Facilities Siting Division
Power Plant Siting
- Main Licensing Page
- List of all projects
- Status of all Projects
- Renewable Energy Facilities
- CEC/BLM Solar MOU
- BLM/DOE Solar PEIS
- Database of California Power Plants
- Energy Facility Maps
- Distributed Generation
- AB 1632 Nuclear Assessment
- Siting Data Adequacy Forms
Power Plant Compliance
Information For Developers
Information For Public
Environmental Protection
- Environmental Programs
- Once-Through Cooling
- Avian Guidelines for Wind Project Development
- Greenhouse Gasses
Engineering and Transmission
- Transmission Line Initiatives and Programs
- Strategic Transmission Investment Plan (PDF file)
- SB 1059 Transmission Corridors Designation
- 2005 EPAct Section 368 Federal Energy Corridors
- Renewable Energy Transmission Initiative (RETI)
Special Projects
Siting Division Reports & Publications
Energy Facilities Compliance Monitoring
Projects On-Line Before 1999
Projects that have been certified by the Energy Commission are monitored throughout construction, operation and closure to ensure that the owners comply with all conditions of certification. Additional post-certification compliance activities include processing amendments for changes to projects, handling complaints and processing requests to close projects.
For more information about the Energy Commission's Compliance Monitoring Program, please contact the Commission's Siting Division at:
California Energy Commission
Systems Assessment and Facilities Siting Division
Compliance Program Manager
1516 Ninth Street, MS-2000
Sacramento, CA 95814
Phone (916) 654-4079
Pre-1999 Power Plant Compliance Documents and Notices
For projects that have come on line since 1999, see that project's individual website section at: www.energy.ca.gov/sitingcases/alphabetical.html
Note: Bottle Rock (79-AFC-4C) has been moved to its own separate page.
2008 Items
Geysers Power Company (81-AFC-1C) - Notice of Decision on Amendment to Change Condition of Certification, Biological Resources 5-4, to Allow Suspension of Boron Monitoring. Posted: July 18, 2008. (PDF file, 1 page, 56 kb).
Geysers Power Company (81-AFC-1C) - Notice Of Receipt Of Petition To Amend The Energy Commission Decision To Modify Biological Resources Condition Of Certification Bio 5-4 Regarding Boron Drift Monitoring, And Public Review Of The Staff Analysis. Posted: May 23, 2008.
Geysers Power Company (81-AFC-1C) - Petition Amendment to Modify biological Certification. (PDF file, 24 pages, 1.96 mb)(The company has asked that we withdraw the original petition to amend and replace it with this new one). Posted: May 5, 2008.
High Desert Power Project (97-AFC-1C) - California Energy Commission Staff Analysis Petition of Proposed Modification of Air Quality Conditions Relating to Source Test Intervals and Other Administrative Changes. Posted: April 9, 2008. (PDF file, 7 pages, 97.4 kb).
Kern River Cogeneration Company (82-AFC-2) - Notice of Receipt of Petition to Amend - Air Quality. (Acrobat PDF file). Posted: March 13, 2008.
Kern River Cogeneration Company (82-AFC-2) - Staff Analysis of Petition to Amend - Upgrade Emission Controls. (Acrobat PDF file). Updated: March 26, 2008.
Sycamore Cogeneration Company (84-AFC-6) - Notice of Receipt of Petition to Amend - Air Quality. (Acrobat PDF file). Posted: March 13, 2008.
Sycamore Cogeneration Company (84-AFC-6) - Staff Analysis of Petition to Amend - Upgrade Emission Controls. (Acrobat PDF file). Updated: March 27, 2008.
Procter & Gamble (93-AFC-2C). - Staff Analysis of Proposed Upgrade of Three Gas Combustion Turbines. (PDF file. 21 pgs. 496 kb) Posted: February 29, 2008.
Procter & Gamble (93-AFC-2C). - Notice of Receipt of Petition to Upgrade Three Gas Combustion Turbines. (PDF file. 3 pgs. 114 kb) Posted: February 29, 2008.
Sycamore Cogeneration Company (84-AFC-6) - Petition to Amend - Water Supply. (Acrobat PDF file. 6 pgs. 107 kb). Posted: January 4, 2008.
Sycamore Cogeneration Company (84-AFC-6) - CEC notice of receipt of Petition to Amend. (Acrobat PDF file. 2 pgs. 32 kb). Posted: January 4, 2008.
2007 Items
Procter & Gamble (93-AFC-2C). - Petition for Post Certification Modification to Construct LM6000 Turbine Upgrades. (PDF file. 90 pgs. 1.99 mb, Note File Size) Posted: December 11, 2007.
