The purpose of this final report is to document the process, approach, extent of success, and impact associated with the installation of the electric vehicle charging stations at the three regional offices of the San Joaquin Valley Air Pollution Control District. The report describes the process from the selection of the general subcontractor to the installation and testing of the equipment. The local economy, subcontractors, and the State of California will benefit from this project. Also, usage data will show the impact of the project on the environment in reducing the emission of criteria pollutants as well as increasing gas savings and adding electric miles. The installed infrastructure, among other factors, was successful in increasing the ownership of plug-in electric vehicles among employees.
Author(s)
Samir Sheikh, Mehri Barati, Todd DeYoung, Charlie Hemphill