Welcome to the California Energy Commission


IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Rice Solar Energy Project Power Plant Licensing Case
Documents Page

Docket Number: 09-AFC-10

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.


Click on heading to go to that section below.

 
 

Commission's Documents

Commission Decision. Posted: December 22, 2010. (PDF file, 779 pages, 13.4 megabytes)

Errata to the Presiding Member's Proposed Decision. Posted: December 15, 2010. (PDF file, 63 pages, 274 kb)

Transcript of the December 3, 2010 Committee Conference. Posted: December 10, 2010. (PDF file, 100 pages, 160 kb)

Energy Commission Staff Opposition to Applicant's Motion to Strike and Motion to Shorten Time. Dated and posted: December 2, 2010. (PDF file, 5 pages, 49 kb)

Staff Comments on Presiding Member's Proposed Decision. Dated and posted: November 30, 2010. (PDF file, 103 pages, 2.6 megabytes)

Presiding Member's Proposed Decision - Errata is addedd on 12/152010. Posted: November 12, 2010. (PDF file, 833 pages, 14.6 megabytes)

Letter to the Librarian Regarding Document Handling of the Staff Assessment / Draft Environmental Impact Statement. Posted: November 5, 2010. (PDF file, 3 pages, 52.5 kb)

Transcript of the October 29, 2010, Prehearing Conference and Evidentiary Hearing. Posted: November 3, 2010. (PDF file, 232 pages, 430 kb)

Identification of Staff's Rebuttal Testimony. Posted: October 28, 2010. (PDF file, 96 pages, 1.1 mb)

Identification of Staff's Opening Testimony. Posted: October 28, 2010. (PDF file, 154 pages, 19.5 mb)

Staff's Prehearing Conference Statement. Posted: October 28, 2010. (PDF file, 8 pages, 206 kb)

Staff Assessment and Draft Environmental Impact Statement (SA/DEIS). Posted: October 11, 2010. (PDF file, 1,538 pages, 44.6 megabytes)
For large files, right-click the link and download to your computer. Then open the file in Acrobat.

Transcript of the September 29, 2010 Mandatory Status Conference. Posted: October 6, 2010. (PDF file, 27 pages, 49 kb)

Staff's Comments on MDAQMD Preliminary Determination of Compliance . Posted: July 6, 2010. (PDF file, 4 pages, 98 kb)

Staff's Recommended Schedule. Posted: June 7, 2010. (PDF file, 5 pages, 57 kb)

Transcript of the January 25, 2010, Information Hearing. Posted: February 22, 2010. (PDF file, 74 pages, 156 kb)

Transcript of the Common Matter of the Informational hearing. Posted: February 2, 2010. (PDF file, 27 pages, 70.5 kb)

Data Requests Set 1 (#'s 1 - 168). Posted: February 16, 2010. (PDF file, 69 pages, 847 kb)

Staff's Issues Identification Report - Posted: January 21, 2010. (PDF file, 13 pages, 392 kb)

Staff's Data Adequacy Recommendation - Posted: November 25, 2009. (PDF file, 81 pages, 404 kb)


Public Advisor Documents


Applicant's Documents

Applicant's Motion to Strike and Motion to Shorten Time. Dated December 1, 2010. Posted: December 2, 2010. (PDF file, 6 pages, 185 kb)

Applicant's Supplemental Rebuttal Testimony: Worker Safety & Fire Protection. Dated: November 3, 2010. Posted: December 2, 2010. (PDF file, 21 pages, 319 kb)

Support Letters for the Rice Solar Energy Project. Dated: October 29, 2010. Posted: December 2, 2010. (PDF file, 16 pages, 4.4 megabytes)

Rice Solar Energy, LLC's Rebuttal Testimony. Dated: October 27, 2010. Posted: December 2, 2010. (PDF file, 17 pages, 1.1 megabytes)

Rice Solar Energy, LLC's Revised Fire Needs Assessment. Dated: October 25, 2010. Posted: December 2, 2010. (PDF file, 90 pages, 2.7 megabytes)

Rice Solar Energy, LLC's Opening Testimony (Part 2). Dated: October 22, 2010. Posted: December 2, 2010. (PDF file, 86 pages, 1.1 megabytes)

Rice Solar Energy, LLC's Opening Testimony (Part 1). Dated: October 18, 2010. Posted: December 2, 2010. (PDF file, 108 pages, 1.3 megabytes)

