Go to Content | Go to Page Updated Information | Go to Footer
Welcome to the California Energy Commission
Striped Image Section
Alliance Drews Emergency Peaker Project
Energy Commission Docket Number: (01-EP-5)

     |   Peakers Home   |   Documents   |   Notices   |   Project Description |



APPLICANT: Alliance Colton LLC
LOCATION: 559 South Pepper Avenue, Colton, California
SIZE: 40 Megawatt Peaking Power Plant

Alliance Colton LLC is submitting permit applications to the California Energy Commission for two peaking power generation facilities to be constructed in the City of Colton, California. The electrical output of each of the facilities is 40 megawatts. Each project is a distributed generation facility that consists of four, 10-MW simple-cycle, gas turbine generators located within existing City of Colton electrical substations. The Drews Project is at the Drews Substation. The units are almost entirely prepackaged at the factory and shipped to the facility site on skids where minimal field construction is required.

Please note that all notices and information about this project will be done through our e-mail list server. Please sign up for the PEAKER list server at www.energy.ca.gov/listservers/

Energy Commission Contacts
For Questions About This 
Siting Case Contact:

Dale Rundquist
Compliance Project Manager
Siting, Transmission and Environmental Protection Division
California Energy Commission
1516 Ninth Street, MS-2000
Sacramento, CA 95814
Phone: 916-651-2072
E-mail: DRundqui@energy.state.ca.us

For Questions About
Public Participation
In Siting Cases Contact:

Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PublicAdviser@energy.state.ca.us

News Media Please Contact:

Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.state.ca.us

Page Updated:
Go to Content | Go to Page Updated Information | Go to Footer