Order Approving a Petition to Increase Ammonia Slip (85-AFC-3C). - The Midway Sunset Cogeneration Company (MSCC), request to modify the facility by increasing the amount of unreacted ammonia into the stack emissions has been approved. (PDF file. 2 pgs. 20 KB) Posted: November 1, 2007.
SMUD Cogeneration Project (92-AFC-2P) - Approval of Insignificant Project Change to Relocate a 3,200 Foot Section of the SMUD Cogeneration Pipeline. (PDF file. 1 pgs. 28 KB) Posted: September 14, 2007.
Kern River Cogeneration Company (82-AFC-2) - Petition to Amend - Air Quality. (Acrobat PDF file). Posted: September 11, 2007.
Sycamore Cogeneration Company (84-AFC-6) - Petition to Amend - Air Quality. (Acrobat PDF file). Posted: September 11, 2007.
SMUD Cogeneration Project (92-AFC-2P) - Notice of Insignificant Project Change to Relocate a 3,200 Foot Section of the SMUD Cogeneration Pipeline. Posted: August 23, 2007.
SMUD Cogeneration Project (92-AFC-2P) - Petition for Insignificant Project Modification - Natural Gas pipeline Relocation. (PDF file. 71 pgs. 8.4 mb, Note File Size). Posted: August 23, 2007.
Midway Sunset Cogeneration Project (85-AFC-3C) - Staff Analysis of Request to Increase Ammonia Slip. (PDF file. 5 pgs. 117.3 kb). Posted: August 10, 2007.
Midway Sunset Cogeneration Project (85-AFC-3C) - Notice of Receipt of Amendment Petition to Increase Ammonia Slip. (PDF file. 3 pgs. 68.2 kb). Posted: August 10, 2007.
Midway Sunset Cogeneration Project (85-AFC-3C) - Amendment Petition to Increase Ammonia Slip. (Acrobat PDF files). Posted: July 11, 2007.
Richmond Cogeneration Facility (86-SPPE-1) - Order Granting Chevron's Petition to Remove Limitation on Sales of Excess Power. Posted: June 15, 2007. (PDF file, 3 pages, 76 kb).
Richmond Cogeneration Facility (86-SPPE-1) - PG&E's Non-Opposition to Chevron's Petition to Remove Limitation on Sales of Excess Power. Posted: May 25, 2007. (PDF file, 1 pages, 205 kb).
Richmond Cogeneration Facility (86-SPPE-1) - Notice of Receipt - Petition to Remove Limits on Surplus Electric Generation. Posted: May 10, 2007. (PDF file, 3 pages, 36.9 kb).
Richmond Cogeneration Facility (86-SPPE-1) - Staffs Response to Petition and Supplemental petition to Modify Small Power Plant Exemption to Remove Limitation on Sales of Excess Power. Posted: May 8, 2007. (PDF file, 8 pages, 231 kb).
Richmond Cogeneration Facility (86-SPPE-1) - Petition to Modify Small Power Plant Exemption to Remove Limitation on Sales of Excess Power. Posted: May 8, 2007. (PDF file, 12 pages, 84 kb).
Supplement to Petition - To Modify Small Power Plant Exemption to Remove Limitation on Sales of Excess Power. Posted: May 8, 2007. (PDF file, 22 pages, 548 kb).
2006 Items
Bottle Rock Geothermal Power Plant (79-AFC-4C) - Order Approving the Change of Ownership, The restart of Operation After Suspension, and 11 Facility Design Changes. (PDF file, 48 pages, 212 kb). Dated: December 13, 2006. Posted: May 20, 2008.
Midway Sunset Cogeneration Project (85-AFC-3C) - Staff Analysis of Proposed Modifications to Install a New Evolution Compressor Rotor in the Unit A Turbine. Posted: September 13, 2006. (PDF file, 10 pages, 84 kb).
Midway Sunset Cogeneration Project (85-AFC-3C) - Notice Of Receipt Petition To Amend The Energy Commission Decision. Posted: August 24, 2006.
Midway Sunset Cogeneration Project (85-AFC-3C) - Post Certification Amendment to Install an Evolution Rotor in Unit A. Posted: August 4, 2006. (PDF file, 63 pages, 19.7 mb).
Sycamore Cogeneration Project (84-AFC-6C) - Notice of Insignificant Project Change to Allow Either Simple Cycle or Cogeneration Operation of Units 2 and 3. Posted: July 12, 2006. (PDF file, 2 pages, 32 kb).
Sycamore Cogeneration Project (84-AFC-6C) - RE: Petition for Insignificant Amendment. Posted: July 12, 2006. (PDF file, 151 pages, 23.8 mb).
