The Building Energy Efficiency Standards (Energy Code) have solar photovoltaic (PV) system and solar ready requirements.
The solar PV system requirements apply to newly constructed low-rise residential buildings.
The solar-ready requirements are mandatory measures and applicable to buildings which do not have a solar PV system installed. When a building is built to be solar ready, applicable Energy Code requirements prepare the building for future installation of a solar energy system.
Single-Family
Presentations
Fact Sheets
- 2022 Single-Family Solar PV
- 2022 Single-Family ESS-Ready
- 2022 Single-Family Electric Ready
- Single-family and Low-rise Multifamily Solar and Battery Systems 2022 - Energy Code Ace document
- Residential Electric Readiness 2022 - Energy Code Ace document
Multifamily
Presentations
Fact Sheets
- 2022 Low-rise Multifamily Solar PV
- 2022 High-rise Multifamily Solar PV
- 2022 High-rise Multifamly Battery Storage Systems
- 2022 Multifamily Electric Ready
Nonresidential
Presentations
Fact Sheets
Residential and Nonresidential
Presentations
Residential
Fact Sheets
Guides
Nonresidential
Guides
Videos
Energy Code Ace videos will open in YouTube