Baldwin Energy Facility
Emergency Peaker Project

Docket Number:

01-EP-11 (Application For Certification)


Project Status: Withdrawn, June 21, 2001, by applicant.


APPLICANT: La Jolla Energy Development, Inc.

LOCATION: Angeles County 

SIZE:53 Megawatt Peaking Power Plant



GENERAL DESCRIPTION OF PROJECT

The applicant proposed to construct a 53 megawatt (MW) peaking electric generation facility consisting of two GE-LM-2500 gas turbine engines. The facility was to be configured in a simple cycle mode. The project was called the Baldwin Energy Facility No. 1 and was proposed be located within the Inglewood Oilfield in Los Angeles County.


Energy Commission Facility Certification Process

The California Energy Commission is the lead agency (for licensing thermal power plants 50 megawatts and larger) under the California Environmental Quality Act (CEQA) and has a certified regulatory program under CEQA. Under its certified program, the Energy Commission is exempt from having to prepare an environmental impact report. Its certified program, however, does require environmental analysis of the project, including an analysis of alternatives and mitigation measures to minimize any significant adverse effect the project may have on the environment.



For Questions About This Siting Case Contact:

For Questions About Participation In Siting Cases Contact:

Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PublicAdviser@energy.ca.gov

News Media Please Contact:

Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.ca.gov