Larkspur Emergency Peaker Amendment Proceeding to Add Unit 3

Docket Number:

01-EP-1C
(Amendment Proceeding)

 

(Files for original proceeding, # 01-EP-1 are on another page.)

 

Committee Overseeing This Case:

John Geesman, Commissioner
Presiding Member

Jeffrey Byron, Commissioner
Associate Member

 

Hearing Officer: Paul Kramer

 

Key Dates

  • April 9, 2007 - Amendment Filed to construct third turbine generator unit (Unit 3)
  • July 16, 2001 - Peaker Plant Operational
  • April 6, 2001 - Commission final decision approving original proceeding 01-EP-1
  • March 14, 2001 - Notice of Receipt of Original "Emergency Peaker" Application

General Description of Amendment

On April 9, 2007, Larkspur 3, LLC, petitioned the Energy Commission for an incremental change to the existing Larkspur Energy Facility 2001 AFC (01-EP-1).

Larskpur 3, LLC is proposing to construct a third combustion turbine generator unit (Unit 3) and associated equipment on the undeveloped eastern portion of the existing Larkspur Energy Facility.

The existing Larkspur Energy Facility is contained within one 3.44-acre (approximate 300-foot by 500-foot) parcel of land. This entire parcel was previously examined in the 2001 AFC. The incremental change to the existing Larkspur Energy Facility, the proposed Larkspur 3 Energy Facility (the Project) is an approximate 0.9-acre (approximate 300-foot by 125-foot) area within this parcel. The Project is located at the southeast corner of Otay Mesa Road and Harvest Road in the Otay Mesa Development District in the incorporated City of San Diego, California.

The Project includes the addition of one General Electric (GE) LM6000-PC Sprint¨ natural gas combustion turbine generator (CTG) to the existing Larkspur Energy Facility which currently contains two CTG units (Unit 1 and Unit 2).

The proposed Unit 3 is a nominal 47 megawatt (MW) natural gas-fired simple-cycle unit that will be located immediately east and adjacent to Units 1 and 2.

In addition, a 600 kW natural gas fired reciprocating engine will be installed to provide black-start capabilities. This will result in increasing the power generation capacity from nominal 94 megawatts (MW) to a combined total of nominal 141 MW.

For Questions About This Siting Case Contact:

Connie Bruins
Compliance Project Manager
Systems Assessment & Facility Siting Division
California Energy Commission
1516 Ninth Street, MS-15
Sacramento, CA 95814
Phone: 916-654-4545
Fax: 916-654-3882
E-mail: CBruins@energy.state.ca.us

For Questions About Participation In Siting Cases Contact:

Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: pao@energy.state.ca.us

News Media Please Contact:

Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.state.ca.us