This map was developed to help prospective applicants to NEVI funding opportunities and other interested parties identify eligible areas for EV charging infrastructure deployment. The map displays the highway corridors along which EV charging infrastructure will be installed under the NEVI program. The corridors are compiled into “corridor segments” and “corridor groups,” which are defined in California’s NEVI solicitations. This map includes other supporting information to assist in site evaluations. Users can click on layers in the menu to the right of the map to additionally display the following information:

  • Disadvantaged or low-income communities designated by both California and Justice40
  • Disadvantaged or low-income communities designated by California
  • Disadvantaged communities designated by Justice40
  • Federally recognized tribal lands
  • Metropolitan planning organizations
  • Regional transportation planning agencies
  • California State Assembly districts
  • California State Senate districts
  • Counties
  • Caltrans districts
  • Electric load serving entities (IOU & POU)
  • Congressional Districts
  • DC fast charging stations that meet NEVI power-level and port count requirements and are within one mile of a corridor off-ramp (as of March 2024)
  • DC fast charging stations that do not meet NEVI power-level or port count requirements but are within one mile of a corridor off-ramp (as of March 2024)

Viewers can display corridor groups, corridor segments, electric vehicle (EV) charging stations, Justice40 disadvantaged communities, Tribal lands, California-designated low-income or disadvantaged communities, metropolitan planning organizations, regional transportation planning agencies, California state legislative districts, counties, Caltrans districts, utility districts, and congressional districts in this interactive map. The map initially displays corridor groups and their corridor segments included in the Round 2 NEVI solicitation. Viewers can toggle individual layers on and off using the map layers menu located to the right of the map. Some layers are organized into groups; viewers can toggle all layers within a group or select specific ones. The legend to the left of the map will show the layers that have been turned on. There is a search tool to the right of the map that enables viewers to type in an address and locate the address on the map. A basemap selector allows viewers to view road detail. Additional information on the map can be found under the information icon. Viewers can download the map files by clicking on the Data and Supplemental Links icon. 

Map layers include:

  • A Corridor groups layer that shows designated corridor groups for California's NEVI funding program. Users can click on a corridor segment to view the start and end of each segment within a corridor group. When selected, a pop-up window will appear that identifies the corridor group number, corridor segment, corridor name, minimum number of charging stations required, minimum number of ports required, and needed locations, if applicable, for the corridor segment.
  • Corridor group labels for enhanced accessibility. Note that labels are only visible at certain ranges (zoom in and out to view labels).
  • A NEVI 2 corridors layer shows corridor groups eligible for Round 2 of California's NEVI funding program.
  • NEVI 2 corridor group labels for enhanced accessibility. Note that labels are only visible at certain ranges (zoom in and out to view labels).
  • NEVI 2 corridor segment labels for enhanced accessibility. Note that labels are only visible at certain ranges (zoom in and out to view labels).
  • A Round 1 solicitation corridor groups layer that shows corridor groups eligible for Round 1 of California's NEVI funding program.
  • EV charging stations layers (existing DC fast charging stations that are located within one mile of a NEVI-eligible corridor offramp). One layer shows locations of EV charging stations with DC fast charging capabilities that meet the NEVI power level and four-port minimum requirement and could likely become part of the NEVI network if these stations became compliant with other NEVI program requirements such as data reporting. The other layer shows DC fast charging stations that do not meet NEVI power-level or port count requirements but could be upgraded to be NEVI-compliant. Users can click on EV charging stations and a pop-up window will appear with more information on the station (i.e., station address, total port count, minimum NEVI standard, etc.). These data were last updated in March 2024. Please refer to the Department of Energy's Alternative Fuels Data Center and PlugShare for up-to-date existing and planned DC fast charger site information.
  • A layer showing California and Justice40 disadvantaged or low-income communities.
  • A layer showing California-designated disadvantaged or low-income communities.
  • A layer showing Justice40-designated disadvantaged communities.
  • A layer showing California Federally Recognized Tribal Lands.
  • A layer showing Metropolitan Planning Organizations.
  • A layer showing Regional Transportation Planning Agencies.
  • A layer showing California State Senate Districts.
  • A layer showing California State Assembly Districts.
  • A layer showing California Counties.
  • A layer showing Caltrans Districts.
  • A layer showing Electric Utilities (IOUs and POUs).
  • A layer showing California Congressional Districts.

