  • Notice of Energy Commission Staff Workshop for the AES Huntington Beach Retool Project (00-AFC-13C) to Discuss Staff's Impingement and Entrainment Impacts Analysis and Mitigation Recommendations. Date posted: September 18, 2006


  • Notice of Availability for AES Huntington Beach Retool Project (00-AFC-13C) Huntington Beach Units 3 and 4 Entrainment and Impingement Study and Energy Commission Staff's Huntington Beach Units 3 and 4 Entrainment and Impingement Results and Mitigation Options
    Date online: July 14, 2006


  • July 25, 2006 - Notice of Siting Committee Workshop for the AES Huntington Beach Retool Project (00-AFC-13C) to Discuss the Impingement and Entrainment Study and Staff's Impacts Analysis and Recommendations
    Date online: July 11, 2006


  • Notice of Receipt of Five Year Extension Review
    Date online: March 28, 2006. Includes information request form.
    (PDF file, 3 pgs, 56 kb.)


Some of the files are available as Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

California Energy Commission's Order requiring post-licensing studies. Posted October 4, 2006. (PDF file, 22 pgs, 436 kb).

California Energy Commission's Presentation for the 9/14/06 Business Meeting. Posted September 25, 2006. (PDF file, 38 pgs, 2.41 mb).

AES's Presentation for the 9/14/06 Business Meeting. Posted September 25, 2006. (PDF file, 47 pgs, 3.27 mb).

RE: AES Huntington Beach Retool Project For Units 3 & 4. Posted September 21, 2006. (PDF file, 13 pgs, 352 kb).

Energy Commission Staff's Draft Order Regarding Condition BIO-5. Posted September 13, 2006. (PDF file, 6 pgs, 25 kb).

Minute Order Regarding Compliance with Condition of Certification Bio-5. (PDF file, 1 pg, 28 kb). Posted September 8, 2006.

Entrainment and Impingement Final Staff Analysis, Includes Cover Letter from Donna Stone, Compliance Project Manager.
The full Commission will hear this item at the September 14, 2006 Business Meeting Posted August 31, 2006. (PDF file, 47 pgs, 200 kb).

Staff Analysis of Extension Review Request. Posted August 31, 2006. (PDF file, 3 pgs, 40 kb)

Transcript for the July 25, 2006 Committee Workshop. Posted: August 07, 2006. (PDF file, 118 pgs, 468 kb)

California Energy Commission's Presentation for Siting Committee Workshop of the AES Huntington Beach Retool Project. Huntington Beach Units 3 & 4 Entrainment and Impingement Study Results and Mitigation Options Posted: July 25, 2006. (PDF file, 46 pgs, 2.5 mb)

Presentation for Siting Committee Workshop of the AES Huntington Beach Retool Project. Background, Regulatory Developments Impacting, BIO-5, Determination of Significant Impacts, Restoration Scaling. AES Proposal for Addressing HBGS, BIO-5. Posted: July 25, 2006. (PDF file, 40 pgs, 392 kb)

Staff Analysis - Huntington Beach Units 3 & 4 Entrainment and Impingement Study Results, Mitigation Options, Staff and Working Group Recommendations, and AES's Response and Objections to the Recommendation, by Dr. Noel Davis, Dr. Pete Raimondi, Rick York, and Joanna Reinhardt. Posted: July 14, 2006. (PDF file, 37 pgs, 570 kb)

Tables (PDF file, 115 pgs, 792 kb)

Figures (PDF file, 62 pgs, 3.5 mb - note size! ) - It is recommended for large files that you first download the file to your hard drive by right-clicking on the link, then open in Acrobat.

PLATES (PDF file, 54 pgs, 24 mb) - It is recommended for large files that you first download the file to your hard drive by right-clicking on the link, then open in Acrobat.

AES Huntington Beach Generation Station Surf Zone Water Quality Study - Final Consultant Report, July 2004. Date online: August 11, 2003. (PDF file, 430 pg, 35.9 megabytes - Note file size! Right-click link to download [option-click with Macintosh])

AES Huntington Beach Generating Station Surf Zone Water Quality Study - Final Draft. Date online: August 11, 2003. (PDF file, 221 pg, 852 kb.)

Figures - (PDF file, 58 pgs, 4.5 mb). Please note that it is recommended for large files that you first download the file to your hard drive by right-clicking on the link, then open in Acrobat.

Plates - (PDF file, 53 pgs, 21 mb).

Tables - (PDF file, 113 pgs, 636 kb).