Los Esteros Critical Energy Facility Power Plant Project - Documents Page
[ California picture montage ]
LOS ESTEROS
CRITICAL ENERGY FACILITY
POWER PLANT PROJECT
DOCUMENTS PAGE

Energy Commission Docket Number: (01-AFC-12)

Page Updated: June 25, 2002

IMPORTANT NOTE: Some of the files are available as Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. WE APOLOGIZE BUT CANNOT MAKE THESE FILES SMALLER. It is better to download these directly to your computer's hard drive instead of opening them using the browser's Acrobat "plug in." To do this, "right-click" on the link to the file using the right button on your mouse (use option-mouse click if on a Macintosh). After the file is downloaded, you can open the file through Acrobat Reader. A 1.0 MB file takes about 2.5 minutes to download on a 56 kbps modem. If you still are having problems with a document, you can request a printed copy or a copy on CD-ROM by calling 916-654-5100. Please have ready the power plant name and the exact title of the document you want.

Commission's Documents Applicant's Documents Intervenors' and Others' Documents



COMMISSION'S DOCUMENTS

PDF Icon Commission Final Decision. Publication # 800-02-005. Date online: July 3, 2002. (Adobe Acrobat PDF file, 447 pages, 4.7 megabytes - Note File Size!.)

PDF Icon Executive Summary of Commission Final Decision. Date online: July 3, 2002. (Adobe Acrobat PDF file, 16 pages, 149 kilobytes.)

PDF Icon Transcript of Public Conference to receive comments on the Presiding Member's Proposed Decision, held June 24, 2002. Date online June 25, 2002. (Adobe Acrobat PDF file, 78 pages, 88 kilobytes.)

PDF Icon Staff Comments on Los Esteros, sent in on June 19, 2002. Date Uploaded: June 20, 2002. (Adobe Acrobat PDF file, 13 pages, 112 kilobytes.)

PDF Icon Presiding Members Proposed Decision -- Includes Appendix A, Laws, Ordinances, Regulations, and Standards. Publication # 800-02-003. Date online: May 31, 2002. (Adobe Acrobat PDF file, 416 pages, 3.2 megabytes.)
PDF Icon Appendix C, Exhibit List.
Date Online June 5, 2002. (Adobe Acrobat PDF file, 7 pages, 20 kilobytes.)

PDF Icon Appendix F, Applicant Table.
Date Online June 5, 2002. (Adobe Acrobat PDF file, 20 pages, 60 kilobytes.)

PDF Icon Transcript of Evidentiary Hearing, held on May 20, 2002. Date Uploaded: May 23, 2002. (Adobe Acrobat PDF file, 298 pages, 405 kilobytes.)

PDF Icon Staff's Supplemental Testimony, addressing 24-hour construction impacts and stormwater outfall. This analysis has been filed in regards to the Hearing to be held May 20, 2002. Date online: May 13, 2002. (Adobe Acrobat PDF file, 24 pages, 225 kilobytes.)

PDF Icon Transcript of Formal Evidentiary Hearing, held on March 11, 2002. Date Uploaded: March 26, 2002. (Adobe Acrobat PDF file, 670 pages, 871 kilobytes.)

PDF Icon Transcript of Prehearing Conference, Date Uploaded: February 27, 2002. (Adobe Acrobat PDF file, 123 pages, 188 kilobytes.)

PDF Icon Supplement to the Staff Assessment, Date Uploaded: February 7, 2002. (Adobe Acrobat PDF file, 189 pages, 2.3 Megabytes.)

PDF Icon Los Esteros Critical Energy Facility Staff Assessment, Date Uploaded: December 31, 2001. (Adobe Acrobat PDF file, 462 pages, 3.6 Megabytes.)

PDF Icon Transcript for the Los Esteros Critical Energy Facility, Date Uploaded: November 13, 2001. (Adobe Acrobat PDF file, 91 pages, 152 kilobytes.)

PDF Icon Los Esteros Critical Energy Facility Project Issue Identification Report, Date Uploaded: October 29, 2001. (Adobe Acrobat PDF file, 11 pages, 100 kilobytes.)

PDF Icon A Letter from Robert Worl, Siting Project Manager to Todd Stewart, LECEF Project Manager, on Los Esteros Critical Energy Facility Power Project (01-AFC-12) Data Requests, Date Uploaded: October 12, 2001. (Adobe Acrobat PDF file, 8 pages, 76 kilobytes.)

PDF Icon A Letter from Robert Worl, Siting Project Manager to Todd Stewart, LECEF Project Manager, on Los Esteros Critical Energy Facility Power Project (00-AFC-12) Data Requests, Date Uploaded: October 10, 2001. (Adobe Acrobat PDF file, 8 pages, 88 kilobytes.)

PDF Icon A Letter from Robert Worl, Siting Project Manager to Todd Stewart, LECEF Project Manager, on Los Esteros Critical Energy Facility Power Project (00-AFC-12) Data Requests, Date Uploaded: October 10, 2001. (Adobe Acrobat PDF file, 34 pages, 140 kilobytes.)

PDF Icon Data Adequacy Recommendation(Revised), Date Uploaded: September 25, 2001. (Adobe Acrobat PDF file, 75 pages, 411 kilobytes.)


APPLICANT'S DOCUMENTS
PDF Icon Supplemental Testimony, Date Uploaded: May 15, 2002.
(Adobe Acrobat PDF Documents)

PDF Icon Application For Certification, Date Uploaded: August 10, 2001.
(Adobe Acrobat PDF Documents)


INTERVENOR'S DOCUMENTS
Files from Intervenors in this proceeding are made available in the original format in which they were created and sent to us (Microsoft Word, PDF file, E-mail text file, etc). They are listed in a directory by date and by the name of the person.

Intervenors' Documents



| Project Main Page | Siting Cases Main Page | Commission Homepage | Site Index | Search Site | Links | Contact Us |