This final project report documents the planning, fueling station equipment, specifications, and initial throughput from the installation of a new compressed natural gas fueling system at the Las Gallinas Valley Sanitary District made possible through the California Energy Commission grant ARV-15-038. This report also provides analysis of the six months operational data collected at the station.
The project results show that the installation of the compressed natural gas stations provides a critical support to the Las Gallinas Valley Sanitary District’s efforts in phasing out diesel operated trucks and providing a steady supply of compressed natural gas as back-up to the Renewable Natural Gas system at the Waste Water Treatment Plant. The project also supports the Las Gallinas Valley Sanitary District’s compressed natural gas fleet.