Palomar Energy Center Project
Compliance Proceeding

Docket Number: 01-AFC-24C


Report on Step-up Transformer Failure and and fire. Posted August 5, 2011.
(PDF File, 11 pages, 462 kb).

Compliance Notices

Compliance Documents

Staff Analysis of Proposed Modification to Amend Air Quality Condition of Certification AQ-SC13. Dated and posted March 4, 2013. (PDF file, 8 pages, 41 kb.)

Petition For Amendment to Upgrade the Advanced Gas Path Technology of the Combustion Turbines, and to Conform Air Quality Conditions of Certification With the Permit Conditions of the Revised Permit to Operate. Dated February 22, 2013. Posted March 1, 2013. (PDF file, 65 pages, 1.7 megabytes.)

Petition for Change in the Hours Allowed for Maintenance and Testing of the Critical Services Generator. Posted January 3, 2013. (PDF file, 12 pages, 111 kb.)

Petition for Change of the Project Description in the Final Decision to Expand the Administrative Building. Posted November 27, 2012 (PDF file, 12 pages, 2.1 megabytes.)

Public Comment by Mark Rodriguez. Posted September 10, 2012 (PDF file, 2 pages, 29 kb.)

Staff Analysis of Proposed Modification to build a new bridge crane. Posted August 22, 2012 (PDF file, 4 pages, 78 kb.)

Petition for Change Building of New Bridge Crane for Combustion Turbine Maintenance. Posted June 5, 2012 (PDF file, 11 pages, 2.8 megabytes.)

Petition for Change of the Project Description in the Final Decision to Build an Elevator for Unit One. Posted March 1, 2012 (PDF file, 14 pages, 645 kb.)

Petition for Change of the Project Description, to Build a New Gantry Crane for Steam Turbine Maintenance. Dated December 29, 2011. Posted January 9, 2012 (PDF file, 11 pages, 1.5 megabytes)

Petition to Amend Project Description in the Final Decision to Expand an Existing Switch Gear Enclosure. Posted December 21, 2011 (PDF file, 10 pages, 458 kb.)

Petition for Change of the Project Description in the Final Decision to Erect and Utilize an Electrical parts Storage Warehouse. Posted August 11, 2011. (PDF file, 14 pages, 1.82 mb.)

Petition for Change of the Project Description in the Final Decision to Expand an Existing Switch Gear Enclosure. Posted August 11, 2011. (PDF file, 13 pages, 1.82 mb.)

Order Approving a Petition to Install and Operate Emergency Engine. Posted December 22, 2010 (PDF file, 4 pages, 57 kb.)

Staff Analysis of Proposed Modifications to Install and Operate Emergency Engine. Revised version posted October 27, 2010 (PDF file, 10 pages, 57 kb.)

Petition for Change of the Project Description In the Final Decision to Install and Operate an Emergency Engine. Posted: June 15, 2010. (PDF file, 24 pages, 660 kb.)

Staff Response to Comments by Bimbo Bakeries Regarding the Petition Filed by the Palomar Energy Center to add a Turbine Air Inlet Chiller. Posted: November 30, 2007. (PDF file, 38 pages, 533 kb.)

Staff Analysis of proposed modification to add Inlet Air Chiller in Place of an Evaporative Chiller System. Posted: October 26, 2007. (PDF file, 19 pages, 280 kb.)

Amendment Petition to Add Inlet Air Chiller in Place of an Evaporative Chiller System.. Posted: July 27, 2007. (PDF file, 16 pages, 7.5 mb)

Amendment Petition to Replace Evaporative Coolers with Inlet Chillers. Plus plot map.. Posted: January 23, 2007. (PDF file, 18 pages, 688 kb) Withdrawn March 13, 2007.

Order Approving a Petition to Allow the Use of Raw Water as a Back-up Supply to Recycled Water. Posted: April 24, 2006. (PDF file, 3 pages, 36 kb)

Order Approving Transfer of Ownership and Operational Control to San Diego Gas and Electric. Posted: April 24, 2006. (PDF file, 1 page, 24 kb)

Final Staff Analysis of Proposed Modification to use Raw Water as a Backup to Recycled Water. Posted: April 13, 2006. (PDF file, 18 pages, 72 kb)

Transcript of April 5, 2006 Siting Committee Workshop. Posted: April 10, 2006. (PDF file, 127 pg, 492 kb)

Preliminary Staff Analysis of Proposed Modification to use Raw Water as a Backup to Recycled Water. Posted: March 30, 2006. (PDF file, 24 pages, 96 kb)

Order Approving a Petition to Correct Noise Level Limits. Posted: March 10, 2006. (PDF file, 3 pages, 44 kb)

Petition For Change Of Ownership And Operational Control. Posted: February 28, 2006. (PDF file, 3 pages, 236 kb)

Palomar Energy Project Petition For Soil And Water Condition Modification. Posted: January 20, 2006. (PDF file, 49 pages, 1.6 mb)

Figure 1 City of Escondido Reclaimed Water Distribution System. (PDF file, 49 pages, 460 kb)

Request for Modification of CEC Condition of Certification NOISE-6. Posted: December 6, 2005. (PDF file, 8 pages, 80 kb)

Change In Project Design, New Brine Return Pipeline Alignment . Posted: November 30, 2004. (PDF file, 7 pages, 640 kb)