[ California picture montage ]
Sutter Power Project
California Energy Commission Power Plant Siting Case
Energy Commission Docket Numbers: 97-AFC-2 (Application For Certification)
97-SIT-2 (Notice of Intention Exemption)

Documents Filed In This Case



IMPORTANT NOTE: Some of the files are available as Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some of our files are very large. WE CANNOT MAKE THESE FILES SMALLER. It is better to download these directly to your computer's hard drive instead of opening them using the browser's Acrobat "plug in." To do this, "right-click" on the link to the file using the right button on your mouse (use option-mouse click if on a Macintosh). This will bring up a dialogue box asking you where you'd like to save the file. After the file is downloaded, you can open the file through Acrobat Reader. A 1.0 MB file takes about 2.5 minutes to download on a 56 kbps modem. If you still are having problems with a document, you can request a printed copy or a copy on CD-ROM by calling 916-654-5100. Please have ready the power plant name and the exact title of the document you want.

Date shown is date item was released or posted on Web site.



July 17, 2001 -- Approval of Construction and Operation of 700 Foot Natural Gas Pipeline Connection Between Sutter Energy Center and Greenleaf 1 Facility (97-AFC-2C). Placed on line: July 17, 2001, 2 pages, 13 kilobytes.



October 26, 2000 -- Draft Staff Analysis on Amendment to Sutter Power Project. Placed on line: October 26, 2000, 7 pages, 41 kilobytes.



FINAL Energy Commission Decision approving the Sutter Power Plant Project. April 14, 1999, 377 pages, 640 kilobytes. Publication # P800-99-010.



Revised Table 5 from Presiding Members Proposed Decision
(April 7, 1999. Adobe Acrobat PDF file, 1 page, 7 kilobytes)


Transcript of March 10, 1999, evidentiary hearing (placed on line April 1, 1999, 122 pages, 198 kilobytes).



REVISED Presiding Member's Proposed Decision (March 1999, 304 pages, 650 kilobytes).



Transcript of February 11, 1999 hearing in Yuba City on Presiding Member's Proposed Decision (placed on line March 3, 1999, 78 pages, 120 kilobytes).



Presiding Member's Proposed Decision (January 20, 1999) Along with Notice of public hearing set for February 11, 1999. -- Notice of Availability, Commission Order and PDF version of Decision.



Executive Summary of Presiding Member's Proposed Decision (January 20, 1999).



Transcript of December 1, 1998, evidentiary hearing in Yuba City. (72 pages, 95 kilobytes)



November 17, 1998 -- Updated Air quality section of Final Staff Assessment (50 pages, 170 kilobytes)



Transcript of November 16, 1998 (evening session), evidentiary hearing in Yuba City. (72 pages, 95 kilobytes)



Transcript of November 16, 1998 (morning session), evidentiary hearing in Yuba City. (233 pages, 353 kilobytes)



Transcript of November 10, 1998 (evening session), evidentiary hearing in Yuba City. (42 pages, 76 kilobytes)



Transcript of November 10, 1998 (morning session), evidentiary hearing in Yuba City. (195 pages, 206 kilobytes)



Transcript of November 2, 1998 (evening session), evidentiary hearing in Yuba City. (91 pages, 117 kilobytes)



Transcript of November 2, 1998 (morning session), evidentiary hearing in Yuba City. (196 pages, 255 kilobytes)



November 7, 1998 -- Photos/graphics from Final Staff Assessment placed on line. Note: Photos are available on line in two size and can be downloaded as Adobe Acrobat PDF or PhotoShop 4.0 files. (17 figures from FSA)



October 22, 1998 -- Final Staff Assessment, Sutter Power Project
(Updated 11/17/98, replacing Air Quality section. 633 pages, 2.1 kilobytes)
Note: Some figures in this document are not available in electronic file format.



September 2, 1998 -- Letter from Paul Richins to Mr. Curt Hildebrand and Ms. Charlene Wardlow of Calpine regarding discussion of potential significant environmental impacts.



August 19, 1998 -- Transcript of August 19 Prehearing Conference in Yuba City. (131 pages, 191 kilobytes)



July 13, 1998 -- Transcript of July 13 Committee Status Conference in Yuba City. (162 pages, 200 kilobytes)



Note: Some figures in this document are not available in electronic format.
July 2, 1998 -- Preliminary Staff Assessment, Sutter Power Project - July 1998 - 97-AFC-2. (549 pages, 1,627 kilobytes).



June 26, 1998 -- Memo from Paul Richins to Energy Facility Siting Committee regarding June 3, 1998, Sutter Power Project Status Report.



May 18, 1998 -- Memo from Paul Richins to Energy Facility Siting Committee regarding May 14, 1998, Sutter Power Project Status Report.



April 9, 1998 -- Memo from Paul Richins to Energy Facility Siting Committee regarding April 15, 1998 Sutter Power Project Status Report



April 6, 1998 -- Letter from Paul Richins to CALPINE regarding data requests made at March 25 and 31 workshops.



March 3, 1998 -- Transcript of Information Hearing and NEPA Scoping Meeting, held at Veterans Memorial Community Building, Yuba City. (96 pages, 200 kilobytes).



February 2, 1998 -- Sutter Power Project data requests, (25 pages, 63 kilobytes).



February 11, 1998 -- Sutter Power Project Issue Identification Report, (14 pages, 47 kilobytes).



January 14, 1998 -- Memo from Energy Commission Executive Director Stephen Rhoads to Commissioners on Recommendation on Data Adequacy of applicant's filing before the Commission.


October 16, 1997 -- Summary Of The September 25, 1997, Sutter Power Project Prefiling Meeting -- Data Adequacy Discussion of Various Draft AFC Sections. (14 pages, 45 kilobytes).



Go to Sutter Power Main Page.