Project Owner
Levy Alameda, LLC
Docket Number
24-OPT-04
Capacity
400-megawatt (MW)
Location
Alameda County
Technology
Battery Storage System
Project Status
Under Review
Project Type
Opt-in
Project Description

Levy Alameda, LLC (Applicant), a wholly owned subsidiary of Obra Maestra Renewables, LLC, proposes to construct, operate, and decommission the 400-megawatt (MW) Potentia-Viridi Battery Energy Storage System (project) on approximately 85 acres in eastern Alameda County with an expected online date of June 2028. The primary components of the project include an up to 3,200-megawatt-hour (MWh) battery energy storage system (BESS) facility, an operations and maintenance (O&M) building, a project substation, a 500-kilovolt (kV) overhead intertie transmission (gen-tie) line, and interconnection facilities within the Pacific Gas and Electric Company (PG&E) owned and operated Tesla Substation. 

The project would draw electricity from the power grid to charge and store electrical energy and discharge back to the power grid when the stored energy is needed. The project would provide several benefits to the power grid, including reducing the need to operate natural gas power plants to balance intermittent renewable generation and serving as an additional capacity resource that would enhance grid reliability. The project would be remotely operated and monitored year-round and be available to receive or deliver energy 24 hours a day and 365 days a year. 

Opt-In Certification

Prior to the June 30, 2022, signing of Assembly Bill (AB) 205, the CEC’s powerplant licensing jurisdiction was limited to thermal powerplants 50 megawatts (MW) or larger. To accelerate the state’s transition to renewable energy and to maintain electrical system reliability under this transition and during extreme climate-change-driven events, AB 205, as modified by AB 209 expands the types of facilities that can be certified by the CEC. This “Opt-in” certification process is available to solar photovoltaic and terrestrial wind energy powerplants of 50 MW or more, energy storage facilities of 200 megawatt-hours (MWh) or more, the electric transmission lines from these facilities to the first point of interconnection, and facilities that manufacture or assemble clean energy or storage technologies or their components with a capital investment of at least $250 million. In addition, thermal powerplants of 50 MW or more that do not use fossil or nuclear fuels may choose the Opt-in process rather than the CEC’s Application for Certification process. AB 205 authorizes the CEC to accept applications for these facilities and provides a new, streamlined process for their review and a decision by the CEC. The CEC is the “lead agency” under the California Environmental Quality Act and is required to prepare an environmental impact report for any facility that elects to opt-in to the CEC’s jurisdiction. With exceptions, the issuance of a certificate by the CEC for an eligible facility is in lieu of any permit, certificate, or similar document required by any state, local, or regional agency, or federal agency to the extent permitted by federal law, and supersedes any applicable statute, ordinance, or regulation of any state, local, or regional agency, or federal agency to the extent permitted by federal law. The CEC’s authority under the opt-in certification program does not supersede the authority of the California State Lands Commission to require leases and receive lease revenues, if applicable, or the authority of the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the State Water Resources Control Board or applicable regional water quality control board, or, in the case of manufacturing facilities, the applicable local air quality management district or the Department of Toxic Substances Control.

Contacts

Project Manager

Ann Crisp
STEPsiting@energy.ca.gov
(Please enter project name in the email subject line)
(916) 352-0543

Public Participation Questions

Public Advisor
publicadvisor@energy.ca.gov
916-269-9595

Media Inquiries

Media & Public Communications Office
mediaoffice@energy.ca.gov
916-654-4989

Subscribe Potentia-Viridi Battery Energy Storage System

Automated Email Notifications