Docket # 1-AFC-24C
| COMPLIANCE NOTICES | COMPLIANCE DOCUMENTS |
|
Items are listed by the date of meeting or event, where applicable.
|
Some of the files are available as Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.
Staff Response to Comments by Bimbo Bakeries Regarding the Petition Filed by the Palomar Energy Center to add a Turbine Air Inlet Chiller. Posted: November 30, 2007. (PDF file, 38 pages, 533 kb.)
Staff Analysis of proposed modification to add Inlet Air Chiller in Place of an Evaporative Chiller System. Posted: October 26, 2007. (PDF file, 19 pages, 280 kb.)
Amendment Petition to Add Inlet Air Chiller in Place of an Evaporative Chiller System.. Posted: July 27, 2007. (PDF file, 16 pages, 7.5 mb)
Amendment Petition to Replace Evaporative Coolers with Inlet Chillers. Plus plot map.. Posted: January 23, 2007. (PDF file, 18 pages, 688 kb) Withdrawn March 13, 2007.
Order Approving a Petition to Allow the Use of Raw Water as a Back-up Supply to Recycled Water. Posted: April 24, 2006. (PDF file, 3 pages, 36 kb)
Order Approving Transfer of Ownership and Operational Control to San Diego Gas and Electric. Posted: April 24, 2006. (PDF file, 1 page, 24 kb)
Final Staff Analysis of Proposed Modification to use Raw Water as a Backup to Recycled Water. Posted: April 13, 2006. (Acrobat PDF file, 18 pages, 72 kb)
Transcript of April 5, 2006 Siting Committee Workshop. Posted: April 10, 2006. (Acrobat PDF file, 127 pg, 492 kb)
Preliminary Staff Analysis of Proposed Modification to use Raw Water as a Backup to Recycled Water. Posted: March 30, 2006. (Acrobat PDF file, 24 pages, 96 kb)
Order Approving a Petition to Correct Noise Level Limits. Posted: March 10, 2006. (Acrobat PDF file, 3 pages, 44 kb)
Petition For Change Of Ownership And Operational Control. Posted: February 28, 2006. (Acrobat PDF file, 3 pages, 236 kb)
Palomar Energy Project Petition For Soil And Water Condition Modification. Posted: January 20, 2006. (Acrobat PDF file, 49 pages, 1.6 mb)
Request for Modification of CEC Condition of Certification NOISE-6. Posted: December 6, 2005. (Acrobat PDF file, 8 pages, 80 kb)
Change In Project Design, New Brine Return Pipeline Alignment . Posted: November 30, 2004. (Acrobat PDF file, 7 pages, 640 kb)
|
