-AFC-8C Operational 520 100 Riverside Co. 3/21/01 4/27/01 4/03 7/15/03
2 Blythe I Transmission Line - Blythe Energy, LLC 99-AFC-8C On Hold 230 kV
Transmission
Line
0 Riverside Co. 10/11/06 --   On Hold
3 Blythe II Combined Cycle - Blythe Energy, LLC 02-AFC-1C On Hold 520 0 Riverside Co. 12/14/05 --   On Hold
4 Border - Calpeak 01-EP-14C Operational 49.5 100 San Diego Co. 7/11/01 7/12/01 9/01 10/26/01
5 Bottle Rock Geothermal - U.S. Renewables Group 79-AFC-4C
Amendment
Operational 17 100 Lake Co. 12/13/06 12/19/06 6/07 10/1/07
6 Century - Alliance 01-EP-4C Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 9/15/01
7 City of Victorville Hybrid (513 MW gas, 50 MW solar) 07-AFC-1C Preconstruction 563 0 San Bernardino Co. 7/16/08 11/08 8/10 11/10
8 Colusa Generation Station - E&L Westcoast 06-AFC-9C Construction 660 3 Colusa Co. 4/23/08 7/28/08 5/10 10/10
9 Delta - Calpine 98-AFC-3C Operational 887 100 Contra Costa 2/9/00 4/1/00 7/02 5/10/02
10 Drews - Alliance 01-EP-5C Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 8/15/01
11 East Altamont - Calpine 01-AFC-4C On Hold 1,100 0 Alameda Co. 8/20/03C On Hold 7/05 On Hold
12 El Centro Unit 3 Repower - Imperial Irrigation District{7}
Expansion project
06-SPPE-2C On Hold 85 0 Imperial Co. 1/3/07 -- 5/09 On Hold
13 Elk Hills - Sempra & Oxy 99-AFC-1C Operational 500 100 Kern Co. 12/6/00 6/8/01 12/02 7/24/03
14 El Segundo Repower - Dynegy/NRG {2} 00-AFC-14C On Hold 630 0 Los Angeles Co. 2/2/05 Construction pending dry cooling amendment -- On Hold
15 Escondido - Calpeak 01-EP-10C Operational 49.5 100 San Diego Co. 6/6/01 6/7/01 9/01 9/30/01
16 Gateway - PG&E
(formerly Contra Costa - Mirant)
00-AFC-1 Under Construction 530 90 Contra Costa 5/30/01 8/30/01
Resumed
2/2007
8/03 6/09
17 Gilroy I, Units 1,2&3 - Calpine 01-EP-8C Operational 135 100 Santa Clara Co. 5/21/01 5/22/01 9/01 Units 1&2: 1/29/02
Unit 3: 2/20/02
18 Hanford - GWF 01-EP-7C Operational 95 100 Kings Co. 5/10/01 5/11/01 9/01 9/1/01
19 Henrietta Peaker - GWF 01-AFC-18C Operational 96 100 Kings Co. 3/7/02 3/8/02 6/02 7/1/02
20 High Desert - Constellation 97-AFC-1C Operational 830 100 San Bernardino 5/3/00 5/1/01 7/03 4/22/03
21 Humboldt Bay Repowering Project - PG&E 06-AFC-7C Under Construction 163 0 Humboldt Co. 9/24/08 10/11/08 8/09 4/09
22 Huntington Beach Unit 3 & 4 - AES 00-AFC-13C Operational 450 100 Orange Co. 5/10/01 5/31/01 11/01 Unit 3: 7/31/02
Unit 4: 8/7/03
23 Inland Empire Comb Cycle - GE & Calpine {5} 01-AFC-17C Partially Operatioaln 800 95 Riverside Co. 12/17/03 8/29/05 12/05 Unit 1: 1/28/09
400 MW
unit 2: 1/2010
400 MW
24 King City - Calpine 01-EP-6C Operational 50 100 Monterey Co. 5/2/01 5/3/01 9/01 1/14/02
25 Kings River Conservation Dist. Peaker 03-SPPE-2C Operational 97 100 Fresno Co. 5/19/04 11/04 5/05 9/19/05
26 La Paloma - PG&E Natl. Units 1, 2, 3 & 4 98-AFC-2C Operational 1,124 100 Kern Co. 10/6/99 1/1/00 3/02 Units 1&2: 1/10/03
Units 3&4: 3/7/03
27 Los Esteros 1 - Calpine Units 1, 2, 3 & 4 01-AFC-12C Operational 180 100 Santa Clara Co. 7/2/02
Recertified
3/16/05
Under docket
03-AFC-2
7/8/02 5/03 3/7/03
28 Los Esteros 2 Combined Cycle - Calpine 03-AFC-2C On Hold 140 0 Santa Clara Co. 10/11/06 --   On Hold
29 Los Medanos (Pittsburg) - Calpine 98-AFC-1C Operational 555 100 Contra Costa 8/17/99 9/17/99 7/01 7/9/01
30 Magnolia - SoCal Power Authority 01-AFC-6C Operational 328 100 Los Angeles Co. 3/5/03 7/21/03 5/05 9/22/05
31 Malburg - City of Vernon Combined Cycle 01-AFC-25C Operational 134 100 Los Angeles Co. 5/20/03 9/11/03 11/05 10/17/05
32 Metcalf - Calpine 99-AFC-3C Operational 600 100 Santa Clara Co. 9/24/01 1/15/02 7/03 5/27/05