Alternative Fuel Corridor - The U.S. Federal Highway Administration (FHWA) designates a national network of plug-in electric vehicle (EV) charging and hydrogen, propane, and natural gas fueling infrastructure along national highway system corridors. To designate these Alternative Fuel Corridors (AFC), FHWA solicits nominations from state and local officials and works with other federal officials and industry stakeholders.

California-designated Disadvantaged Communities - The California Environmental Protectional Agency (CalEPA) identifies four types of geographic areas as disadvantaged: (1) census tracts receiving the highest 25 percent of overall scores in CalEnviroScreen 4.0; (2) census tracts lacking overall scores in CalEnviroScreen 4.0 due to data gaps, but receiving the highest 5 percent of CalEnviroScreen 4.0 cumulative pollution burden scores; (3) census tracts identified in the 2017 DAC designation as disadvantaged, regardless of their scores in CalEnviroScreen 4.0; (4) and areas under the control of federally recognized Tribes.

California-designated Low-income Communities - Census tracts with median household incomes at or below 80 percent of the statewide median income or with median household incomes at or below the threshold designated as low income by the California Department of Housing and Community Development’s list of state income limits adopted under Health and Safety Code Section 50093.

Chargers – Manufactured units that safely deliver electricity to charge the battery of a plug-in electric vehicle. A charger may have one or multiple connectors. Often referred to as electric vehicle supply equipment.

Charging Station - A physical address where one or more chargers are available for use. A charging station can be public, shared private, or private.

Corridor Group - A group of one or more corridor segments.

Corridor Segment - A portion of a highway corridor.

DC Fast Chargers - Chargers that use direct current (DC) electricity at 480 volts to recharge an all-battery electric vehicle to 80 percent capacity in about 30 minutes, though the time required depends on the size of the vehicle battery and the power level of the charger.

Justice40-designated Disadvantaged Communities - Consistent with the Justice40 Interim Guidance, U.S. Department of Transportation (DOT) and U.S. Department of Energy (DOE) developed a joint interim definition of disadvantaged communities for the National Electric Vehicle Infrastructure (NEVI) Formula Program. The joint interim definition uses publicly available data sets that capture vulnerable populations, health, transportation access and burden, energy burden, fossil dependence, resilience, and environmental and climate hazards.

Minimum Charging Stations Required - The minimum number of charging stations a corridor segment must have to be eligible for NEVI funding through California’s NEVI program solicitations.

Minimum Ports Required - The minimum number of new ports a corridor segment must have to be eligible for NEVI funding through California’s NEVI program solicitations.

Needed Locations - Locations required along a corridor segment, if applicable.

Solicitation - Grant Funding Opportunity, which refers to the solicitation document and all its attachments and exhibits.

GIS Shapefile Downloads:

Available on the California Energy Commission GIS Open Data Site (NEVI Category)

Supplemental Links:

Map last updated: October 2024. Subsequent updates will precede NEVI solicitation windows. 

Data sources: Data are from the U.S. Federal Highway Administration’s Alternative Fuel Corridors website, the U.S. Department of Energy's Alternative Fuels Data Center Station Data for Alternative Fuel Corridors (as of March 2024), Argonne National Laboratory's Electric Vehicle Charging Justice40 Map (May 2022), and the California Air Resources Board’s Map of California Climate Investments Priority Populations 2022 CES 4.0 (May 2022).

Citing: California Energy Commission (October 2024). California’s National Electric Vehicle Infrastructure (NEVI) Funding Program Map. Data last updated, October 2024. 

Contact

Please submit questions and comments to: mediaoffice@energy.ca.gov.​