Kern River Cogen, (82-AFC-2C) - Notice of Insignificant Project Change to Allow The Replacement of The Dry Low Nox Combustors in Units 2 and 4 With Enhanced Dry Low Nox Combustors (DLN1+). Posted: July 7, 2006. (PDF file, 2 pages, 30 kb).
Kern River Cogen, (82-AFC-2C) - Petition for Insignificant Air Quality Amendment. Dated June 22, 2006. Posted: July 7, 2006. (PDF file, 66 pages, 5.5 mb).
High Desert Power Project, LLC (97-AFC-1C) - Comments on Staff Analysis to Amend Condition of Certification S&W-4. Dated June 26, 2006, 2006. (PDF file, 27 pages, 400 kb).
High Desert Power Project, LLC (97-AFC-1C) - Addendum 2 to Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision. Posted: April 4, 2006. (PDF file, 27 pages, 400 kb).
High Desert Power Project, LLC (97-AFC-1C) - Addendum 1 to Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision. Posted: April 4, 2006. (PDF file, 37 pages, 1.46 mb).
Kern River Cogen, (82-AFC-2C) - Notice of Insignificant project change to allow Either Simple Cycle or Cogeneration Operation. Dated: February 03, 2006. Posted: February 03, 2006. (PDF file, 2 pages, 28 kb).
Kern River Cogen, (82-AFC-2C) - Petition to Allow Units 1 & 2 to Operate in Either Cogen or Simple Cycle mode. Dated: December 16, 2005. Posted: January 23, 2005. (PDF file, 176 pages, 22.3 mb).
2005 Items
Calpine King City Cogen - Order No. 05-0713-01(c) Order Approving Modifications to Air Emission Monitoring Requirements. Dated: July 15, 2005. Posted: December 28, 2005. (PDF file, 3 pages, 36 kb).
Calpine Gilroy Cogen - Order No. 05-0713-01(b) Order Approving Modifications to change the source of power plant cooling water to recycled wastewater. Dated: July 15, 2005. Posted: December 28, 2005. (PDF file, 3 pages, 36 kb).
Luz Solar Partners Ltd., VIII and IX's SEG IX Project - Order No. 05-1103-02 - Order Approving a Petition to Amend Biological Resources Condition BIO-11.k Posted: December 15, 2005. (PDF file, 2 pages, 92 kb).
High Desert Power Project, LLC (97-AFC-1C) Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision. Dated September 30, 2005. Posted: October 13, 2005. (PDF file, 10 pages, 304 kb).
Segs IX Project (89-AFC-1C) - Notice of Receipt to Modify Condition of Certification BIO-11.k. Staff's Analysis for Public Review. Posted: October 13, 2005. (PDF file, 7 pages, 252 kb).
Solar Electric Generating Station (SEGS) VIII and IX Projects - Petition for change in Condition of Certification Marsh Restoration Conditions BIO-11.k. Posted: September 7, 2005. (PDF file, 21 page, 560 kb).
Calpine King City Cogen Project (85-AFC-5C) - Staff Analysis of Modifications to Air Emission Monitoring Requirements. Posted: June 21, 2005. (PDF file, 6 page, 144 kb).
Calpine Gilroy Cogen Project (84-AFC-4C) - Staff Analysis of Proposed Modifications to Change the Source of Cooling Water from Well Water to Recycled Water . Posted: June 21, 2005. (PDF file, 12 page, 164 kb).
Bottle Rock Power Plant (79-AFC-4C) - Order Approving an Extension of the Environmental Monitoring Program During Suspended Operations. Posted: June 8, 2005. (PDF file, 10 page, 90 kb).
Kern River Cogeneration Project (82-AFC-2C) - Notice of Significant Project Change - Addition of Above-Ground Natural Gas Pipeline. Posted: June 6, 2005. (PDF file, 2 page, 84 kb).
Kern River Cogeneration Company (82-AFC-2C) - RE: Installation of Gas Pipeline for Simple Cycle Units. Posted: June 6, 2005. (PDF file, 10 page, 100kb).
Calpine King City Cogen (85-AFC-5C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted: May 11, 2005. (PDF file, 3 page, 24 kb).
Calpine King City Cogen (85-AFC-5C) - RE: Petition to Amend Commission Decision Conditions of Certification. Posted: May 11, 2005. (PDF file, 7 page, 210 kb).
Calpine Gilroy Cogen Project (84-AFC-4C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted: May 11, 2005. (PDF file, 3 page, 24 kb).
Calpine Gilroy Cogen Project (84-AFC-4C) - Amendment No 1, Recycled Water for Cooling Purposes. Posted: May 11, 2005. (PDF file, 19 page, 560 kb).
Bottle Rock Geothermal Power Plant (79-AFC-4C) - post-certification Compliance Proceedings. Posted: April 14, 2005. (PDF file, 12 page, 264kb).
