MODESTO IRRIGATION DISTRICT ENERGY FACILITY EXPANSION POWER PLANT PROJECT DOCUMENTS PAGE
Energy Commission Docket Number: (01-SPPE-1)
IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.
IMPORTANT NOTE: Some of the files
are available as Adobe Acrobat Portable Document Format
(PDF) files. To download, navigate and print these files you
will need the free Acrobat Reader software available
from Adobe Systems
Incorporated's Web Site.
Some PDF files are very large. WE APOLOGIZE BUT CANNOT
MAKE THESE FILES SMALLER. It is better to download these
directly to your computer's hard drive instead of opening
them using the browser's Acrobat "plug in." To do this,
"right-click" on the link to the file using the right button
on your mouse (use option-mouse click if on a Macintosh).
After the file is downloaded, you can open the file through
Acrobat Reader. A 1.0 MB file takes about 2.5 minutes to
download on a 56 kbps modem. If you still are having
problems with a document, you can request a printed copy or
a copy on CD-ROM by calling 916-654-5100. Please have ready
the power plant name and the exact title of the document you
want.
MAPS & PICTURES
Figure 2-1, Location map showing water line and sub-transmission line, Date Uploaded: June 11, 2001. (Adobe Acrobat PDF file, 1 page, 172 kilobytes.)
Figure 2-8A, Area map showing location of PG&E Gas Line, Date Uploaded: June 11, 2001. (Adobe Acrobat PDF file, 1 page, 175 kilobytes.)
Figure 2-8B, Site map showing location of PG&E Gas Line, Date Uploaded: June 11, 2001. (Adobe Acrobat PDF file, 1 page, 257 kilobytes.)
COMMISSION'S DOCUMENTS
Commission Decision, Mitigated Negative Declaration & Revised Initial Study, Date Uploaded: September 20, 2001. (Adobe Acrobat PDF file, 255 pages, 4.1 megabytes.)
Committee Proposed Decision. On line August 14, 2001.
Transcripts of an Evidentiary Hearing held on August 13, 2001.
Date On line: August 22, 2001. (Adobe Acrobat PDF file, 18 pages, 24 kilobytes.)
Transcripts of a Prehearing Conference held on August 7, 2001.
Date On line: August 22, 2001. (Adobe Acrobat PDF file, 26 pages, 32 kilobytes.)
Woodland Generation Station 2 (01-SPPE-1)
Modesto Irrigation District Initial Study (Updated Version).
Date Uploaded: July 25, 2001. (Adobe Acrobat PDF file, 256 pages, 756 kilobytes.)
Woodland Generation Station 2 (01-SPPE-1)
Modesto Irrigation District Initial Study.
Date Uploaded: July 6, 2001. (Adobe Acrobat PDF file, 263 pages, 768 kilobytes.)
Woodland Generation Station 2 (01-SPPE-1) Staff Issue Identification
Report.
Date Uploaded: June 19, 2001. (Adobe Acrobat PDF file, 12 pages, 84 kilobytes.)
Woodland Generation Station 2 (01-SPPE-1) Data Request Numbers
49 Through 53.
Date Uploaded: June 19, 2001. (Adobe Acrobat PDF file, 5 pages, 64 kilobytes.)
Protocols for Electronic Proof of Service Pilot Project.
Date Uploaded: June 12, 2001. (Adobe Acrobat PDF file, 4 pages, 17.6 kilobytes.)
|