Supplementary Information Item #9, Biological Resources Mitigation Acreage Table and Map. Dated: October 13, 2010. Posted: December 2, 2010. (PDF file, 7 pages, 573 kb)

Fall 2010 Supplemental Botanical Inventory Report dated 10/12/10. Posted: December 2, 2010. (PDF file, 117 pages, 3.6 megabytes)

Rice Solar Energy, LLC's Fire Needs Assessment. Dated: October 1, 2010. Posted: December 2, 2010 (PDF file, 80 pages, 2.5 megabytes)

Supplementary Information Item #8, Biological Resources Vegetation and Wash Channel Acreages. Dated: August 23, 2010. Posted: November 30, 2010 (PDF file, 7 pages, 221 kb)

Golden Eagle Survey Report for Rice Solar Energy Project (RSEP) Riverside County, CA. Dated: July 27, 2010. Posted: November 30, 2010 (PDF file, 15 pages, 5.7 MB)

Supplementary Information Items #7-11, Additional Information Regarding the Archaeological Features at Rice Army Airfield. Dated: July 16, 2010. Posted: November 30, 2010 (PDF file, 40 pages, 21.2 MB)

Supplemental Information Item 2 (Materials for Air Quality and Public Health). Dated: June 17, 2010. Posted: June 25, 2010 (PDF file, 43 pages, 18.2 MB)

Supplementary Informational Item 1 (Hazardous Materials List). Dated: June 16, 2010. Posted: June 25, 2010 (PDF file, 71 pages, 463 kb)

Applicant's Letter Re: Federal Aviation Administration Process. Dated: June 15, 2010. Posted: June 25, 2010 (PDF file, 5 pages, 123 kb)

Response to CEC Staff Workshop Query 13. Dated: June 14, 2010. Posted: June 25, 2010 (PDF file, 15 pages, 176 kb)

Email from the US Army Corps of Engineers to the U.S. Environmental Protection Agency documenting non-jurisdictional status of RSEP dated 5.27.10. Dated: June 9, 2010. Posted: June 25, 2010 (PDF file, 5 pages, 176 kb)

Applicant's Scheduling Statement. Dated: June 7, 2010. Posted: June 25, 2010 (PDF file, 115 pages, 238 kb)

Application for Authority to Construct - Rice Solar Energy Project Wet Surface Air Cooler. Dated: May 7, 2010. Posted: June 25, 2010 (PDF file, 7 pages, 238 kb)

Interim Report on Avian Point Count and Burrowing Owl Phase 2 Surveys. Dated: May 14, 2010. Posted: June 25, 2010 (PDF file, 9 pages, 528 kb)

Mojave Fringe-toed Lizard Habitat Assessment. Dated: May 14, 2010. Posted: June 25, 2010 (PDF file, 20 pages, 3.5 MB)

Applicant's Response to CEC Workshop Request 46. Dated: May 5, 2010. Posted: June 25, 2010 (PDF file, 122 pages, 12.1 MB)

Applicant's Response to CEC Workshop Request 61. Dated: May 5, 2010. Posted: June 25, 2010 (PDF file, 32 pages, 2.9 MB)

Applicant's Response to CEC Workshop Query 12. Dated: April 29, 2010. Posted: June 25, 2010 (PDF file, 11 pages, 2.8 MB)

Applicant's Response to CEC Biological Resources Data Requests 49-51, 54, 56, 58, and 75 and to Soil and Water Resources Data Request 121. Dated: April 27, 2010. Posted: June 25, 2010 (PDF file, 282 pages, 44.1 MB)

Rice Solar Energy, LLC's Issue Statement For The May 4, 2010 Status Conference. Dated: April 27, 2010. Posted: June 25, 2010 (PDF file, 5 pages, 102 kb)

Riverside County Planning Department Consistency Letter. Dated: April 27, 2010. Posted: June 25, 2010 (PDF file, 5 pages, 201 kb)

Application for Authority to Construct & Permit to Operate. Dated: April 21, 2010. Posted: June 25, 2010 (PDF file, 5 pages, 266 kb)

Applicant's Response to CEC Workshop Queries 1-3. Dated: April 16, 2010. Posted: June 25, 2010 (PDF file, 11 pages, 406 kb)