Luz Solar Partners III, IV, V, VI & VIIs, SEGS III-VII PROJECT - Order No. 05-0216-01(d) ORDER APPROVING Transfer of operational control to FPL Energy Operating Services, Inc. Posted: March 18, 2005.
Solar Electric Generating Facilities (SEGS III - VII) (87-AFC-1C) - Operator Change - Information Request Form. Posted: January 28, 2005. (PDF file, 1 page, 88 kb).
Solar Electric Generating Facilities (SEGS III - VII) (87-AFC-1C) - Notice of Receipt: Request for Change of Operator, dated January 28, 2005. Posted: January 28, 2005. (PDF file, 1 page, 92 kb).
Solar Electric Generating Facilities (SEGS III - VII) (87-AFC-1) - Request for Change of Operator, dated January 5, 2005. Posted: January 27, 2005. (PDF file, 1 page, 44 kb).
Bottle Rock Power Plant (79-AFC-4C) - Notice of Receipt - Petition to Amend the Energy Commission Decision for the Bottle Rock Geothermal Power Project (79-Afc-4C) Extension Of Environmental Monitoring Program For Suspended Operations. Posted: January 26, 2005. (PDF file, 3 pages, 140 kb).
Bottle Rock Power Plant (79-AFC-4C) - Petition for Extending Environmental Monitoring Program Posted: January 26, 2005. (PDF file, 26 pages, 108 kb).
2004 Items
Sycamore Cogeneration Project (84-AFC-6C) - Order Approving Operation in Either Cogeneration or Simple Cycle Mode, and Extending the License to Operate. Posted: December 27, 2004. (PDF file, 5 pages, 32 kb).
Sycamore Cogeneration Project (84-AFC-6C) - Staff Analysis of Proposed Modifications to Allow Either Cogen or Simple-Cycle Operations and Extending the License to Operate. Posted: November 02, 2004. (PDF file, 11 pages, 184 kb).
Sycamore Cogeneration Project (84-AFC-6C) - Petition for Minor Amendment. Posted: October 22, 2004. (PDF file, 221 pages, 13 mb). NOTE: Some browsers may have difficulty displaying a file of this size. It is best to first download large files directly to your hard drive by right-clicking on the above link, then open in Acrobat.
Sycamore Cogeneration Project (84-AFC-6C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted: August 26, 2004.
Information Request Form. Date On-line - August 26, 2004. (PDF file, 1 pages, 7 kb).
Kern River Cogen Project (82-AFC-2C) Post-Certification Compliance Proceeding - Order Approving a Petition to Allow for Either Cogen or Simple-Cycle Operation. Posted: April 26, 2004. (PDF file, 5 pages, 30 kb).
Kern River Cogen Project (82-AFC-2C) Post-Certification Compliance Proceeding - Public Review of Staff Analysis of Proposed Modification to allow either Cogen or Simple Cycle Operations. Posted: March 08, 2004. (PDF file, 14 pages, 58 kb).
Geysers Units 3, 16, 17, 18, 19, and 20 Geothermal Power Plants - Notice of Insignificant Project Change to Allow for Use of Reclaimed Wastewater. Posted: February 20, 2004.
Kern River Cogeneration Project Power Plant (82-AFC-2C) - Petition for Minor Air Quality Amendment to Commission Decision on the Kern River Cogeneration Project Power Plant. Date On-Line - January 20, 2004. (PDF file, 197 pages, 15.5 mb - Note file size!)
2003 Items
Kern River Cogeneration Project Power Plant (82-AFC-2C) - NOTICE OF RECEIPT. Petition to Amend The Energy Commission Decision. Date On-Line - December 30, 2003.
Information Request Form. Date On-line - December 30, 2003. (PDF file, 1 pages, 92 kb).
Redding Peaking Power Plant (92-SPPE-2C) - Staff Analysis of Proposed Modification to Allow for an Increase in Operating Hours. Date on line - December 19, 2003. (PDF file, 16 pages, 91 kb).
Redding Peaking Power Plant (92-SPPE-2) - Notice of Receipt of Petition to Amend the Energy Commission Decision. Date on line - December 2, 2003.
Information Request Form. (PDF file, 1 pages, 40 kb)
Redding Peaking Power Plant (92-SPPE-2) - Request for a Post Certification Amendment. This post certification amendment is requested to make permanent the California Energy Commission (Commission) May 17, 2001 "Approval of Request to Remove Energy Production Restrictions". Date on line - November 25, 2003. (PDF file, 9 pages, 36 kb).
Bottle Rock Geothermal Power Plant (79-AFC-4C) - Notice Of Receipt - Request for Ownership Change. Date on line - October 29, 2003.
Information Request Form (PDF file, 1 pages, 40 kb)