33 Morro Bay - L.S. Power {1} 00-AFC-12C On Hold 1,200 0 San Luis Obispo 8/2/04 On Hold On Hold On Hold
34 Moss Landing Unit 1 & 2 - Duke 99-AFC-4C Operational 1,060 100 Monterey Co. 10/25/00 11/28/00 6/02 7/11/02
35 Mountainview Units 3 & 4 - SCE 00-AFC-2C Operational 1,056 100 San Bernardino 3/21/01 9/1/01,
resumed 3/15/04
6/03 Unit 3: 12/9/05
Unit 4: 1/19/06
36 Niland Peaker - Imperial Irrigation District 06-SPPE-1 Operational 93 100 Imperial Co. 10/11/06 6/25/07 5/08 5/29/08
37 Otay Mesa - Calpine 99-AFC-5 Under Construction 590 60 San Diego Co. 4/18/01 Began
9/10/01
Restart 6/21/04
Resumed
5/1/07
7/03 10/09
38 Palomar Escondido - Sempra 01-AFC-24C Operational 546 100 San Diego Co. 8/6/03 6/1/04 3/06 4/1/06
39 Panoche - Energy Investors Fund 06-AFC-5 Operational 400 100/td> Fresno Co. 12/19/07 2/15/08 11/09 7/1/09
40 Pastoria Phase 1, Unit 1, 2 & 3 - Calpine 99-AFC-7C Operational 750 99 Kern Co. 12/20/00 10/3/01 1/03 Unit 1: 5/4/05
Units 2&3: 7/5/05
41 Pastoria Phase 2 Expansion Project - simple cycle addition - Calpine 05-AFC-1C On Hold 160 0 Kern Co. 11/8/06 --   On Hold
42 Ripon Simple Cycle - MID 03-SPPE-1C Operational 95 100 San Joaquin Co. 2/4/04 10/4/04,
Restart
4/1/05
4/05 6/21/06
43 Riverside Energy Resource Center Units 1 & 2 - City of Riverside 04-SPPE-1C Operational 96 100 Riverside Co. 12/15/04 2/23/05 6/05 Unit 1: 6/1/06
Unit 2: 7/26/2006
44 Roseville Combined Cycle - Roseville 03-AFC-1C Operational 160 100 Placer Co. 4/13/05 8/18/05 12/07 11/5/07
45 Russell City - Calpine & GE 01-AFC-7C On Hold 600 0 Alameda Co. 9/11/02
Amendment
10/3/07
9/09 12/04 6/12
46 Salton Sea Geothermal {4} 02-AFC-2C On Hold 215 0 Imperial Co. 12/17/03 -- 1/06 On Hold
47 San Francisco Reliability Project - City of SF 04-AFC-1C On Hold 145 0 San Francisco 10/3/06 9/08 12/08 On Hold
4/10
48 San Joaquin Valley Energy Center - Calpine 01-AFC-22C On Hold 1,087 0 Fresno Co. 1/14/04 On Hold 1/06 On Hold
49 SMUD Cosumnes Combined Cycle Phase 1 - SMUD 01-AFC-19C Operational 500 100 Sacramento Co. 9/9/03 9/17/03 6/05 2/24/06
50 Starwood Midway Firebaugh/Panoche - Starwood Power-Midway LLC 06-AFC-10C Operational 120 100 Fresno Co. 1/16/08 9/23/08-- 6/09 5/5/09
51a Sunrise - Texaco & Edison Mission E. 98-AFC-4C Operational 320 100 Kern Co. 12/6/00 12/7/00 7/01 6/27/01
51b Sunrise Combined Cycle - Texaco & Mission (amendment to application: 98-AFC-4) 98-AFC-4CC Operational 265 100 Kern Co. 11/19/01 12/21/01 6/03 6/1/03
52 Sutter - Calpine 97-AFC-2C Operational 540 100 Sutter Co. 4/14/99 7/1/99 7/01 7/2/01
53 Tesla Combined Cycle - FPL/td> 01-AFC-21C On Hold 1,120 0 Alameda Co. 6/16/04 On Hold On Hold On Hold
54 Tracy Peaker - GWF 01-AFC-16C Operational 169 100 San Joaquin Co. 7/17/02 7/22/02 4/03 6/1/03
55 Walnut Creek Energy Park - Edison Mission Energy 05-AFC-2C On Hold 500 0 Los Angeles Co. 2/27/08 -- -- On Hold
56 Walnut Energy Center - Turlock Irrigation District 02-AFC-4C Operational 250 100 Stanislaus Co 2/18/04 3/15/04 4/06 2/28/06
57 Wildflower Larkspur - Intergen 01-EP-1C Operational 90 100 San Diego Co. 4/4/01 4/5/01 7/01 7/16/01
58 Wildflower Indigo 1,2&3 - Intergen 01-EP-2C Operational 135 100 Riverside Co. 4/4/01 4/5/01 7/01-9/01 7/26-9/10/01
59 Woodland II Combined Cycle - Modesto Irrigation District 01-SPPE-1C Operational 80 100 Stanislaus Co 9/19/01 2/21/02 5/03 6/6/03
60 Valero Cogen. Unit 1 01-AFC-5C Operational 51 100 Solano Co. 10/31/01 11/5/01 6/02 10/18/02
61 Von Raesfeld Power Plant Project (Formerly Pico Power) Combined Cycle - Silicon Valley Power 02-AFC-3C Operational 147 100 Santa Clara Co. 9/9/03 9/10/03 12/04 3/24/2005