Applicant's Response to CEC Workshop Queries 9 and 10. Dated: April 7, 2010. Posted: June 25, 2010 (PDF file, 16 pages, 586 kb)

Applicant's Draft Biological Assessment in Response to CEC Staff Data Requests 45, 47, and 48. Dated: March 29, 2010. Posted: June 25, 2010 (PDF file, 84 pages, 8.7 MB)

Applicant's responses to CEC Staff Workshop Queries 4, 6 to 8 & 11 Posted: April 13, 2010 (PDF file, 43 pages, 2.9 MB)

Applicant's responses to Staff Data Requests 130, 139 -141, and 143 -144 Posted: March 17, 2010 (PDF file, 45 pages, 1.3 MB)

Applicant's Response to Energy Commission Staff Data Requests 1 to 168, Dated March 8, 2010. Posted: March 10, 2010 (PDF file, 370 pages, 21.3 MB)

Applicant's Data Adequacy Supplement Posted: November 23, 2009 (PDF file, 62 pages, 1.4 MB)

Application For Certification, Filed 10/21/2009 - Posted: October 22, 2009. (PDF files)


Intervenors' and Others' Documents

Comment Letter from Philip Clinton of Palo Verde College. Dated: November 2, 2010. Posted: December 8, 2010. (PDF file, 5 pages, 244 kb)

MDAQMD FDPC Changes. Dated: October 29, 2010. Posted: December 2, 2010. (PDF file, 2 pages, 1.3 megabytes)

Comment Letter from Riverside County Supervisor John J. Benoit, Fourth District. Dated: October 28, 2010. Posted: December 8, 2010. (PDF file, 2 pages, 1.1 megabytes)

Western Area Power Administration Email regarding the status of the Interconnection Facilities Study. Dated: October 28, 2010. Posted: December 8, 2010. (PDF file, 2 pages, 78 kb)

Federal NOA of SA-DEIS. Docket date: October 27, 2010. Posted: December 2, 2010. (PDF file, 2 pages, 57 kb)

Riverside County Fire Department Review of Fire Needs Assessment. Dated October 27, 2010. Posted: December 2, 2010. (PDF file, 5 pages, 233 kb)

Riverside County Review for LORS Compliance. Dated August 31, 2010. Posted: December 2, 2010. (PDF file, 105 pages, 5.4 megabytes)

Riverside County Fire Department Comments on Proposed Rice Solar Project. Dated August 4, 2010. Posted: November 30, 2010. (PDF file, 3 pages, 2.4 megabytes)

Mojave Desert Air Quality Management District Final Decision/Determination. Dated July 30, 2010. Posted: November 30, 2010. (PDF file, 47 pages, 4 megabytes)

Riverside County Fire Department Comments on Proposed Rice Solar Project. Dated July 28, 2010. Posted: November 30, 2010. (PDF file, 3 pages, 2.2 megabytes)

Letter from Western Area Power Administration to the California Office of Historic Preservation regarding Plans to Construct the 150 Megawatt Rice Solar Energy Project (RSEP) Riverside County, CA . Dated July 23, 2010. Posted: November 30, 2010. (PDF file, 14 pages, 909 kb)

Email from the US Army Corps of Engineers to the U.S. Environmental Protection Agency documenting non-jurisdictional status of RSEP. Dated June 9, 2010. Posted: November 30, 2010. (PDF file, 5 pages, 176 kb)

Letter from Riverside County Fire Department to Geoff Lesh. Dated May 4, 2010. Posted: June 28, 2010. (PDF file, 3 pages, 2.7 MB)

Scoping Comments of United States Environmental Protection Agency. Dated April 28, 2010. Posted: June 28, 2010. (PDF file, 17 pages, 1 MB)

Scoping Comments of Consumer Energy Alliance. Dated April 27, 2010. Posted: June 28, 2010. (PDF file, 2 pages, 98 kb)

Mojave Desert AQMD Preliminary Decision-Determination of Compliance - Posted: June 16, 2010. (PDF file, 45 pages, 1.3 MB)

Notice of Intent to Prepare an Environmental Impact Statement / Staff Assessment. Posted: April 5, 2010 (PDF file, 5 pages, 95.6 kb)

Scoping Comments from the United State Department of the Interior - Fish and Wildlife Service - Posted: April 28, 2010. (PDF file, 5 pages, 940 kb)


Figures and Maps

None at this time.