Sunrise and Power Project
Energy Commission Docket Numbers: 98-AFC-4
California Energy Commission Power Plant Siting Case
Page Updated: July 20, 2001
Documents In This Siting Case
IMPORTANT NOTE: Some of the files are available as Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.
Some of our files are very large. WE CANNOT MAKE THESE FILES SMALLER. It is better to download these directly to your computer's hard drive instead of opening them using the browser's Acrobat "plug in." To do this, "right-click" on the link to the file using the right button on your mouse (use option-mouse click if on a Macintosh). This will bring up a dialogue box asking you where you'd like to save the file. After the file is downloaded, you can open the file through Acrobat Reader. A 1.0 MB file takes about 2.5 minutes to download on a 56 kbps modem. If you still are having problems with a document, you can request a printed copy or a copy on CD-ROM by calling 916-654-5100. Please have ready the power plant name and the exact title of the document you want.
July 17, 2001 -- Sunrise Power Project (98-AFC-4C) Approval of Project Change: Wastewater Recycling Disposal Option Revised Condition of Certification GEO-3. (Adobe Acrobat PDF file, 1 page, 12 kilobytes) Placed online July 20, 2001.
June 15, 2001 -- Petition for Simple-Cycle Recycle Wastewater Pipeline (June 15, 2001) Geologic Hazards and Resources Staff Analysis. (Adobe Acrobat PDF file, 2 pages, 8 kilobytes) Placed online July 20, 2001.
December 2000 -- COMMISSION Decision on the Sunrise Power Plant Project. (Adobe Acrobat PDF file, 327 pages, 644 kilobytes) Placed online Febuary 8, 2001.
December 4, 2000 -- Transcript of Committee Conference (20 pages, 23 kilobytes)
December 6 2000 -- Committee Amendments to the REVISED Presiding Member's Proposed Decision. Placed on line December 6, 2000. (Adobe Acrobat PDF file, 24 pages, 107 kilobytes)
November 20, 2000 -- REVISED Presiding Member's Proposed Decision. (Adobe Acrobat PDF file, 394 pages, 1.6 megabytes)
November 7, 2000 -- Transcript of Hearing held in Sacramento, California. (127 pages, 144 kilobytes)
October 30, 2000 -- Prehearing Conference Transcript. (Adobe Acrobat PDF file, 42 pages, 52 kilobytes) Placed online November 8, 2000.
October 26, 2000 -- Supplement to Final Staff Assessment (FSA) for the Sunrise Power Project. (121 pages, 408 kilobytes)
October 10, 2000 -- Transcript of Hearing held in Sacramento, California. (32 pages, 40 kilobytes)
June 6, 2000 -- Transcript of Hearing held in Sacramento, California. (108 pages, 126 kilobytes)
May 12, 2000 -- Presiding Member's Proposed Decision. (Adobe Acrobat PDF file, 359 pages, 1.3 megabytes)
April 26, 2000 -- Final Staff Assessment (FSA), Part III. (149 pages, 928 kilobytes)
January 28, 2000 -- Transcript of Hearing held in Sacramento, California. (218 pages, 251 kilobytes)
January 13, 2000 -- Transcript of Evidentiary Hearing held in Sacramento, California. (327 pages, 381 kilobytes)
January 11, 2000 -- Transcript of Evidentiary Hearing held in Sacramento, California. (298 pages, 345 kilobytes)
January 10, 2000 -- Transcript of Evidentiary Hearing held in Sacramento, California. (316 pages, 367 kilobytes)
December 3, 1999 -- Transcript of Hearing held in Sacramento, California. (196 pages, 371 kilobytes)
December 2, 1999 -- Transcript of Hearing held in Sacramento, California. (123 pages, 234 kilobytes)
November 5, 1999 -- Transcript of Hearing held in Sacramento, California. (142 pages, 178 kilobytes)
October 14, 1999 -- Transcript of Hearing held in Sacramento, California. (149 pages, 298 kilobytes)
October 12, 1999 -- Transcript of Hearing held in Sacramento, California. (174 pages, 322 kilobytes)
October 14, 1999 -- Final Staff Assessment, Part II contains the Energy Commission staff's evaluation of Worker Safety and Fire Protection, Socioeconomics, Traffic and Transportation, and Transmission System Engineering for the Sunrise and Power Project. (77 pages, 210 kilobytes)
October 1, 1999 -- Final Staff Assessment of the Sunrise Project (381 pages, 800 kilobytes)
September 1, 1999 -- Transcript of Prehearing Conference. (72 pages, 172 kilobytes)
August 12, 1999 -- Transcript of Hearing on Motion to Compel. (63 pages, 184 kilobytes)
August 1999 -- Map showing regional area surround proposed power plant. (1 page, 1.0 MEGAbytes)
August 1999 -- Map showing local area surrounding proposed power plant. (1 page, 446 kilobytes)
August 2, 1999 -- Preliminary Staff Assessment. (484 pages, 1,000 kilobytes)
July 20, 1999 -- Staff Status Report #4.
May 26, 1999 -- Staff Status Report #2. (8 pages, 41 kilobytes)
May 25, 1999 -- Transcript of Evidentiary Hearing. (71 pages, 41 kilobytes)
May 18, 1999 -- Summary of May 11, 1999, data response workshop. (15 pages, 49 kilobytes)
May 18, 1999 -- Summary of April 22, 1999, data response workshop. (11 pages, 28 kilobytes)
May 10, 1999 -- Data Requests (10 pages, 31 kilobytes)
April 21, 1999 -- Staff Status Report #1. (1 pages, 6 kilobytes)
March 18, 1999 Transcript of Information Hearing held at Pittsburg City Hall. (53 pages, 81 kilobytes)
March 8, 1999 -- Staff Issue Identification Report -- (10 pages, 29 kilobytes).
March 1, 1999 -- Letter from staff on Data Request -- to Mr. Paul Dinkel, Texaco Global Gas and Power, about the Sunrise and Power Project. (25 pages, 71 kilobytes).
January 15, 1999 -- Executive Director Recommendation on Data Adequacy -- for the Sunrise and Power Project. (144 pages, 520 kilobytes).
Go to Sunrise Project Main Page.
| Homepage | Commission Info | Site Index | Search Site | Links |
E-mail us about our Web Site at: energia@energy.ca.gov
"Energia" means ENERGY in Greek and Latin.
Energy used to create this page was produced by California's electricity providers...
the most diverse in the world.