Quail Brush Power Plant Licensing Case
Docket Number:
11-AFC-03 (Application For Certification)
Project Status: Suspended
Committee Overseeing This Case:
Karen Douglas, Commissioner, Presiding Member
Andrew McAllister, Commissioner, Associate Member
Hearing Officer: Raoul Renaud
Key Dates
- 8/29/2011 - Application for Certification (AFC) filed
- 11/16/2011 - Commission accepts AFC as "data adequate."
- 4/8/2013 - Applicant Requests Twelve-Month Suspension of the AFC
GENERAL DESCRIPTION OF PROJECT
The proposed Quail Brush Generation Project (Project) is a nominal 100-megawatt (MW) intermediate/peaking load electrical generating facility. It would consist of a set of eleven (11) natural gas-fired reciprocating Wartsila engine generators. The proposed project has a long-term Power Purchase Tolling Agreement (PPA) with SDG&E as a result of a 2009 Request for Offers (RFO). The Project would support SDG&E's efforts to increase reliance on wind, solar and other renewable energy resources. It would also provide peaking and load-shaping power to the grid, along with several ancillary services intended to assure system reliability within the SDG&E service area.
The Project is proposed to be located in the City of San Diego, California, west of the City of Santee, south of the Sycamore Landfill and north of State Route 52. The portion of the Project where the power plant (plant) is proposed to be constructed is approximately 11 acres and is located within a 21.6- acre privately owned parcel optioned by Development Land Holdings, LLC. The Project company Quail Brush Genco, LLC (Applicant), and Development Land Holdings are wholly owned subsidiaries of Cogentrix Energy, LLC. Additional Project components located beyond the plant site would include a 230 kilovolt (kV) generation tie-line (gen tie), utility switchyard, and natural gas pipeline lateral.
Energy Commission Facility Certification Process
The California Energy Commission is the lead agency (for licensing thermal power plants 50 megawatts and larger) under the California Environmental Quality Act (CEQA) and has a certified regulatory program under CEQA. Under its certified program, the Energy Commission is exempt from having to prepare an environmental impact report. Its certified program, however, does require environmental analysis of the project, including an analysis of alternatives and mitigation measures to minimize any significant adverse effect the project may have on the environment.
For Questions About This Siting Case Contact:
For Questions About Participation In Siting Cases Contact:
Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PublicAdviser@energy.ca.gov
News Media Please Contact:
Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.ca.gov
Proceeding Information
- Submit e-Comment
- Submit e-Filing
- Documents for this Proceeding
(Docket Log) - Exhibit List
- Proof of Service List
- Proof of Service Declaration Form MS Word or PDF
- Search Documents in this Proceeding
- Search All Power Plant Documents
- Legacy Notices Page
(No Longer Updated) - Legacy Documents Page
(No Longer Updated)
Calendar

Subscribe
Quail Brush Listserv
Automated E-Mail Notifications


