Project Proceeding
Public Participation
- Public Adviser's Office
- Power Plant Siting Proceedings FAQs
- Power Plant Siting or Licensing Process
- Six Phases of the Power Plant Siting Process
- Public Participation in the Siting Process: Practice and Procedure Guide (PDF File, 3.3 mb)
- Summary of Typical Public Involvement Opportunities in Energy Commission Siting Cases
- Public Adviser's Presentations and Printed Materials
- Commission Siting Division
- Title 20
Calif. Code of Regulations - Acronyms and Definitions Used in Siting Cases
- Energy Commission News Releases
Docket Number: 08-SPPE-1
Riverside Energy Resource Center Power Plant Licensing Case
Documents Page
Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.
Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.
Commission's Documents
Filing of Notice of Decision in compliance with Public Resources Code. Posted: March 27, 2009. (PDF file, 5 pages, 252 kb)
Commission Final Decision on Small Power Plant Exemption and Mitigated Negative Declaration, adopted at Energy Commission business meeting 2/25/09. Posted: February 27, 2009. (PDF file, 12 pages, 436 kb)
Proposed Small Power Plant Exemption Decision and Notice of Intent to Adopt a Mitigated Negative Declaration - Publication # CEC-800-2009-002-PMPD. Posted: January 28, 2008. (PDF file, 12 pages, 536 kb)
Transcript of the January 5, 2009, Evidentiary Hearing. Posted: January 13, 2009. (PDF file, 16 pages, 95 kb)
Final Initial Study of the Riverside Energy Resource Center Power Plant Project (08-SPPE-1), Staff Report, publication # CEC-700-2008-010-SF. Posted: December 22, 2008. (PDF file, 302 pages, 7.2 megabytes)
Draft Initial Study of the Riverside Energy Resource Center Power Plant Project (08-SPPE-1), Staff Report, publication # CEC-700-2008-010-SD. Posted: November 12, 2008. (PDF file, 354 pages, 5.6 megabytes)
Committee Response to Briefs on Eligiblity for SPPE Consideration. Posted: June 5, 2008. (PDF file, 2 pages, 23 kb)
Transcript of May 12, 2008 Informational Hearing and Site Visit. Posted: May 22, 2008. (PDF file, 69 pages, 288 kb)
Issues Identification Report . Posted: May 8, 2008. (PDF file, 12 pages, 136 kb)
Data Requests 1 To 71 (Set #1) . Posted: May 6, 2008. (PDF file, 24 pages, 260 kb)
Applicant's Documents
Data Responses Set 1 (1 - 71) and Attachments. Posted: June 10, 2008. (PDF files)
Application for a Small Power Plant Exemption. Posted: March 21, 2008. (PDF file, 888 pages, Please note file size: 43 megabytes)
Intervenors' and Others' Documents
FAA Determination of No Hazard to Air Navigation. Posted: May 20, 2008. (PDF file, 15 pages, 3.3MB)
Figures and Maps
None at this time.
