Stanton Reliability Energy Center

Docket Number:

16-AFC-01 (Application For Certification)


Project Status: In Review


Committee Overseeing This Case:

Janea A. Scott, Commissioner, Presiding Member

Karen Douglas, Commissioner, Associate Member

Hearing Officer: Kenneth Celli


Key Dates


GENERAL DESCRIPTION OF PROJECT

The facility, the Stanton Energy Reliability Center (SERC), will consist of two General Electric (GE) LM6000-based EGTs. EGT refers to the LM6000 PC Hybrid EGT jointly developed by General Electric International, Inc. (GE) and Wellhead Power Solutions. The EGT combines a combustion gas turbine with an integrated battery storage component operated by a proprietary software system.

The two GE LM6000 PC units will be natural gas-fired, simple-cycle combustion turbine, a clutch to provide operational flexibility as a synchronous condenser, and an integrated 10-megawatt (MW) GE Battery Energy Storage System. In total, SERC is proposing to provide 98 MW (nominal) of EGT capacity.

SERC will provide needed generation for local reliability in Southern California Edison (SCE) West Los Angeles Basin Subarea and was selected by SEC as part of SCE’s 2013 Local Capacity Requirements Request for Offers sanctioned by the California Public Utility Commission (CPUC) to address specific need.


Energy Commission Facility Certification Process

The California Energy Commission is the lead agency (for licensing thermal power plants 50 megawatts and larger) under the California Environmental Quality Act (CEQA) and has a certified regulatory program under CEQA. Under its certified program, the Energy Commission is exempt from having to prepare an environmental impact report. Its certified program, however, does require environmental analysis of the project, including an analysis of alternatives and mitigation measures to minimize any significant adverse effect the project may have on the environment.



For Questions About This Siting Case Contact:

John Heiser
Project Manager
Siting, Transmission and Environmental Protection (STEP) Division
California Energy Commission
1516 Ninth Street, MS-15
Sacramento, CA 95814
Phone: 916-653-8236
E-mail: John.Heiser@energy.ca.gov

For Questions About Participation In Siting Cases Contact:

Public Adviser
California Energy Commission
1516 Ninth Street, MS-12 Sacramento, CA 95814
Phone: 916-654-4489
Toll-Free in California: 1-800-822-6228
E-mail: PublicAdviser@energy.ca.gov

News Media Please Contact:

Media & Public Communications Office
Phone: 916-654-4989
E-mail: mediaoffice@energy.ca.gov

Original Proceeding

Calendar

Subscribe

Stanton Energy Reliability Center
List Serve
Automated Email Notifications



You will receive an email requesting that you confirm your subscription.