Puente Power Project (P3)

Docket Number:

15-AFC-01 (Application For Certification)


Project Status: In Review


Committee Overseeing This Case:

Janea Scott, Commissioner, Presiding Member

Karen Douglas, Commissioner, Associate Member

Hearing Officer: Paul Kramer


WebEx Recordings


Key Dates


La información en español

El 15 de abril de 2015, NRG Oxnard Energy Center, LLC, presentó una Solicitud de Certificación (AFC, por sus siglas en inglés) para construir y operar el proyecto energético Puente Power Project (P3, por sus siglas en inglés) en un terreno vacío de aproximadamente 3 acres, en la actual estación de generación de energía eléctrica Mandalay Generating Station (MGS), situada en 393 North Harbor Boulevard en Oxnard, condado de Ventura.

El proyecto P3 reemplazaría dos unidades generadoras de vapor propulsadas a gas que deben ser actualizadas (Unidades 1 y 2 de la MGS) por un nuevo generador de turbina de combustión, propulsado a gas natural, de ciclo simple, con una potencia nominal de 262 megavatios (MW).

El P3 utilizaría tecnología de enfriamiento en seco, a diferencia del sistema de enfriamiento de paso único que refrigera las Unidades 1 y 2 de la MGS con agua del océano. El solicitante no proponen eliminar los existentes edificios y pila de escape en las Unidades 1 y 2 de la MGS como parte del proyecto.

Si se aprueba, se prevé que la construcción del P3 se extienda a lo largo de un período de 21 meses (desde octubre de 2018 hasta junio de 2020). Se estima que la operación comercial comenzará en junio de 2020.

La Comisión de Energía invita al público a participar, y, en los próximos meses, llevará a cabo una reunión informativa y una visita al emplazamiento, junto con talleres y audiencias locales sobre el proyecto propuesto, en los cuales el público y las agencias tendrán la oportunidad de participar en la revisión del P3. Se puede acceder a una copia de la solicitud de certificación, así como a otra información sobre el proyecto, en el sitio web de la Comisión de Energía, en: http://www.energy.ca.gov/sitingcases/puente/. Para mantenerse informado sobre este proyecto y recibir notificaciones sobre las reuniones y los talleres que se realizarán próximamente, inscríbase en la lista de correo del proyecto, en el sitio web. La lista de correo envía notificaciones por correo electrónico cuando se publican documentos y notificaciones en el sitio web de revisión de proyectos.

Para formular preguntas sobre la participación pública, comuníquese con:
Alana Mathews, Asesora Pública
Teléfono: (916) 654-4489
Número gratuito en California:
1-800-822-6228
Correo electrónico: publicadviser@energy.ca.gov


GENERAL DESCRIPTION OF PROJECT

Puente Power Project viewed from beachThe proposed Puente Power Project (P3) will be sited on approximately 3 acres of the northern portion of the existing 36‑acre Mandalay Generating Station (MGS) property at 393 North Harbor Boulevard in Oxnard, Ventura County, California, 93035. P3 will replace two aging gas-fired steam-generating units (Units 1 and 2) at the existing MGS with a new General Electric (GE) Frame 7HA.01 single-fuel combustion turbine generator (CTG) and associated auxiliaries. P3 will be developed on approximately 3 acres of previously disturbed vacant brownfield land located within the existing boundaries of MGS. If P3 is approved and developed, MGS Units 1 and 2 would be retired by the completion of commissioning of P3.

The power block will provide peaking power and is expected to operate at up to approximately 30 percent capacity factor. Full-load output of the project under expected operating and ambient (temperature/‌relative humidity) conditions will range from approximately 241 net megawatts (MW) to a peak of 271 net MW. The new generating unit will tie into the existing Mandalay Switchyard, owned by Southern California Edison (SCE), using one of the breaker positions that will be vacated when MGS Units 1 and 2 are removed from service. The applicant does not propose removing the existing MGS Units1 and 2 buildings and exhaust stack as part of the project.


Energy Commission Facility Certification Process

The California Energy Commission is the lead agency (for licensing thermal power plants 50 megawatts and larger) under the California Environmental Quality Act (CEQA) and has a certified regulatory program under CEQA. Under its certified program, the Energy Commission is exempt from having to prepare an environmental impact report. Its certified program, however, does require environmental analysis of the project, including an analysis of alternatives and mitigation measures to minimize any significant adverse effect the project may have on the environment.



For Questions About This Siting Case Contact:

Shawn Pittard
Project Manager
Siting, Transmission and Environmental Protection (STEP) Division
California Energy Commission
1516 Ninth Street, MS-15
Sacramento, CA 95814
Phone: 916-654-4026
E-mail: Shawn.Pittard@energy.ca.gov

For Questions About Participation In Siting Cases Contact:

Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PublicAdviser@energy.ca.gov

News Media Please Contact:

Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.ca.gov

Original Proceeding

Calendar

Subscribe

Puente Power List Serve
Automated Email Notifications



You will receive an email requesting that you confirm your subscription.