Convenient access to alternative fuel and electric charging stations is essential for the statewide adoption of alternative fuel vehicles, especially in Southern California. A network of electric chargers is needed to fill the void that exists in statewide electric charging infrastructure. Lack of attention to electric vehicle technology in this area of the state had been reflected in the limited adoption of this alternative fuel.
Ontario CNG Station, Inc. brought public access electric vehicle charging equipment to their gas station located at 1850 East Holt Boulevard, Ontario (San Bernardino County). It is reliably serving the public in an ideal location on the approach to Ontario International Airport; adjacent to I-10; and near I-15, SR-60 and I-210, and critically positioned between San Bernardino and Las Vegas.
Designed from the inception by Atabak Youssefzadeh (Architect) of Ontario CNG Station, Inc. and Keith Sharpe (Engineer) of Allsup Corporation, a fast charger and a Level 2 charger are conveniently situated in front of the station. The locations of the chargers were carefully designed to serve the electric vehicle clients safely and close to the station entrance.
Alternative fuels such as electricity not only provide a cleaner, safer, and healthier environment for us and our children, but at the same time decrease our dependence on foreign fossil fuels as well.