Project Owner
NextEra™ Energy Resources LLC
Docket Number
09-AFC-08C
Capacity
250 MW
Location
Riverside County
Technology
Solar Thermal
Project Status
Operational (Solar Thermal)
Project Type
Application for Certification
Project Description

The Genesis Solar Energy Project (GSEP) is located on approximately 1,800 acres at 11995 Wiley’s Well Road, about 25 miles west of the city of Blythe, Riverside County, California. GSEP is in an undeveloped area of the Sonoran Desert on lands managed by the Bureau of Land Management. It is surrounded by the McCoy Mountains to the east, the Palen Mountains (including the Palen/McCoy Wilderness Area) to the north, and Ford Dry Lake, a dry lakebed, to the south. California Intersate-10 is located to the south of the project facility. The project area is otherwise undisturbed, although the area has been used in the past for grazing, for off-highway vehicle recreation, and for military training prior to WW II. GSEP was certified by the CEC in September 2010 and began commercial operation in November 2013.

GSEP consists of two independent solar thermal electric generating facilities (Units 1 and 2) with a nominal net electrical output of 125-megawatts (MW) each, for a total net electrical output of 250 MW. Electrical power is produced using steam turbine generators fed from solar steam generators. The steam generators receive heated transfer fluid from thermal equipment comprised of arrays of parabolic mirrors that collect solar energy.

The project uses air cooled condensers, a dry cooling mechanism for power plant cooling. Process water for ancillary uses, including mirror washing, is supplied from on-site groundwater wells. Project cooling water blowdown is piped to lined, on-site evaporation ponds. The interconnection is an approximately 7-mile, 230 kilovolts transmission line from the GSEP to the new (as of 2014) Southern California Edison Colorado River Sub-Station, located to the southeast across Interstate 10 approximately 7 miles from the project.

The GSEP was developed by and continues to be operated by Genesis Solar LLC, a Delaware limited liability company and wholly owned subsidiary of NextEra™ Energy Resources LLC.

  • Storage of Gas Cylinders in Common Area 
    Staff Approval 
    TN 213690 
    09/16/2016 
  • Storage of Spare GSU Transformer on Site 
    Staff Approval 
    TN 210226 
    02/08/2016 
  • Rerouted Gen-tie Line, Rerouted Natural Gas Line, and New Dedicated Substation 
    Commission Approval 
    Order No. 12-0809-05 
    TN 66682 
    08/15/2012 

Attention: You will need to look up the transaction number (TN) in the Compliance Docket Log.  Non-hypertext items in the docket indicate that no electronic or hard copy is available or the item was filed confidentially. If you have any questions, please contact the Compliance Project Manager assigned to this project.  

Power Plant Certification and Exemption Processes

The CEC has the exclusive authority to certify all thermal power plants 50 megawatts (MW) and larger and related facilities proposed for construction in California. The Application for Certification (AFC) process is a certified regulatory program under the California Environmental Quality Act (CEQA). As a certified regulatory program, the CEC does not prepare environmental impact reports (EIRs) in an AFC proceeding, but instead prepares environmental assessment documents that are functionally equivalent to EIRs. A certificate issued by the CEC is in lieu of any permit, certificate, or similar document otherwise required by any state, local or regional agency, or federal agency to the extent permitted by federal law, and supersedes any applicable statute, ordinance, or regulation of any state, local, or regional agency, or federal agency to the extent permitted by federal law.

Original Proceeding

e-Commenting has been closed. Please submit your comments in compliance proceeding above.

Docket Log (09-AFC-08)

Exhibit List

Proof of Service List

Search All Power Plant Documents

Contacts

Project Manager

Anwar Ali
CME@energy.ca.gov
(Please enter project name in the email subject line)
916-698-7498

Public Participation Questions

Public Advisor
publicadvisor@energy.ca.gov
916-269-9595

Media Inquiries

Media & Public Communications Office
mediaoffice@energy.ca.gov
916-654-4989

Subscribe Genesis Solar Energy Project

Automated Email Notifications