| Peakers Home | Documents | Notices | Project Description |
APPLICANT: Alliance Colton LLC
LOCATION: 559 South Pepper Avenue, Colton, California
SIZE: 40 Megawatt Peaking Power Plant
Alliance Colton LLC is submitting permit applications to the California Energy Commission for two peaking power generation facilities to be constructed in the City of Colton, California. The electrical output of each of the facilities is 40 megawatts. Each project is a distributed generation facility that consists of four, 10-MW simple-cycle, gas turbine generators located within existing City of Colton electrical substations. The Drews Project is at the Drews Substation. The units are almost entirely prepackaged at the factory and shipped to the facility site on skids where minimal field construction is required.
Please note that all notices and information about this project will be done through our e-mail list server. Please sign up for the PEAKER list server at www.energy.ca.gov/listservers/
| Energy Commission Contacts | ||
| For Questions
About This
Siting Case Contact:
Dale Rundquist |
For Questions
About
Public Participation In Siting Cases Contact:
Public Adviser |
News Media
Please Contact:
Media & Public Communications Office |