Alliance Century -- Emergency Peaker Project
Energy Commission Docket Number: (01-EP-4)

     |   Peakers Home   |   Documents   |   Notices   |   Project Description |



APPLICANT: Alliance Colton LLC
LOCATION: 661 South Cooley Drive, Colton, California
SIZE: 40 Megawatt Peaking Power Plant

Alliance Colton LLC is submitting permit applications to the California Energy Commission (CEC) for two peaking power generation facilities to be constructed in the City of Colton, California. The electrical output of each of the facilities is 40 megawatts. Each project is a distributed generation facility that consists of four, 10-MW simple-cycle, gas turbine generators located within existing City of Colton electrical substations. The Century Project is at the Century substation. The units are almost entirely prepackaged at the factory and shipped to the facility site on skids where minimal field construction is required.

Please note that all notices and information about this project will be done through our e-mail list server. Please sign up for the PEAKER list server at www.energy.ca.gov/listservers/

Energy Commission Contacts
For Questions About This
Siting Case Contact:

Connie Bruins
Compliance Project Manager
1516 Ninth Street, MS-2000
Sacramento, CA 95814
(916) 654-4545
(916) 654-3882 fax
E-mail: Cbruins@energy.state.ca.us

For Questions About
Public Participation
In Siting Cases Contact:


Margret J. Kim
Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California:
1-800-822-6228
E-mail:
PAO@energy.state.ca.us

News Media Please Contact:

Rob Schlichting or
Mary Ann Costamagna
California Energy Commission
Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.ca.gov
Page Updated:
Go to Content | Go to Page Updated Information | Go to Footer